(a) Plans for construction of a stabilization pond must include
- (1) the items required to be submitted under 18 AAC 72.245;
- (2) criteria for dike design, materials, construction, and safety;
- (3) methods and the location for disposal of non-piped wastewater, including truck-hauled waste and honey bucket disposal;
- (4) a soils analysis and report meeting the criteria of 18 AAC 72.265;
- (5) for non percolating stabilization ponds, a coefficient of permeability of the pond liner that does not exceed an equivalent percolation rate of 500 gallons per day per acre at a water depth of six feet; and
(6) for percolating stabilization ponds,
- (A) hydrologic data and groundwater modeling demonstrating compliance with any permit issued under this chapter; and
- (B) information demonstrating that the use of the stabilization pond will not interfere with existing public and private drinking water sources.
- (b) To obtain an approval to operate a stabilization pond, the applicant shall submit to the department items required under 18 AAC 72.240.
(Eff. 4/1/99, Register 149; am 10/1/2023, Register 247)
Authority: AS 44.46.020, AS 46.03.020, AS 46.03.100, AS 46.03.010, AS 46.03.050, AS 46.03.110