- (a) A customer whose facility has more than one meter will only receive power cost equalization credit for the master meter.
- (b) Power consumption measured by a station service meter required in 3 AAC 107.200 is not eligible for power cost equalization credit.
(Eff. 2/16/96, Register 137)
Authority: AS 42.45.100, AS 42.45.160, AS 44.83.080, AS 42.45.110, AS 42.45.170