40 N.Y.S. 899 | N.Y. App. Div. | 1896
The plaintiff brings this action against the defendant to recover damages for personal injuries sustained by him in consequence of an accident which occurred upon the 15th day of September, 1894.
The undisputed evidence in the case shows that the defendants, A. Friederich & Sons, who are builders and contractors, residing at the city of Rochester, in this State, entered into a contract with the State to erect a three-story brick building, to be used as an annex to the Rochester State Hospital.
The mason and brick work was all done by the principal contractors, but the carpenter work was performed under a separate contract entered into between the defendant Seitz and the principal contractors, by which the former was to work directly from plans and specifications furnished, the principal contractors having no control over him, either in the selection of the materials used or in the performance of the work.
At the time of the accident the building was nearly completed ; the outside walls had been laid to the level of the bottoms of the joists and tie beams of the trusses. The tie beams running north and south, and the joists east and west, the east end of those of the east span resting upon, but in no manner fastened to, the east wall, were in place, and the attic floor had been laid.
The masons were about to begin bricking in between the joists and to construct the cornice of the wall, and two of them were at work bricking in between the joists on the north side of the- north wall of the annex building, which was the division wall between that building and the kitchen building. There were a few piles of brick upon the floor, mostly along the south wall, and there was nothing resting upon the tie beam except the joists and floor.
The plaintiff, who was in the employ of Friederich & Sons, was
There was no contractual relation existing between these parties, and, therefore, the liability of the defendant for the injuries received by the plaintiff, if any exists, results from his failure to observe the obligation which the law imposes upon a party engaged in the prosecution of any work, of performing the same in such a manner as not to endanger the lives or persons of other parties. This is a very well-settled principle, and it is applicable to all cases where a person is engaged in the performance of work which, without the exercise of a reasonable degree of care and prevision, may be attended with risk and danger to others ; and a case in point is that of Mullen v. St. John (57 N. Y. 567), in which it was held that the owner of a building adjoining a street or highway is under a legal obligation to take reasonable care that the building shall not fall into the street or highway and injure persons lawfully there.
The facts of the ease in hand show that, while the plaintiff was not in the employ of the defendant, he was in the employ of the principal contractors, and that, while in the performance of his duty as their employee, he had occasion to go into the attic of this building, and upon the floor which had been constructed under the immediate supervision and direction of the defendant. He was, therefore, laAvfully there, and he had a right to assume that while there he would not be exposed unnecessarily by the defendant to any danger to his life or person. For the defendant’s omission of his duty in this regard the plaintiff seeks to charge upon him the consequences Avhich followed.
The difficulty in this case which has provoked much discussion and contention arises from the fact that it is claimed that, after the accident, it was impossible to obtain any adequate and satisfactory explanation of its proximate cause. It is true that it was found, upon examination, that the beam running from the north to the south wall of this building was broken about fourteen feet from the
In disposing of this contention on the part of the .defendant, it may be assumed that the precise cause of the accident has not been made to clearly appear; and yet we think it was within the province of the jury, and that the trial court was right in submitting the. question as one of fact to them, to determine from all the evidence in the case whether or not it could be fairly said that this defendant was legally liable for the injuries received by the plaintiff.
It is undoubtedly a general principle of law applicable to cases of negligence that before a plaintiff is permitted to recover, he shall be required to fasten the responsibility for his injuries upon the defendant with some degree of certainty. In other words, that he shall point out and be able to place his finger upon the particu
And in the case of Mullen v. St. John (supra) it was held that the happening of such an accident, that is, the fall of a building, in the absence of explanatory circumstances, creates a presumption of negligence, and casts upon the owner the burden o£_,showing the use of ordinary cafe.
We have recently had occasion to apply this rule in a case where the cause of the accident was not clearly established (Dumes v. Sizer, 3 App. Div. 11), and the authorities supporting it are quite numerous, many of which are cited in the opinion in that case.
We think, therefore, that with a presumption, arising in the case from the conceded facts therein, that the giving way of the floor in question was attributable to negligence upon the part of the person responsible for its construction, the defendant was called upon to-show that he had exercised that reasonable degree of care in constructing the floor which was required of him, and which, had it been exercised, would have relieved him from all liability for the accident which befell the plaintiff.
The defendant did furnish evidence which was designed by him to repel any presumption of negligence which might exist in the case. That evidence has already been adverted to, and when taken in connection with the fact that the floor fell, and that this beam and support were found to be broken, and the former at the very point where the knots and hole and mortise existed, it seems very clear that an issue was presented to the jury which permitted them to fasten the responsibility for this accident upon the defendant, without extending their inquiries into the realm of speculation and
We have examined the various exceptions taken by the defendant’s counsel to the charge of the court and the refusal of the court to charge in accordance with certain requests, and we are unable to discover that any error was committed which requires a retrial of the case. We, therefore, conclude that the case was properly submitted to the jury; that their verdict was sustained by the evidence, and that consequently the order appealed from should he affirmed.
All concurred.
Judgment and order affirmed, with costs.