- (a) Except where a different time is specified in 18 AAC 60.395(f) or is otherwise approved by the department, the owner or operator of a landfill shall place the final cover on those waste management areas that have reached final elevation within 90 days after the last waste placement.
- (b) The requirements of this section do not apply to an inactive drilling waste disposal site.
(Eff. 1/28/96, Register 137)
Authority: AS 44.46.020, AS 46.03.100, AS 46.06.080, AS 46.03.010, AS 46.03.110, AS 46.03.020, AS 46.03.810