106 Minn. 208 | Minn. | 1908
This cause was here on a former appeal (103 Minn. 43, 114 N. W. 262), where the facts are fully stated. Defendant school district entered into a contract with one Phelps for the construction of a schoolhouse, but failed to take from him the bond required by the provisions of chapter 321, p. 535, Daws 1901, for the protection of laborers and materialmen.
We held on the former appeal that under the language of the statute the liability of the district was not absolute, but only to the extent of such loss as those entitled to rely upon the bond had suffered in consequence of the inability of the contractor to pay the obligations incurred by him in the prosecution of the work. The statutes provide that in case of a failure to require a bond the corporation shall be liable to those furnishing labor or material “to the extent of any loss they may incur by reason of said neglect.” In construing the
The cause was remanded for a second trial, on which the sole issue presented was the solvency or insolvency of the contractor. The court instructed the jury that if he was solvent at the time of or after the maturity of plaintiff’s claim, or then had money or property not exempt from execution which could have been reached by appropriate legal proceedings, plaintiff could not recover.
The assignments of error on this appeal present the single question whether the evidence sustains the verdict for the defendant. The jury must have found, within the instructions of the court,, that the contractor was either solvent or at least that he had money or property after the maturity of plaintiff’s claim out of which collection thereof could have been made. Our examination of the evidence, though it is not entirely satisfactory, leads to an affirmance. There is evidence in the record reasonably tending to show that soon after plaintiff’s claim became due the contractor had, to the knowledge of plaintiff, money on deposit in a bank, which he received from the defendant for the construction of the building, and which could have been reached had proceedings been commenced for that ¡purpose. But none were commenced, and the contractor thereafter withdrew the money, and then became wholly insolvent. He may have been insolvent all along, as insolvency is generally understood; but if plaintiff, as the evidence tends to show, permitted him to make away with the money received under the contract for tbe construction of the building, without an effort to intercept it, it is in no position to insist that defendant pay the amount a second time.
Order affirmed.