102 Cal. 134 | Cal. | 1894
Upon further consideration of this cause in Bank, we are satisfied with the conclusion
De Haven, J., did not participate in the foregoing decision.
The following is the opinion of Department One-above referred to:
Temple, C.—The general nature of this case is well stated in the first finding of facts, which is as follows:
“ The defendant, the Mountaineer Gold Mining Company, a corporation, at all the times referred to in the pleadings in the cause was the owner and in the possession of and working a certain mine known as the Berger or Mountaineer quartz mine, situate in said Sierra county, and consisting of some seven contiguous-mining locations, four of which are quartz mining locations and. three placer mining locations, with their respective appurtenances.
“ The plaintiff, T. Williams, and twenty-four others-commenced a joint action July 28, 1891, to foreclose-certain miners’ liens respectively, which had heretofore-been filed against said property for labor performed thereon at' various periods, dating from the 9th of October, 1890, to the 11th of July, 1891; T. Berger was also a party plaintiff to this action, but the suit as to-him was subsequently dismissed.
“ Prior to the commencement of last-named action,, to wit: on April 28, 1891, John Hayes had brought an action against said defendant corporation to foreclose a. mechanic’s lien, filed against the ‘ Mountaineer reduction works, tramway, and flume,’ situate on the ‘ Lake-Placer claim,’ one of the locations above referred to.
“ The Hayes lien was filed for record February 2,1891,. and was for lumber and materials furnished by said Hayes between July 20 and December 31, 1890, to housed in the construction of the said reduction works, etc.
*137 “The action of T. Williams et ais. and that of Hayes were by order of court consolidated August 24, 1891.
“ On September 26, 1891, Stephen Tippett and four others brought suit against defendant corporation similar to the Williams suit, and to foreclose liens against the same property. Three of these liens were for labor performed on said property from May 25 to July 11,1891, and one of them for materials claimed to have been furnished between January 1 and July 11,1891, to be used on said mining property.
“ This last action was by order of the court, made October 5, 1891, consolidated with the two actions previously consolidated as aforesaid.
“The reduction works or quartz-mill on and connected with said mining property were completed January 4,1891.
“ Bobert Forbes is made a party to the action as one claiming ownership to a certain rock-breaker and amalgamating-pan attached to said mill by means of bolts, etc.
“William Johns is made a party to the action as one claiming ownership to certain mining machinery attached to said quartz-mill. The Johns claim is based on a chattel mortgage, covering said mining machinery, duly executed on behalf of the then owners of said Mountaineer quartz mine on the fifteenth day of October, 1890. The property claimed to be covered by the mortgage is described therein as ‘certain machinery’ for quartz milling, consisting of ten battery stems, ten tappets, ten sockets, ten cams, one cam shaft, two mortars, two challenge feeders, one Knight water-wheel, shafting and pulleys belonging to wheel, all to be put into, and made a part of, the mill of the mortgagors at the Mountain mine, in Butte township, Sierra county, California.
“ H. Scammon is made a party to the suit as one claiming an interest in all the property in suit, by reason of an attachment levied thereon as the property of*138 defendant corporation, which attachment was duly levied on the eleventh day of July, 1891.”
Judgment was entered in favor of plaintiffs and sustaining the lien of Johns, but against the claim of the appellant, who appeals from the judgment and an order refusing him a new trial.
It. will be seen that there are some thirty claimants of liens upon the mine for labor performed mostly in the tunnel, but also in a variety of other employments about the mine, and that the work was done at different periods.
Appellant commenced to furnish materials for the construction of the mill, tramway, boarding-house and other buildings July 21,1890, and filed his claim of lien on February 2,1891. Two of the plaintiffs commenced work before he filed his claim of lien, but all the others commenced work after his claim of lien was filed and many after he had commenced his action to foreclose his lien. The plaintiffs in the third action on behalf of lien claimants commenced their work after the plaintiffs in the second suit had filed their notice' of lien. It is obvious at once that this state of things could not exist in a case for the foreclosure of liens for labor and material used in the construction of a building under contract.
The most important question in the case arises from the fact that appellant only claims a lien upon the reduction works, and filed his notice and claim of lien accordingly, while the plaintiffs in the two suits seek to establish liens upon the whole mining claim, including the reduction works, and described it all in their notice and claim of lien.
They contend that the mill, tramway, hoarding-house and other structures described in appellant’s notice and claim of lien constitute a part only of the property for the improvement of which Hayes furnished lumber, and that he cannot have a lien upon a part only of the structures or property constructed, altered, or improved. The trial court sustained this view.
“Mechanics, materialmen, contractors, subcontractors, artisans, architects, machinists, builders, miners, and all persons and laborers of every class, performing labor upon or furnishing materials to be used in the construction, alteration, or repair, either in whole or iii part, of any building, wharf, bridge, ditch, flume, aqueduct, tunnel, fence, machinery, railroad, wagon-road, or other structure, shall have a lien upon the property upon which they have bestowed labor or furnished materials, for the value of such labor done and materials furnished . . . . and any person who performs labor in any mining claim or claims has a lien upon the same, and the works owned and used by the owners for reducing the ores from such mining claim or claims, for the work or labor done, or materials furnished,” etc.
The use of the phrase “other structure” in the above extract shows that the word “ structure” comprehends all the properties specifically enumerated, and is broad enough to include any similar thing constructed, should the enumeration prove incomplete. Following this with the language “ and any person who” it would seem to show that a mining claim was not included in the structures upon w'hich liens were allowed. And the procedure provided for acquiring liens upon structures are not, in all respects, applicable to those claiming liens upon mining claims. They cannot all date back to the commencement of the work. On a mine the work is always going on; may have commenced before the laborers were born, and may continue indefinitely. There is no special thirty days, therefore, within which lienors must record their notices and claim of lien.
The labor cannot generally be said to have contributed to the creation of the property, or added to its value; on the contrary, it may diminish its value—perhaps render it valueless.
The code does not seem to have provided for all the cases which may arise in regard to liens upon mining
Appellant contends that he furnished materials for the structures he has described in his notice of lien, and under section 1183 he is entitled to a lien upon the property for which he has furnished materials. He therefore insists that although a lien might have been had upon the whole mine—which, howuver, he does not concede—he is entitled to charge the very structures he has contributed to make for the value of his materials.
The same sort of argument might have been made for those who worked in the tunnel had they sought to acquire a lien upon the tunnel only, and those who worked on the ditch and flume had they sought a lien upon those structures only. In such case had each of the supposed liens been foreclosed, and the structures sold to different purchasers and the mine to another, each purchaser might have found himself the owner of property utterly valueless without the other parts. They were all parts of one entire property, and we cannot suppose, unless the language of the statute compels such conclusion, that such a result was contemplated.
One who has built a chimney in a house, or a porch, or a doorstep, has helped to build a structure, to wit: a chimney, a porch, or doorstep; but he cannot acquire a lien upon these specific structures, and by detached sales destroy the value of the claims depending upon liens upon the whole house. A structure may be a part of another larger structure, fend in reference to it constitute but a part of a structure. In such cases it is well settled the lien must cover the entire structure. It was so held in Cox v. Western Pacific R. R., 44 Cal. 28. See, also, Farmers’ Loan and Trust Co. v. Candler, 87
In the case at bar the tramway extends to the mouth of the tunnel. To sell it, with a convenient space around it, would be to deprive the owners of the tunnel, and yet not give the tunnel to the purchaser. What would be a convenient space around a structure which can never be of use as a structure? All these structures, severed from the mine, would be valueless as structures.
The question has, I think, been decided by this court. In Dickenson v. Bolyer, 55 Cal. 285, work had been done upon a dwelling-house situate upon a mining claim, and also upon a tunnel and other portions of the mining claim. Objection was made that the claim of lien filed did not designate the amount and value of the work done on the dwelling-house, and the amount and value of the work done on the tunnel, as required by section 1188 of the Code of Civil Procedure. The court said: “It”—the section—“plainly applies only to cases in which one claim is filed against two or more separate and distinct buildings, mining claims, or other improvements owned by the same person, and not to a case where, as here, all the work was performed upon one and the same piece of property, although upon different portions of it.” In Helm v. Chapman, 66 Cal. 291, it was said a mine or pit may be called a structure, and “ section 1183 does not, it is true, provide for a lien upon mines, but upon ‘mining claims. The lien, if it exists at all, extends to the whole claim. Strictly speaking, of course, a mining
“ The lien given by the statute is upon the mining claim as a whole, and not upon the separate pieces of work done in its repair. (Code Civ. Proc., sec. 1183.) The mine is a structure within the meaning of the statute. (Helm v. Chapman, 66 Cal. 291.) The work done in this case became and was a part of the mining claim, and the whole claim, including the added improvements, was subject to the lien. (Civ. Code, sec. 661.) Therefore, the notice of lien, as against the mining claim, was valid.”
This is a distinct ruling to the effect that a claim of lien for materials furnished, to be used in a building upon a mining claim, should be against the mining claim and not against the specific structure upon the mine.
Appellant further contends that his lien attached before the mill was used in connection with the mine, and before, therefore, it became an appurtenance under section 1183 of the Code of Civil Procedure, or section 661 of the Civil Code. As his lien attached at the time the * mill was commenced, it, of course, antedates its use. But I think, in this case, the mill is not a mere appurtenance for the mine. It is upon the mining claim and like the tunnels, tramways, and roads, is a part of the
It is further objected that the title to that portion of the mining claim upon which the mill was located was not acquired until after his lien attached.
Appellant found the corporate defendant in possession of the premises, claiming it all as its mining claim, and furnishing materials to improve its claim; in this action he cannot dispute its title. Title cannot be tried in this form of action.
If these views are correct, appellant has no lien, and is not interested in the other points made.
I advise that the judgment and order be affirmed.