Plaintiffs brought this action alleging violations of several provisions of the Salem Revised Code (SRC) stemming from excavation and construction of a home and a retaining wall on property that adjoins and lies downhill from their property. Defendants are Jared and Crystal Vogt, who own the neighboring property, Kevin Stone, the contractor who performed the excavation and construction, and the City of Salem. Plaintiffs asserted claims for declaratory relief, writ of review, writ of mandamus, negligence, and injunctive relief. They alleged that Stone had excavated thе Vogts’ property in a manner that removed lateral support for plaintiffs’ property, leaving it vulnerable to landslides. Plaintiffs also alleged that the city had allowed the excavation and subsequent construction of a home and a retaining wall without properly conducting a landslide hazard analysis and without requiring Stone and the Vogts either to prove that the excavated slope is safe or to build a taller retaining wall and restore the slope to the minimum otherwise allowed by the SRC.
The trial court dismissed the claims against the Vogts and all but the writ of review clаim against the city. On that claim, the court granted summary judgment in the city’s favor. The court also awarded prevailing-party fees to the Vogts and the city as well as attorney fees to the Vogts. Plaintiffs appeal the limited judgment disposing of the claims against the Vogts and the city and the supplemental judgment awarding defendants their fees.
Before we recite the pertinent facts, an overview of some of the SRC provisions at issue is helpful. Two chapters in the code are pertinent. The first, SRC chapter 65, governs excavation and filling of property. SRC 65.040 generally describes conditions under which an excavation permit is required. SRC 65.050(a), which limits excavation under certain circumstances, provides, in part:
“Except as provided in this subsection and in SRC 65.080, no excavation shall leave a cut slope greater than two horizontal to one vertical.
“EXCEPTION: Excavations may exceed this limitation when they are in conjunction with a building permit and the final grade after backfill will not exceed a 2:1 slope.”2
Under SRC 65.080, the limitations imposed in SRC 65.050
“may be varied by the director [of public works] if a qualified engineer designs and oversees the prescribed work and provides the director with all supportive data necessary to establish to his satisfaction that the alternative design provides equal or better safety, durability, and protection of adjacent property than compliance with the standards of SRC 65.050***.”
The second pertinent chapter, SRC chapter 69, addresses landslide hazards. SRC 69.030 provides that, except in circumstances not relevant here, a person may not engage in excavation or building construction “in areas designated on maps adopted under this chapter” without first obtaining any required
“The Graduated Response Table 69-1, and the criteria set forth therein shall be used by Public Works staff to determine the level of site invеstigation for various types of regulated activity on property any portion of which is shown on Landslide Hazard Susceptibility Maps. Using a rating system, slope and physiographic conditions at the site are evaluated in relationship to a proposed activity. If a rating meets or exceeds quantified thresholds provided in the table, a geological assessment or geotechnical report or both shall be provided by the applicant and action specified therein undertaken or insured before any regulated activity may be permitted or approved. Where any portion of the subject property on which regulated activities are proposed is identified under two slope conditions, or two or more physiographic and geologic categories, the highest condition or category will apply.
“(a) For Low Landslide Risk Assessments, all regulated activities may proceed without further investigation, permitting, or approval requirements of this chapter.
“(b) For Moderate Landslide Risk Assessments, a geological assessment shall be submitted by applicant and at applicant’s expense for all regulated activities. If the geological assessment indicates that mitigation measures are necessary to safely undertake the regulated activity, High Landslide Risk Assessment requirements must be met. If the geological assessment indicates that no mitigation measures are necessary to safely undertake the regulated activity, all regulated activities may proceed.
“(c) For High Landslide Risk Assessments, a geotechnical report prepared by a Certified Engineering Geologist and Geotechnical Engineer at the applicant’s expense shall bе submitted for all regulated activities.”
The “Graduated Response Table 69-1” is appended to SRC chapter 69. It establishes a five-step procedure for determining whether the landslide risk is low, moderate, or high based on points assigned in the first three steps. Characterized broadly, points are assigned based on a property’s susceptibility to earthquake-induced landslides (step one), susceptibility to water-induced landslides (step two), and the activity undertaken on the property (step three). Step four requires staff to total the points from the first three steps. Steр five provides that the landslide risk is low if the point total is four or less, moderate if the total is five to eight points, and high if it is nine “or greater.”
Finally, SRC 69.090 provides:
“No excavation or fill subject to the provisions of this chapter shall be made without an Excavation and Fill permit. The application for such permit, permit issuance, term, termination, suspension or revocation, scope, application fee, appeal and violation relative to such permit shall be as set forth in SRC 65.110 through SRC 65.990. Excavation and fill permit requirements are in addition to other requirements of this chaрter. Any geological assessment or geotechnical report required by this chapter shall accompany the Excavation and Fill permit application and shall receive approval in accordance with the provisions of this chapter prior to Excavation and Fill permit issuance.”
With those provisions in mind, we turn to the facts. The facts material to our review are undisputed. Plaintiffs’ property lies uphill from, and to the east of, defendant Vogts’ property. In January 2008, Stone applied for a building permit to construct a dwelling on the Vogts’ рroperty. In early March — before the city had issued the building permit — Stone excavated approximately 1200 cubic yards of soil from the eastern side of the Vogts’ property. Before doing the work, Stone did not obtain an excavation permit or otherwise notify the city that he intended to excavate. The upper edge of the “cut” left by the excavation is close to the fence separating
While Stone was excavating the property, a neighbor, Loriann Schmidt, called the city’s code enforcement group to express concerns about the excavation. Mike Scholz, a building and safety supervisor, visited the site the next day and then called Schmidt. He told her that no excavation permit was required but that a geotechnical engineer would have to sign off on the plans before construction could begin. Schmidt also talked to Stone, who told her that he planned to obtain a geotechnical opinion on slope stability and that he was going to build a 10-foot-high retaining wall.
Around the same time, plaintiff Evan White met with Tom Phillips, the city’s building and safety administrator. Phillips told White that “Stone did not have an excavation permit because the city does not require them” but that Stone “would be required to submit a plan for an engineered retaining wall.” Nothing in the record indicates that the city evaluated whether the excavation created a landslide hazard risk.
Two weeks later, White met with Rebai Tamerhoulet, a supervisor with the city’s plan review services. Tamerhoulet showed him “plans for exterior retaining walls of different heights, including one for construction of a ten-foot exterior detached retaining wall.”
In April 2008, the city issued the building permit to Stone, and construction on the dwelling commenced. The city did not conduct a landslide hazard assessment under SRC chapter 69 before issuing the permit for the dwelling.
In September 2008, Stone applied for a separate building permit to construct a retaining wall on the Vogt property. With the application, he submitted an engineer’s structural calculations and diagram for a four-foot-high wall along the bottom of the excavated cut. According to the engineer, backfilling behind a wall of that height would result in a slope of 100 percent. The city approved the design and issued the permit 12 days later. Nothing in the record indicates that the city conducted a landslide hazard assessment under SRC chapter 69 in connection with that permit. Stone built the wall as approved a few days later.
Plaintiffs commenced this action against Stone, the Vogts, and the city, initially seeking only declaratory relief. Over the course of several amended complaints, plaintiffs added petitions for writ of review and writ of mandamus and claims for negligence and injunctive relief. All of plaintiffs’ assignments of error and supporting arguments on appeal are directed at their claims for declaratory relief and writ of review. Accordingly, we describe only those claims, and their procedural history, in any significant detail.
In the declarаtory relief claim in the operative complaint, plaintiffs asked the court to declare the parties’ respective rights, status, duties, and interests under the SRC and other laws. In the petition for writ of review, plaintiffs sought review of the city’s decision to issue a permit for “construction of only one four-foot high detached exterior retaining wall which did not establish a final grade with a slope no steeper than 2H:1V (50%).” Plaintiffs’ mandamus petition sought an order directing the city to conduct a landslide hazard risk assessment under SRC chapter 69 for all regulated activities that were сonducted on the Vogt property. In their negligence and injunctive relief claims, plaintiffs alleged that the Vogts had breached
The Vogts moved to dismiss the claims against them under ORCP 21 A(8) for failure to state ultimate facts sufficient to constitute a claim. They asserted that plaintiffs’ declaratory relief claim failed to present a justiciable controversy, because the legal provisions that plaintiffs raised create no legal rights as between plaintiffs and the Vogts. With respect to the negligence and injunctive relief claims, the Vogts asserted that the complaint failed to allege any cognizable injury. Alternatively, the Vogts moved for summary judgment on each claim, asserting that there were no genuine issues of material fact as to whether there was a justiciable controversy between plaintiffs and the Vogts or whether the Vogts had injured plaintiffs.
The city moved to quash the writ of review and, alternatively, for summary judgment on that claim, and it moved to dismiss the other claims against it under ORCP 21 A(8). To assist the city’s litigation efforts, Bryan Colbourne, a senior planner, conducted a landslide hazard assessment under SRC chapter 69, the results of which he described in two affidavits. Applying the Graduated Response Table, he determined that the Vogts’ property scored zero points for earthquake-induced landslide susceptibility and three points for water-induced landslide susceptibility. Under step three of the table, under which points are assigned based on the activity in question, he addеd one point for construction of a single-family dwelling. Based on the total of four points, he concluded that the landslide hazard risk was low and that no additional geological assessment was required. Phillips, the building and safety administrator, also prepared affidavits in which he asserted that the city had “followed correct procedures” in issuing the permits to Stone.
With respect to the writ of review, the city argued that affidavits from Phillips and Colbourne established that they had properly construed the applicable laws and had correctly followed the proсedure set out in SRC chapter 69. As to the declaratory relief claim, the city argued that there is no justiciable controversy because none of plaintiffs’ rights were implicated by the city’s actions.
The trial court held a hearing on defendants’ various motions in February 2010. The court first addressed the negligence claim, ruling that plaintiffs had neither alleged any damages nor, for purposes of the Vogts’ alternative motion for summary judgment, adduced any evidence of damages. The court then opined that the city could assert another basis for dismissing the negligence claim against it — namely, that the writ of review was the only relief available to plaintiffs against the city. It noted that ORS 34.102 provides that the “decisions of the governing body of a municipal corporation acting in a judicial or quasi-judicial capacity and made in the transaction of municipal corporation business shall be reviewed only as provided in ORS 34.010 to 34.100 and not otherwise.” The court stated that it believed that the city’s decision was judicial or quasi-judicial. After a lengthy colloquy with counsel, the court ruled that the writ of review was plaintiffs’ only appropriate aсtion against the city, and it dismissed the remaining claims against the city. On the writ of review claim, the court concluded that the city’s decision was supported by evidence in the record, and it granted summary judgment for the city. Finally, the court addressed the remaining claims against the Vogts. With respect to the declaratory- and injunctive-relief claims, it concluded that plaintiffs’ allegations against the Vogts amounted to claims that the city should not have issued a building permit and had failed to follow its own rules in not requiring an excavation permit, which the court did not view as a controversy between plaintiffs and the Vogts. Accordingly, it dismissed those claims for failure to state a claim.
Before the hearing concluded, plaintiffs’ counsel informed the court that he had prepared a motion for summary judgment and served it on opposing counsel but had not yet filed it with the court. The court observed that its rulings would not be final until it signed a written order disposing of plaintiffs’
Two weeks later, before ruling on plaintiffs’ summary-judgment motion, the court entered a written order disposing of plaintiffs’ claims consistently with its oral rulings at the hearing on dеfendants’ motions. It entered a limited judgment of dismissal on March 19, 2010. In June 2010, the court entered an order and a limited judgment denying plaintiffs’ motion for summary judgment.
The Vogts sought an award of attorney fees. Both the Vogts and the city also sought enhanced prevailing-party fees. The court granted both parties’ motions on the ground that plaintiffs’ pursuit of a negligence claim without alleging damages was unreasonable. It entered a supplemental judgment awarding those fees in January 2011.
On appeal, plaintiffs make numerous assignments of error concerning both the trial court’s rulings on the merits of their claims and its awards of attorney fees and prevailing-party fees, which we address in turn. In their first assignment, plaintiffs contend that the trial court “erred in not granting plaintiff’s complaint for declaratory relief and Motion for Summary Judgment.” For the following reasons, we do not address the merits of that assignment of error. Because plaintiffs’ claims against the city and the Vogts were resolved at the pleading and summary-judgment stage of the case, the only procedural vehicle by which the court could have ruled in plaintiffs’ favor on their declaratory-relief claim was plaintiffs’ own motion for summary judgment. As noted, the court denied that motion in an order and a limited judgment entered in June 2010. The court’s ruling on that motion is not properly before us, because plaintiffs did not file a notice of appeal from the June 2010 limited judgment. Rather, plaintiffs filed notices of appeal only from the March 2010 limited judgment granting defendants’ dismissal and summary-judgment motions and from the January 2011 supplemental judgment awarding defendants fees and costs. Accordingly, our jurisdiction is limited to those matters, and we do not consider whether the trial court erred in denying plaintiffs’ motion for summary judgment. See ORS 19.270(7) (“If a limited or supplemental judgment is appealed, the jurisdiction of the appellate court is limited to the matters decided by the limited or supplemental judgment * * *.”).
In their second assignment of error, plaintiffs assert that the trial court erred in (1) granting the Vogts’ motion to dismiss based on lack of a justiciable controversy and (2) granting the Vogts’ motion for summary judgment. As noted above, the trial court granted the motion to dismiss after it concluded that plaintiffs’ declaratory-relief claim against the Vogts amounted to a claim that the city should not have issued a building permit and had failed to follow its own rulеs in not requiring an excavation permit, which the court concluded was not a controversy between plaintiffs and the Vogts. Plaintiffs do not address the court’s reasoning or offer any basis on which we could conclude that its reasoning was flawed. Nor do plaintiffs explain the basis for their challenge to the trial court’s ruling on the Vogts’ summary-judgment motion.
In their third assignment of error, plaintiffs contend that the trial court “erred in granting (1) defendant City’s Motion to Dismiss based upon lack of justiciable controversy and (2) Motion for Summary Judgment.” The first part of that argument attacks a ruling that the trial court did not make. The trial court did not dismiss any of the claims against the city on justiciability grounds. Rather, it dismissed everything other than the writ-of-review claim on the ground that the writ of review is plaintiffs’ exclusive remedy against the city. Because plaintiffs’ justiciability argument is not directed against any ruling on which the trial court based its decision in the city’s favor, we do not address it further.
We turn to the fourth assignment of error, in which plaintiffs challenge the trial court’s ruling that the writ of review is their exclusive remedy against the city. According to plaintiffs, the city’s actions involved no material discretion and were therefore purely ministerial, not quasi-judicial, and are thus not subject to a writ of review.
As plaintiffs’ argument suggests, a court has writ of rеview jurisdiction only over decisions reached “in the exercise of judicial or quasi-judicial functions ***.” ORS 34.040. Decisions that are purely ministerial — those that involve no discretion — are not judicial or quasi-judicial. Plaintiffs contend that SRC 69.060 and the Graduated Response Table set forth “a clearly ministerial five-step procedure for the City to follow in issuing permits.” They go on to assert that “the entire process is an application of criteria to facts in order to make a decision.”
The starting point for determining whether a decision is quasi-judicial is Strawberry Hill 4 Wheelers v. Benton Co. Bd. of Comm.,
This court, however, has acknowledged that the Strawberry Hill 4 Wheelers “formulation was never intended to serve as a complete, all-purpose list of ‘elements’ * * Babcock v. Sherwood School District 88J,
As we understand plaintiffs’ argument on appeal, it is that a proper application of SRC 65.050(a) and SCR 69.060 could lead to only one result, given the undisputed facts in this case: the city would have had to require the Vogts to obtain a grading or excavation
Toward the end of the argument following their fourth assignment of error, plaintiffs contend that, “[e]ven if the writ of review is the appropriate vehicle for review, the trial court erred in dismissing plaintiffs request.” We reject that argument without extended discussion, noting only that (1) the fourth assignment of error, by its terms, challenges only the trial court’s decision that a writ of review provides the only possible available remedy; it does not challenge any other ruling of the trial court, and (2) plaintiffs reargue certain aspects of their disagreement with the city’s analysis without providing quotations from (or even citations to) the record establishing that they raised all of those issues in the trial court, as ORAP 5.45(4)(a) requires; that is, plaintiffs have not established that they adequately preserved their claims for appeal. In an appeal like this, which involves a voluminous record and unusually complicated claims for relief, compliance with ORAP 5.45(4)(a) is particularly important. See ORAP 5.45(4)(c) (“The court may decline to consider any assignment of error that requires the court to search the record to find the error or to determine if the error properly was raised and preserved.”); Frakes v. Nay,
We turn briefly to plaintiffs’ challenges to the trial court’s award of attorney fees and prevailing-party fees. The court awarded those fees in a supplemental judgment that it entered after entering the limited judgment dismissing plaintiffs’ claims against the city and the Vogts. At that time, no general judgment had been entered.
Appeal from supplemental judgment dismissed; otherwise affirmed.
Notes
Defendant Stone did not move for dismissal or summary judgment on the claims against him, and he is not a party to this appeal.
As SRC 65.050(a) suggests, slope is defined by the ratio of run (horizontal) to rise (vertical) and can be expressed either as a ratio or a percentage. Thus, for example, a slope that is 45 degrees from horizontal is expressed as 1:1 or 100 percent, and a slope that is 22.5 degrees from horizontal is expressed as 2:1 or 50 percent. See also SRC 69.020(m) (“‘Slope’ is an inclined earth surface, the inclination of whiсh is expressed denoting a given rise in elevation over a given run in distance.”).
Plaintiffs contend that the original average slope was 40 percent and that city officials incorrectly determined the original slope to have been 20 percent. That dispute does not affect our analysis on appeal. Although plaintiffs have contended throughout this case that the city’s authorization of the retaining wall was based on its purportedly erroneous calculation of the slope, they have never explained how the original slope (or the miscаlculation of it) led to the city’s authorization of the retaining wall or to its alleged failure to properly conduct a landslide hazard analysis.
Indeed, plaintiffs do not identify where in the record the court’s rulings can be found. See ORAP 5.45(4)(a)(ii) (“Each assignment of error must set out pertinent quotations of the record where the question or issue was raised and the challenged ruling was made, together with reference to the pages of the transcript or other parts of the record quoted ***.” (Emphasis added.)).
When the trial court entered the limited judgment, plaintiffs’ claims against Stone had not yet been resolved. The record does not indicate whether those claims have since been resolved or whether a general judgment has now been entered.