12 Ga. App. 124 | Ga. Ct. App. | 1913
Plaintiff sued for the value of a horse killed by the Tunning of defendant’s locomotive and train. He was given a verdict, and the defendant’s motion for a new trial was overruled. The case is here on the general statutory grounds alone. There is no material conflict in the evidence, which, briefly stated, is as follows: Plaintiff was riding the horse in question in the town of Tunnel Hill. He came to. a public crossing and found it blocked ' by a freight-train. He started up the track, riding in a little path along the edge of the ties. At this point there were three tracks, the main line in the center and a -side-track on each side. He came to another crossing, a few hundred yards north of the first crossing, and found that this also was blocked by a freight-train; so he continued riding alongside the track in the little pathway described. About 200 feet before he reached the third crossing, which was open, and by which he intended’ to cross, he heard a passenger-train of the defendant coming behind him. It was running very fast, and the plaintiff just had time to jump down' off his horse and attempt to pull him down from the pathway on which he had been riding. At this point the embankment was ten or fifteen feet high and the little pathway was from four to five feet wide. The horse pulled back nearer the track, and the train struck him and killed him. The whistle was not blown,' nor the bell rung, and the plaintiff did not know the train was approaching, until it was right on him. The track is straight from the tunnel to where the horse was hit, and the only reason why the plaintiff did not hear the train was because the wind was blowing in his face and directly toward the oncoming train, and presumably the only reason he did not see the
We think, under this evidence, construed most favorably for the plaintiff, he was not entitled, under the law, to a recovery; for several reasons. First, he was guilty of the grossest sort of contributory negligence, in riding alongside the track in the switch-yards of the defendant. The fact that there was a pathway alongside the track gave him no implied permission to use it, it being in the switch-yard of the defendant. Southern Ry. Co. v. Mouchet, 3 Ga. App. 271 (59 S. E. 927); Grady v. Ga. R. Co., 112 Ga.,668 (37 S. E. 861). The fact that both crossings were blocked by freight-trains, which were on the side-tracks, was sufficient to put him on notice that some train was expected on the main line; and to ride in such proximity to the main track, with another train expected, was grossly negligent on his part, even if he had had a right otherwise to use the pathway for that purpose. And again, his effort to lead the horse down the steep embankment caused the horse to pull back and to get in the way of the oncoming-train; and this was the proximate cause of'the billing of the horse. It was the effort of the plaintiff to get his horse down the embankment and from a situation of danger in which his own negligence had placed it. And finally, even if- it be conceded that the defendant was guilty of negligence in running too fast and in failing to blow the whistle or ring thé bell, yet the fact that the -train was expected was not only indicated by the positions of the freight-trains on the