117 Misc. 480 | New York Court of Claims | 1921
This claim has been filed to recover from the state of New York compensation for lands and flowage rights permanently appropriated and destroyed by the state, pursuant to chapter 147, Laws of 1903, for the Champlain canal.
The lands and flowage rights appropriated and destroyed extend along both sides of the Hudson river above tidewater for a distance of approximately two and one-half miles, forming connected and uninterrupted stretches along both sides of the river, and between their northerly and southerly limits there is a substantial slope in the river bed.
The appropriated lands were originally parts of the lands granted by English Colonial Patents, viz., on the easterly or Rensselaer county side of the river, the patent from William and Mary to Tunison and Bradt, dated August 27, 1691, the patent from George II to David Abrahamson Schuyler and others, dated May 19, 1737, and the patent from George III to Isaac Sawyer and others, dated July 23, 1763, and, on the westerly or Saratoga county side of the river the Halfmoon Patent granted by the Duke of York to Philip Pieterson Schuyler and Goosen Garritson, dated October 13, 1665, a confirmatory patent between the same parties dated May 4,1668, and a second con
Claimant claims that these patents, construed, as it claims they must be, according to the principles of the English common law, conveyed to the several patentees title to the bed of the Hudson river in front of the uplands granted by the patents, on each side of the thread of the stream, and that claimant as the successor to the titles of the patentees is the owner of the bed as well as the banks of the river and adjacent uplands within the limits of the appropriation.
Chapter 164 of the Laws of 1901, which was passed by a two-thirds vote in each house of the legislature and took effect on March 22, 1901, provides as follows:
“ Waterford Electric Light, Heat and Power Company, its successors and assigns, are hereby authorized to construct a dam across the Hudson river on the lands now owned by it or which it shall hereafter purchase or acquire in the towns of Halfmoon, Sara-toga county, and Schaghticoke, Rensselaer county, in such a manner as not to injuriously affect the water privilege of the Hudson river power transmission company, and such company is hereby authorized to forever maintain said dam and to flood back up said river so far as it owns or shall hereafter purchase or acquire the adjacent uplands or may have or shall hereafter purchase or acquire the rights of flowage thereon for the purpose of maintaining the pond formed by such dam; and any interests of the state in lands under the waters of said river covered by said dam or which may be flooded by the erection thereof or under any works which said company shall construct on or adjacent to said dam is hereby granted to said company, its successors and assigns.”
A part of claimant’s lands and flowage rights had been acquired by claimant prior to the enactment of
It is claimed by claimant that the effect of the act of 1901 was to quitclaim to and vest in claimant all of the right, title and interest of the state, if it had any, to and in the lands under the waters of the river which might be covered by the waters impounded by its dam when erected, or at least to grant to claimant a franchise, which when accepted and acted upon was irrevocable without compensation, to construct and forever maintain a dam in the river.
Claimant, therefore, claims that it’s lands and flow-age rights on both sides of the river together with the lands under water which it claims to have owned as the successor of the original patentees thereof, or by quitclaim from the state, or both, constituted a very valuable potential water power site, worth at least $350,000, and that, if it be held that it did not own the lands under water, its uplands together with the franchise which it claims was granted by the act of 1901, constituted a property of no less value. •
By a series of appropriations duly made pursuant to the provisions of chapter 147, Laws of 1903, the. state has appropriated from claimant all of its uplands, and, from the owners of the fee thereof, the uplands over which claimant had acquired flowage, rights, and has constructed a stretch of the Champlain canal partly in the river adjacent to .claimant’s uplands and partly in and through uplands, flotation of sufficient depth at this location having been furnished by means of a dam in the river at substantially the place where claimant had contemplated locating
The state contends that the bed of the river was not granted by the patents under which claimant •claims title or by the act of 1901, that no franchise or water rights, in fact, nothing more than a revocable permit or license, was granted by the act of 1901, that whatever the nature of claimant’s rights in and to the bed of the river, or to the use of the waters of the river, they were subject and subservient to the state’s right to improve the navigation of the river, a right which the state claims it was exercising in 'building the Champlain canal, that claimant, having failed to obtain the consent of Congress to erect its dam, or the approval by the federal war department of its plans therefor, in accordance with the River and Harbor Act of March 3, 1899, was without sufficient lawful power, authority and right to proceed with its water power development, and that even though claimant owned the bed of the river, or an irrevocable franchise from the state by virtue of the act of 1901, and was not precluded from proceeding with its development by the fact of its failure to obtain the consent to and approval of its project by the federal authorities, yet its property and rights were of inconsiderable value as a water power property, and worth not more than $50,000.
The rule that a grant of land bounded by a non-tidal stream is presumed to convey to the thread of
None of the patents in question granted lands on both sides of the river, and, with respect to the description of their limits on the river side, none, in terms, specifically and unaided by the rule of the common law invoked by claimant, placed that boundary in the river bed. The language of each patent is, however, apt to fix the river boundary at the thread of the stream if the rule of the English common law, that grants which are bounded on river and streams above tide water are presumed to extend to the middle or thread of the stream, is applicable to it. That this is, and was at the time of these grants, a rule of the English common law is well understood, generally accepted, and needs the citation of no authorities. However, I think it is well settled that this rule was never applied to grants by colony or state of lands bordering the Hudson, which, like the Mohawk, has been considered an exception to the rule,
Counsel on both sides have been most diligent in obtaining and placing before the court a mass of evidence as to the navigability and navigation of the upper Hudson and as to the manner in which its bed has been regarded, as to ownership and control by colony, state and riparian owners from the earliest times. Time and space will not permit a detailed analysis here of such evidence. It is sufficient to state that such evidence establishes the fact that from the earliest times down to about the time when the. state undertook the work of canalizing the river, both colony and state have asserted, with the acquiescence of riparian owners, exclusive ownership, dominion and control of and over the bed of the upper Hudson.
Indeed the state’s ownership of the bed of the river is distinctly recognized in several deeds in claimant’s chain of title to parcels 2147, 4416 and 4417, in which “ "the line of ownership by the State of New York of, in and to the Hudson Eiver and its bed ” is mentioned in describing the easterly boundary of the lands conveyed by those deeds. Upon a state of facts and of history in no appreciable way differing from the facts and history with respect to the upper Hudson, it has been held that the Mohawk river was in its natural state a navigable river and that title to lands under its waters did not pass by patent grants of its banks (People ex rel. Loomis v. Canal Appraisers, 33 N. Y. 461; Danes v. State of New York, 219 id. 67), and that the Mohawk and Hudson were exceptions to
It follows, that at the time of the enactment of chapter 164, Laws of 1901, the title to the river bed at the location in question was in the state of New York. Nor was that ownership divested from the state and vested in claimant by the mere passage of the act' of 1901. It was not intended to have that effect as its plain terms indicate. It was contemplated that a dam should be erected and certain works constructed, whereupon, the title of the state to the lands under the waters of the river covered by the dam or flooded by its erection, or under any works constructed by claimant, should then pass into claimant’s ownership. The erection of a dam and the construction of works was indispensable to the determination of what and how much lands were to pass by the grant;
The act was, however, by its plain terms intended to grant a franchise to claimant to erect and maintain a dam and other works and thereby to acquire title to the lands under water covered by the dam or flooded by means of it, and, having been passed by a two-thirds vote, is sufficient for that purpose. First Construction Co. v. State of New York, 221 N. Y. 295, 316, 317. Such a franchise, having been accepted and acted upon, cannot be repealed, revoked, or destroyed by appropriation, without compensation. First Construction Co. v. State of New York, supra; People v. Hudson River Connecting R. R. Corp., 228 N. Y. 203. The franchise was to build and forever maintain a dam by
The franchise was of necessity as well as by its terms to be used in connection with the lands and flowage rights which claimant owned or might acquire, and was so related to said lands and flowage rights as to be attributes thereof entitled to be considered as an element of value in fixing the amount of compensation to which claimant is entitled because of the appropriation and destruction of its lands and floAvage rights.
It is contended that the act of 1901 is unconstitutional, in that, as it is urged, it is a private and local act and embraces more than one subject, whereas only one subject is expressed in its title, therefore,' offending against section 16 of article III of the State Constitution.
The point is not well taken. While of course the act is a private act it embraces but one subject. The grant of lands covered by the waters to be flooded back by the dam was incidental to the subject of the construction of the dam. Matter of Long Sault Development Co. v. Kennedy, 158 App. Div. 398. No provision of the act was so foreign to its main purpose and subject as to mislead and deceive or tend to mislead and deceive the members of the legislature or the public. Economic Power & Construction Co. v. City of Buffalo, 195 N. Y. 298; People ex rel. Olin v. Hennessy, 206 id. 33.
Even though it be held that the act embraces two independent subjects, one of which is not expressed in
It is further urged by the state that whatever claimant’s rights in or to the river bed or the use of the waters of the river might have been, the same were held subject and subservient to the state’s right to improve the navigation of the river without compensating claimant for consequential damages resulting from the work of the improvement. This proposition, if conceded, will not defeat claimant’s right to compensation for the value of its property taken by the state in the exercise of its right of eminent domain pursuant to the provisions of a statute which expressly provides that compensation shall be made for property so taken. Laws of 1903, chap. 147, § 4; Lehigh Valley R. R. Co. v. Canal Board, 204 N. Y. 471; Oswego & Syracuse R. R. Co. v. State of New York, 226 id. 351.
I find no difficulty in agreeing with the contention of the state that the work in which the state was engaged, in connection with which the several appropriations were made, was in a broad sense an improvement of the navigation of the river, none the less so because at points it was deemed advisable to cut into a portion of the river bank and construct a lock and a part of the canal channel partly or wholly shoreward of the highwater line. But in the carrying on of its project for the improvement of the navigation of the river, it was necessary, in addition, to erect a dam, the necessary effect of which was to permanently flood lands in the ownership of claimant, and to divert the waters of the river outside of the natural bed of the river, which it could not do without compensation
It is also urged by the state that claimant’s franchise was not complete for the reason that it had not obtained consent of congress for the erection of its dam, or the approval by federal authority of its plans pursuant to the provisions of certain federal statutes. River & Harbor Act of March 3, 1899, chap. 425; General Dam Act of June 21, 1906, as amd. by act of June 23, 1910, chap. 360.
The acts referred to relate to “ navigable waters of the United States ” and the construction therein of obstructions to navigation, dams included, and forbid the commencement of such construction without first obtaining the prescribed consent and approval of
. . It is claimed by claimant;that the stretch of the river along.¡which its lands and flowage rights lay was not “ navigable waters of, the TJnited. States ” within the meaning of. the federal statutes cited,, for the reason that in that stretch of the river no, navigation had been actually carried on for many years prior to the passage of the federal statutes, arid that navigation over this stretch as a link in a, continuous highway over which commerce might be carried on • with other states or foreign countries in the customary modes in which such commerce is. conducted by water had been rendered impossible by reason- of the erection of several . dams -above and one below the- location of elaimant.’s,lands. The Daniel Ball, 10 Wall. 557; The Montello, 11 id. 411.
• 'Claimant .further urges that the federal- statutes were not intended to. apply to this stretch of the river for the-¡reason that the presence of reefs and rapids and the' shallowness- of the .water in that stretch rendered it unsuitable and unfit for-the uses- of. navigation asii-navigation was. usually carried on. at the time of the passage of the.federal statutes,, and that the construction of a dam in that stretch would constitute np obstruction to navigation and hence that this stretch was ■ in; no practical sense navigable waters of the Uiidted-'-.Statés...
This contention of. claimant I think must fail. In legal character the Hudson riyer, as well above as below- claimant’s property, . is a navigable river (Palmer v. Mulligan, 3 Caines, 307; Harris v. Thompson, 9 Barb. 350; West Virginia Pulp & Paper Co. v. Peck, 189 App. Div. 286), and.there is no change.in the legal character of a stretch in which, there may be
However, the acts of congress do not limit the nature or extent of claimant’s property rights, but prescribe conditions under which only they may be exercised. Such conditions' must of course be complied with before a dam may lawfully be constructed, and the fact that the conditions had not been complied with prior-to the appropriations is a fact to be taken into consideration in fixing the value of claimant’s lands' and flowage rights appropriated and destroyed. It is true that, because of dams in the ' river constructed by virtue of legislative authority, navigation in any practical way could not be carried on in the stretch of the river upon which claimant’s lands fronted, and that for many years because of the dams and because of the construction and use of the Champlain canal no navigation there had been carried on, in addition to which the legislature had expressly authorized the construction of a dam at this location, yet the provisions of these federal statutes appreciably affected the market value of claimant’s lands and rights. While in
We have considered these facts and conditions in fixing the value of claimant’s lands and rights appropriated by the state and have reached the conclusion that the fair and reasonable value of such lands and rights at the time of the appropriation was $250,000.
The lands and flowage rights owned by claimant and appropriated by the state, together with the franchise granted to claimant by chapter 164, Laws of 1901, constituted' one entire property whose most beneficial and valuable use was its employment as a whole for the development of water power. This entire property has been appropriated by the state by a series of appropriations, twenty-two in number, the first on March 17,1910, and the last on June 30,1913. It is not practicable to assign to each of the appropriated parcels a numerical proportion of the value of the entire property, for its value depended upon its use as an entirety. And while twenty-two several appropriations have been made by the state, their practical effect, so far as they affect value, is as of one single appropriation consummated on June 30,1913, the date of the last appropriation. It does not appear that possession of any parcel was actually taken by the state prior to June 30, 1913, and only three appropriations were made prior to June 25,1913. In the circum
Claimant is entitled to judgment herein in the amount of $250,000, with interest thereon from June 30, 1913.
Ackerson, P. J., concurs.
Award accordingly.