Ala. Code § 25-9-271 (2026)
Maintenance, Etc., of Banks; Overburden, Etc., of Open Pits.
(Acts 1949, No. 207, p. 242, §73; Acts 1975, 4th Ex. Sess., No. 147, p. 2866, §1.)
- (a) Guards. Excavations shall be provided with substantial barriers at points where passageways, tracks, roadways, or buildings adjoin such excavation.
- (b) Loose material. All pit walls shall be kept free of unsafe loose materials. Hazardous areas shall be flagged, and no work shall be permitted in such areas.
- (c) Scaling. Safe, acceptable methods shall be used for removing loose materials from the highwalls.
- (d) Slope of material. Spoil piles shall be kept safely sloped to prevent loose material from sliding into the work area.
- (e) Overburden. The area immediately above the highwall shall be cleared to a safe distance to prevent loose hazardous material from falling into the pit.
(Acts 1949, No. 207, p. 242, §73; Acts 1975, 4th Ex. Sess., No. 147, p. 2866, §1.)