The plan must
- (1) provide a mathematical calculation of the applicable response planning standards set out in 18 AAC 75.430 - 18 AAC 75.440 and 18 AAC 75.442;
- (2) include a detailed calculation and justification of reductions to the response planning standard; and
- (3) include an estimate of the percentage of the applicable response planning standard volume set out at 18 AAC 75.430 - 18 AAC 75.436, and 18 AAC 75.442 based on calculations in (1) and (2) of this section for the facility or operation that will reach open water, and based on the receiving environment information in 18 AAC 75.451(c).
(Eff. 2/5/2023, Register 245)
Authority: AS 46.03.020, AS 46.04.035, AS 46.04.070, AS 46.04.030, AS 46.04.055