- (1) Prior to issuance of the Permit to Install (Repair), the soil professional or PHESS shall certify that the soil tests are true and accurate by signing the certification in ADPH Form CEP-2/3 Part C.
- (2) For a permit application for Small-Flow Developments or Systems, the responsible person shall sign the certification in ADPH Form CEP-2. For a permit application for Large-Flow Developments or Systems, the responsible person shall sign the certification in ADPH Form CEP-3.
- (3) For an Engineered OSS or EDS, the engineer (see 420-3-1-.09 Engineer Design Required) shall certify that the design of the system will meet applicable performance standards by signing the certifications in ADPH Form CEP-2 or CEP-3, as appropriate.
- (4) For a Conventional OSS, the soil professional or the PHESS shall certify the information outlined in ADPH Form CEP-2 or CEP-3 is complete, true, and correct.
- (5) Prior to issuance of the Approval for Use, the installer shall certify the installation by submitting ADPH Form CEP-5 within 3 business days of the installation.
- (6) Prior to issuance of the Approval for Use, for a system designed by an engineer as required by 420-3-1-.09 Engineer Design Required, the engineer shall certify the installation by submitting ADPH Form CEP-6.
Author: Thad Pittman, Matthew Conner, Ken Stephens, Bob Bright
Statutory Authority: Code of Ala. 1975, §§22-2-2(4); 22-2-2(6); 22-10-1, et seq.; 22-26-1, et seq.
Editor’s Note: Previous Rule .49 was renumbered .34 per certification published December 30, 2022; effective February 13, 2023.
History: New Rule: Filed October 20, 2005; effective November 24, 2005; operative March 19, 2006. Repealed and New Rule: Filed January 19, 2017; effective March 5, 2017. Repealed and New Rule: Published December 30, 2022; effective February 13, 2023.