Permit fees and charges
Effective Jul 15, 2009Alaska Register 191(Eff. 5/23/82, Register 82; am 7/4/87, Register 102; am 7/15/2009, Register 191) | Authority: AS 02.15.020, AS 19.05.040, AS 35.10.210, AS 02.15.102, AS 19.25.200, AS 35.10.230, AS 02.15.106, AS 19.30.121, AS 35.25.020, AS 02.15.260, AS 19.40.065, AS 44.42.020, AS 19.05.020, AS 35.05.020, AS 44.42.030
(a) The applicant shall pay a $600 nonrefundable fee in a form acceptable to the department for those permits, including amendments, that allow
- (1) installations of aerial or underground distribution and transmission lines;
- (2) duct systems;
- (3) utilidors and utility tunnels, including crossings and extensions;
- (4) structure or appurtenance construction, including manholes, utility poles, pedestals, switch cabinets, transformers, and other design features of a similar nature;
- (5) a crossing or installation, including service connections, requiring boring, trenching, or opening a roadway surface; and
- (6) aerial service lines requiring installation of poles in a right-of-way.
(b) The applicant shall pay a $100 nonrefundable fee in a form acceptable to the department for those permits, including amendments, that allow
- (1) aerial service lines not requiring structures within the right-of-way, including service lines from longitudinal distribution lines outside a right-of-way and service lines attached to existing poles; and
(2) installation of underground service lines that
- (A) do not occupy any portion of the roadway prism; and
- (B) connect to existing poles, pedestals, manholes, collection systems, distribution facilities and similar structures within the right-of-way.
- (c) Upon the issuance of a utility permit under (a) of this section, if the proposed facility is more than 200 feet in length, the permittee shall pay the department a nonrefundable fee, not to exceed $10,000, of $1 per foot of length in excess of 200 feet.
- (d) The department may require a permittee to reimburse the department for the actual cost of inspection if the special provisions of the utility permit require an inspection.
(Eff. 5/23/82, Register 82; am 7/4/87, Register 102; am 7/15/2009, Register 191)
Authority: AS 02.15.020, AS 19.05.040, AS 35.10.210, AS 02.15.102, AS 19.25.200, AS 35.10.230, AS 02.15.106, AS 19.30.121, AS 35.25.020, AS 02.15.260, AS 19.40.065, AS 44.42.020, AS 19.05.020, AS 35.05.020, AS 44.42.030