15 CAR § 23-505
(c) The minimum hydrologic criteria may be reduced if properly prepared dam breach analyses show that dam failure during the SDF would cause an increase in flood level of one foot (1’) or less at, and downstream of, the first:
| Table 3Spillway Design Flood for Dams | ||
| Hazard Classification | Size | Spillway Design Flood |
| Low | Small | .25 PMF |
| Intermediate | .25 to .50 PMF | |
| *Large | .50 to .75 PMF | |
| Significant | Small | .25 to .50 PMF |
| Intermediate | .50 to PMF | |
| Large | PMF | |
| High | Small | .50 PMF to PMF |
| Intermediate | PMF | |
| Large | PMF | |
| Note: Where ranges are given in this table, the spillway design flood shall be determined by straight line interpolation, based upon the effective height of dam or maximum storage, whichever computed SDF is greater.*SDF shall be extrapolated at the same rate of change as an intermediate size dam to a maximum of .75 PMF. |