Ala. Admin. Code r. 400-8-1-.30
1. The storage operator shall ensure that all injection wells are constructed and completed to prevent movement of the carbon dioxide stream or fluids into underground sources of drinking water or outside the authorized storage reservoir. Further, the storage operator shall ensure that all injection wells are constructed and completed to protect Alabama’s natural resources. The injection wells must be constructed and completed in a way that allows the use of appropriate testing devices and workover tools. The casing and cement or other materials used in the construction of each new injection well must be designed for the well's life expectancy. In determining and specifying casing and cementing requirement , all of the following factors must be considered:
2. Surface casing in all newly drilled carbon dioxide injection and subsurface observation wells drilled below the underground source of drinking water must be set fifty (50) feet below the base of the lowermost underground source of drinking water and cemented.
3. The long string casing in all injection and subsurface observation wells must be cemented. Sufficient cement must be used on the long string casing to fill the annular space behind the casing to the surface and a sufficient number of centralizers shall be used to assure a good cement job. The long string casing must extend to the injection zone.
4. Any liner set in the well bore must be cemented with a sufficient volume of cement to fill the annular space.
5. All cements used in the cementing of casings in injection and subsurface observation well must be of sufficient quality to maintain well integrity in the carbon dioxide injection environment. Circulation of cement may be accomplished by staging. The Board may approve an alternative method of cementing in cases where the cement cannot he recirculated to the surface, provided the storage operator can demonstrate by using logs that the cement does not allow fluid movement behind the well bore.
6. All casings must meet the standards specified in any of the following publications, which are hereby adopted by reference:
7. All casings used in new wells must be new casing or reconditioned casing of a quality equivalent to new casing and that has been pressure-tested.
8. The location and amount of cement behind casings must be verified by an evaluation method approved by the Board. The evaluation method must be capable of evaluating cement quality radially and identifying the location of channels to ensure that underground sources of drinking water are not endangered.
9. All injection wells must be completed with and injection must be through tubing and packer. In order for the Board to determine and specify requirements for tubing and packer, the storage operator shall submit the following information:
10. All tubing strings must meet industry standards. All tubing must be new tubing or reconditioned tubing of a quality equivalent to new tubing and that has been pressure-tested.
11. All wellhead components, including the casinghead and tubing head, valves, and fittings, must be made of steel having operating pressure ratings sufficient to exceed the maximum injection pressures computed at the wellhead and to withstand the corrosive nature of carbon dioxide. Each flow line connected to the wellhead must be equipped with a manually operated positive shutoff valve located on or near the wellhead.
12. All packers, packer elements, or similar equipment critical to the containment of carbon dioxide must be of a quality sufficient to withstand exposure to carbon dioxide.
13. All injection wells must have at all times an accurate, operating pressure gauge or pressure recording device. Gauges must be calibrated as required by the Board and evidence of such calibration must be available to the Board upon request.
14. All newly drilled wells must establish internal and external mechanical integrity and continued mechanical integrity through periodic testing. All other wells to be used as injection wells must demonstrate mechanical integrity prior to use for injection and be tested on an ongoing basis.
15. The Board has the authority to witness all mechanical integrity tests conducted by the storage operator.
16. If an injection well fails to demonstrate mechanical integrity by an approved method, the storage operator shall immediately shut in the well, report the failure to the Board, and commence isolation and repair of the leak. The operator shall, within ninety days or as otherwise directed by the Board, perform one of the following:
Author: S. Marvin Rogers
Statutory Authority: 9-17-150 et seq. of the Code of Alabama (1975)
History: New Rule: Published November 27, 2024; effective January 11, 2025.