Alaska Admin. Code tit. 20, § 25.1070
(b) The storage operator shall prepare, maintain, and comply with a plan to delineate the area of review for a proposed storage facility, periodically reevaluate the delineation, and perform corrective action that meets the requirements of this section and is acceptable to the commission. The requirement to maintain and implement an approved plan is directly enforceable regardless of whether the requirement is a condition of the storage facility permit. As a part of the permit application, the storage operator shall submit an area of review and corrective action plan that includes the following information:
(2) a description of
(c) The storage operator shall perform the following actions to delineate the area of review and identify all wells that require corrective action:
(1) predict, using existing site characterization, monitoring and operational data, and computational modeling, the projected lateral and vertical migration of the carbon dioxide plume and formation fluid in the subsurface from the commencement of injection activities until the plume movement ceases, until pressure differentials sufficient to cause the movement of injected fluid or formation fluid into a underground sources of drinking water are no longer present, or until the end of a fixed time period as determined by the commission; the model must:
(e) At the minimum fixed frequency, not to exceed five years, as specified in the area of review and corrective action plan, or when monitoring and operational conditions warrant, the storage operator shall: