Alaska Admin. Code tit. 3, § 107.250
Power cost equalization and the commission
Effective Feb 16, 1996Alaska Register 137(Eff. 2/16/96, Register 137) | Authority: AS 42.45.100, AS 42.45.130, AS 42.45.170, AS 42.45.110, AS 42.45.150, AS 44.83.080, AS 42.45.120, AS 42.45.160
- (a) The authority and the commission have statutory responsibilities in furtherance of the power cost equalization program.
- (b) 3 AAC 107.200 - 3 AAC 107.270 should be read together with 3 AAC 52.600 - 3 AAC 52.690.
(Eff. 2/16/96, Register 137)
Authority: AS 42.45.100, AS 42.45.130, AS 42.45.170, AS 42.45.110, AS 42.45.150, AS 44.83.080, AS 42.45.120, AS 42.45.160