(a) A plan submitted for department approval under 18 AAC 72.200 for construction or modification of a wastewater treatment works must include
- (1) the items required to be submitted under 18 AAC 72.205;
- (2) plans, reports, and drawings sealed by a registered engineer;
(3) the design calculations or design criteria for the following parameters:
- (A) design flows and wastewater loading rates;
- (B) treatment capacities and expected effluent quality;
- (C) selection and arrangement of unit operations and processes;
- (D) material and equipment selection and specifications;
- (E) siting with respect to potential for health hazards, nuisances, flooding, and effect on groundwater and surface waters;
- (F) bedding, backfill and final grading;
- (G) methods to control operational variables;
- (H) methods and location of disposal of septage, sludges, grit, screenings, and other facility residuals;
- (I) thermal protection considerations; and
- (4) provisions demonstrating that facility bypasses are controlled and bypasses will not result in a discharge of wastewater that does not meet applicable minimum treatment requirements of this chapter.
(b) The separation distance from each part of the treatment works must
- (1) meet the minimums set out in 18 AAC 80 for a public water system, unless the department has approved a lesser separation distance under that chapter;
- (2) meet the minimums set out in 18 AAC 72.100 for a private water system, unless the department has approved a lesser separation distance under this chapter; and
- (3) be a minimum of 100 feet from the mean annual high water level of a lake, river, stream, spring, or slough, or the mean higher high water level of tidally influenced coastal waters.
(c) To obtain an approval to operate a wastewater treatment works, the applicant shall submit to the department
- (1) items required under 18 AAC 72.240; and
- (2) if requested, a copy of the operations and maintenance manual developed in accordance with manufacturer recommendations and specifically addressing the system as installed.
- (d) If a discharge permit is not required, the department may require periodic testing and reports that demonstrate the system meets expected performance criteria.
(Eff. 4/1/99, Register 149; am 7/29/2006, Register 179; am 10/1/2023, Register 247)
Authority: AS 44.46.020, AS 46.03.020, AS 46.03.100, AS 46.03.010, AS 46.03.050, AS 46.03.110