Performance Standards Surface Mining Activities
Alabama Surface Mining Commission
880-X-10C-.01
Scope
880-X-10C-.02
Objectives
880-X-10C-.03
Signs And Markers
880-X-10C-.04
Casing And Sealing Of Drilled Holes: General Requirements
880-X-10C-.05
Casing and Sealing Of Drilled Holes: Temporary
880-X-10C-.06
Casing And Sealing Of Drilled Holes: Permanent
880-X-10C-.07
Topsoil: General Requirements
880-X-10C-.08
Topsoil: Removal
880-X-10C-.09
Topsoil: Storage
880-X-10C-.10
Topsoil: Redistribution
880-X-10C-.11
Topsoil: Nutrients And Soil Amendments
880-X-10C-.12
Hydrologic Balance Protection
880-X-10C-.13
Hydrologic Balance: Water Quality Standard And Effluent Limitations
880-X-10C-.14
Diversions
880-X-10C-.15
(Not Used)
880-X-10C-.16
Hydrologic Balance: Sediment Control Measures
880-X-10C-.17
Hydrologic Balance: Siltation Structures
880-X-10C-.18
Hydrologic Balance: Discharge Structures
880-X-10C-.19
Hydrologic Balance: Acid-Forming And Toxic-Forming Spoil
880-X-10C-.20
Impoundments
880-X-10C-.21
Hydrologic Balance: Ground Water Protection
880-X-10C-.22
Hydrologic Balance: Protection of Ground Water Recharge Capacity
880-X-10C-.23
Hydrologic Balance: Surface And Ground Water Monitoring
880-X-10C-.25
Hydrologic Balance: Water Rights And Replacement
880-X-10C-.26
(Not Used)
880-X-10C-.27
Postmining Rehabilitation Or Removal Of Sedimentation Ponds, Diversions, Impoundments, And Treatment Facilities
880-X-10C-.28
Hydrologic Balance: Stream Buffer Zones
880-X-10C-.29
Coal Recovery
880-X-10C-.30
Use Of Explosives: General Requirements
880-X-10C-.31
Use Of Explosives: Preblasting Survey
880-X-10C-.32
Use Of Explosives-Blasting Schedule
880-X-10C-.33
Use Of Explosives: Blasting Signs, Warning And Access Control
880-X-10C-.34
Use Of Explosives: Control Of Adverse Effects
880-X-10C-.35
Use Of Explosives: Records Of Blasting Operations
880-X-10C-.36
Disposal Of Excess Spoil
880-X-10C-.37
Protection Of Underground Mining
880-X-10C-.38
Coal Mine Waste: General Requirements
880-X-10C-.39
(Not Used)
880-X-10C-.40
Coal Mine Waste: Refuse Piles
880-X-10C-.41
Coal Mine Waste: Impounding Structures
880-X-10C-.42
(Not Used)
880-X-10C-.43
Coal Mine Waste: Burning And Burned Waste Utilization
880-X-10C-.44
(Not Used)
880-X-10C-.45
Disposal Of Noncoal Mine Wastes
880-X-10C-.46
(Not Used)
880-X-10C-.47
(Not Used)
880-X-10C-.48
(Not Used)
880-X-10C-.49
Protection Of Fish, Wildlife, And Related Environmental Values
880-X-10C-.50
Slides And Other Damage
880-X-10C-.51
Contemporaneous Reclamation
880-X-10C-.52
Backfilling And Grading: Timing
880-X-10C-.53
Backfilling And Grading: General Requirements
880-X-10C-.54
Backfilling And Grading: Thin Overburden
880-X-10C-.55
Backfilling And Grading: Thick Overburden
880-X-10C-.56
Backfilling And Grading: Previously Mined Areas
880-X-10C-.57
Regarding Or Stabilizing Rills And Gullies
880-X-10C-.58
Revegetation: General Requirements
880-X-10C-.59
(Not Used)
880-X-10C-.60
Revegetation: Revegetation Timing And Soil Stabilization Practices
880-X-10C-.61
(Not Used)
880-X-10C-.62
Revegetation: Standards For Success
880-X-10C-.63
(Not Used)
880-X-10C-.64
Cessation Of Operations: Temporary
880-X-10C-.65
Cessation Of Operations: Permanent
880-X-10C-.66
Postmining Land Use
880-X-10C-.67
Roads: General
880-X-10C-.68
Primary Roads
880-X-10C-.69
(Not Used)
880-X-10C-.70
(Not Used)
880-X-10C-.71
(Not Used)
880-X-10C-.72
Other Transportation Facilities
880-X-10C-.73
Support Facilities And Utility Installations