Opinion for the Court filed by Circuit Judge TATEL.
These consolidated petitions seek review of the Federal Energy Regulatory Commission’s approval of a settlement resolving a rate case filed by a natural gas pipeline serving parts of Oregon, Washington, and California. Finding petitioners’ various challenges without merit, we deny the petitions.
I
Intervenor PG&E Gas Transmission-Northwest Corporation (“the pipeline”) has owned a natural gas pipeline running from near British Columbia down through Oregon since the 1960s. For many years, its parent company, Pacific Gas & Electric (“PG&E”), was the main shipper on the line. In 1980, and again in 1991, FERC granted certificates to expand the pipeline’s capacity. The 1991 expansion, which increased the pipeline’s mainline capacity by approximately 75 percent, went into service in 1993.
Historically, the pipeline used a rate system in which shippers who entered into contracts for capacity after expansion (“expansion shippers”) bore the entire cost of the expansion; shippers who held capacity on the pipeline prior to expansion (“original shippers”) paid only for the costs associated with the original pipeline, including any unrecovered costs of building the orig
*500
inal pipeline, depreciation, and associated tariffs. According to FERC, this so-called “incremental” or “vintaged” rate structure is justified because it allows original shippers to “fully benefit from their earlier long-term agreements with the pipeline .... [Sjhippers pay[ ] higher rates in the early years which are offset by lower rates in the later years.”
Great Lakes Transmission Ltd. Partnership,
Not surprisingly, the expansion shippers preferred a different rate structure: a “rolled-in” rate system in which the costs of the expansion and any unrecovered costs associated with the original pipeline are rolled together and divided equally so that all shippers pay the same rate regardless of when they obtain their capacity. In late 1992 and early 1993, when the pipeline filed its tariff sheets addressing other rate issues, some of the expansion shippers filed comments arguing that the pipeline should adopt a rolled-in rate structure. FERC, agreeing with the pipeline that the incremental rate structure should be temporarily maintained, deferred resolution of the issue raised by the expansion shippers until the pipeline’s next general rate filing. Less than fourteen months later, the pipeline submitted a rate filing pursuant to section 4 of the Natural Gas Act, 15 U.S.C. § 717c, in which it proposed the rolled-in rate structure the expansion shippers had requested. When PG&E, the primary original shipper, and its customer, Interve-nor the California Public Utilities Commission (“CPUC”), opposed the proposed rolled-in rate structure, the issue was set for litigation before FERC.
As the “rolled-in” versus “incremental” rate debate raged, PG&E permanently transferred or “released” part of its excess capacity to other shippers pursuant to 18 C.F.R. § 284.243. Section 284.243 provides the mechanism by which a shipper that has contracted for capacity it no longer needs (the “releasing shipper”) can reallocate that capacity to another shipper (the “replacement shipper”): “The pipeline must allocate released capacity to the person offering the highest rate (not over the maximum rate) and offering to meet any other terms and conditions of the release.” 18 C.F.R. § 284.243(e). Although “maximum rate” is not defined in the text of the regulation, Order No. 636, the preamble to section 284.243, explains that “[t]he regulations require the pipeline to allocate released capacity to the person offering the highest rate
not over the maximum tariff rate the pipeline can charge to the releasing shipper.” Pipeline Sewice Obligations and Revisions to Regulations Governing Self-Implementing Transportation Under Part 281 of the Commission’s Regulations, and Regulation of Natural Gas Pipelines After Partial Wellhead Decontrol,
57 Fed.Reg. 13267, 13285 (1992) (emphasis added). Under the capacity release regulation, replacement shippers in this case obtained capacity at the rate that PG&E had been paying. As a result, replacement shippers on the incrementally priced pipeline paid significantly lower rates than expansion shippers even though those replacement shippers had obtained their capacity at a later date. This result conformed to FERC’s then-existing policy as set forth in
Great Lakes Transmission Ltd. Partnership,
In 1996, the parties to the still-pending rate proceeding reached a settlement agreement under which the pipeline would phase in a rolled-in rate system. During the first (and uncontested) phase lasting until November 1, 1996, the existing incremental rate structure was maintained. During the second period, running from *501 the later of November 1, 1996 or the date the Commission approves the settlement until the pipeline’s next rate filing, expansion costs are rolled in so that all shippers end up paying the same base rate — 26.28 cents per Decatherm (“cents/Dth”). Because that base rate represents a steep increase for PG&E and other original shippers who had not previously been paying for the pipeline’s expansion, the settlement provides for mitigation during the interim period: until November 1, 2002, PG&E pays only 75 percent of the base rate, or 19.91 cents/Dth. The settlement also provides for mitigation of replacement shippers’ rates, although less so: they pay approximately 92 percent of the base rate, or 24.28 cents/Dth. Expansion shippers pay the base rate plus a 6.5 cent surcharge to offset the rate mitigation provided to PG&E and replacement shippers, or a total of 32.74 cents/Dth. The settlement gives PG&E several other benefits, including rebates on certain surcharges that it had paid and an entitlement to obtain refunds when it permanently or temporarily releases capacity.
Most of the parties, including PG&E, CPUC and most expansion shippers, either supported the settlement or did not oppose it. Over the objections of several replacement shippers and petitioner Washington Water Power, FERC approved the settlement.
Pacific Gas Transmission Co.,
II
Several replacement shippers — petitioners Sierra Pacific Power Co., Sierra Pacific Resources, and Engage Energy US, L.P. (“replacement shipper petitioners”) — argue that FERC’s new policy is inconsistent with its price cap regulation, 18 C.F.R. § 284.243, as interpreted in Order No. 636. They also argue that application of the new policy to them is impermissibly retroactive and contrary to FERC precedent. FERC argues that replacement shipper petitioners cannot challenge the reasoning in the order denying rehearing because they failed to seek further rehearing of that order. FERC ignores our holding in
Southern Natural Gas Co. v. FERC,
On the merits, these petitioners fare less well. They challenge neither the logic behind FERC’s ruling that they are similarly situated to expansion shippers— the prior policy was unfair to expansion shippers — nor the Commission’s authority to overrule Great Lakes I. Instead, they complain that insofar as the new policy may require replacement shippers to pay more than releasing shippers, that policy *502 conflicts with Order No. 636, the preamble to section 284.243 of the Commission’s regulations.
Replacement shipper petitioners read Order No. 636, which states that “the pipeline [must] allocate released capacity to the person offering the highest rate
not over the maximum tariff rate the 'pipeline can charge to the releasing
shipperto require that they pay the same rate as PG&E. 57 Fed.Reg. at 13285 (emphasis added). According to the Commission, a subsequent order, Order No. 636-A, made clear that the sentence from Order No. 636 on which petitioners rely does not apply to incrementally priced systems. Because FERC’s position represents an interpretation of its own regulations, we give it “controlling weight unless it is plainly erroneous or inconsistent with the regulation.”
Exxon Corp. v. FERC,
The Commission’s position rests on the following sequence of events. After FERC issued Order No. 636, several petitions for rehearing “raise[d] questions about the maximum rate for released capacity.” Order No. 636-A, 57 Fed.Reg. 36,128, 36,149 (1992). Those petitions observed that shippers holding expansion capacity on a pipeline with an incremental rate system would have a difficult time releasing that capacity because the maximum rate for capacity released by shippers on pipelines with rolled-in rates would be significantly lower. Id. at 36,150. Petitioners suggested several ways to address this problem, including giving priority to incremental releases or establishing a floor for prices at the incremental rate.
Responding to these comments in Order No. 636-A, FERC refused to “make a generic determination on the various methodologies proposed [in the comments] since resolution of such issues may depend on the characteristics of the pipeline and the services it offers. The parties in restructuring proceedings involving incremental rates should consider and propose methodologies to ensure that the capacity release mechanism operates efficiently and that all parties are treated fairly and equitably, without undue discrimination.”
Id.
at 36,150. Order No. 636-A thus “left open the issue of how to price capacity releases in the context of a system with incremental rates.”
PG&E Gas Transmission, Northwest Corp.,
Equally without merit is replacement shipper petitioners’ argument that by adopting the new policy, the Commission impermissibly departed from prior cases in which it refused to remove or raise the section 284.243 rate cap in individual proceedings.
See, e.g., Tennessee Gas Pipeline Co.,
Petitioners’ remaining arguments with respect to the new policy relate to
*503
whether the Commission could apply it to their existing contracts. Having entered into contracts for released capacity prior to the settlement of this case, replacement shipper petitioners argue that applying the new policy to them now is impermissibly retroactive. Because petitioners have failed to establish that they relied on the Commission’s prior policy to their detriment — in other words, that they would not have entered into these contracts had they known that the Commission would change its policy — they cannot prevail on this argument.
See Public Service Co. of Colorado v. FERC,
Replacement shipper petitioners fare no better with their argument that by applying the new policy to them, FERC departed from
Great Lakes Transmission Ltd. Partnership,
Replacement shipper petitioners next argue that even if replacement shippers as a general rule are similarly situated to expansion shippers, they are not so similarly situated in the circumstances of this case. This is because they contend, as replacement shippers they paid millions of dollars in tariffs when the incremental rate system was in place — tariffs for which expansion shippers were not responsible. As intervenors point out, however, the rate paid by these replacement shippers under the incremental rate system, even including the additional tariffs, was still significantly lower than the rate paid by expansion shippers. Since replacement shippers *504 are similarly situated to expansion shippers for purposes of determining rates and since it is undisputed that they paid less than expansion shippers for the period in question, petitioners have no cause to complain now about the tariffs.
Replacement shipper petitioners also contend that the settlement is unduly discriminatory because PG&E enjoys a greater degree of mitigation and a number of other “special benefits.” In order to prevail on an undue discrimination claim, petitioners must demonstrate not only differential rates between two classes of customers but also “that the two classes of customers are similarly situated for purposes of the rate.”
“Complex” Consolidated Edison Co. of New York v. FERC,
Finally, replacement shipper petitioners challenge a provision of the settlement agreement under which the pipeline will refund a certain percentage of the tariffs paid by PG&E in exchange for an agreement by CPUC, PG&E’s primary customer, to withdraw two appeals it had filed in this court challenging the Commission’s determination that the pipeline could recover certain transition costs. Petitioners maintain first that this provision is unfair because PG&E paid only a portion of the tariffs but receives all of the refund, and second that the Commission ignored
Southern California Edison Co.,
49 FPC 717, 721 (1973), a decision of the Commission’s predecessor refusing to approve a settlement that included a provision settling an ancillary appeal pending before this court. As the Commission pointed out in denying rehearing in this case, however, giving PG&E the benefit of the refund is consistent with its policy of facilitating settlements to resolve the difficult issues raised by transition cost disputes.
See
Ill
The remaining two petitions require only brief discussion. Claiming that a new volume-based charge included in the settlement will increase its rate by 16 percent and that FERC has a general policy of requiring mitigation where a shipper’s rate increases by more than 10 percent, petitioner Washington Water Power Co. maintains that FERC should not have approved the settlement without requiring additional mitigation. FERC responds that it has no such “general” rate shock policy. Denying rehearing, FERC explained that its rate shock policy applies only when the rate shock results either from a straight fixed-variable rate design or from a transition from incremental to rolled-in rates.
Petitioners DEK Energy Corp. and Apache Corp. (collectively “DEK”), expansion shippers who failed timely to file their comments on the settlement, now contest the settlement’s mitigation provisions. DEK participated neither in the litigation of the pipeline’s section 4 rate filing nor in the settlement negotiations. After submission of the settlement, DEK filed comments stating that it had no opposition to the rolled-in rate structure. It registered no opposition to the settlement’s mitigation provisions. Then, over
*505
two months after the final deadline for filing comments on the settlement, DEK filed a “clarification,” asserting for the first time that the mitigation provided to PG&E and the replacement shippers under the settlement was unjust and unfair. Several parties opposed DEK’s “clarification” on timeliness grounds, and the Commission said nothing about DEK’s comments in its September 1996 order approving the settlement. Denying DEK’s petition for rehearing, the Commission found that DEK’s comments were untimely.
[aiddressing DEK’s opposition now, in light of extended settlement conferences and resolution of the case in a manner acceptable to all others similarly situated to DEK, would unfairly disrupt and detract from the compromises of parties that did participate. This is especially true considering that DEK’s initial comments were silent on the issues raised in its “clarification” and request for rehearing. Consideration of the late opposition would be similar to allowing an eleventh hour intervention by a person that had chosen not to comment at all, and would lend uncertainty to the settlement negotiation process which thrives, in part, on the timely filing of positions.
IV
The petitions for review are denied.
So ordered.
