226 F. 169 | 4th Cir. | 1915
On the first trial of this cause the District Court sustained plaintiff’s demurrer to the evidence, and judgment was entered accordingly. This court reversed the judgment and remanded the cause for a new trial, on the ground that material evidence offered by the defendant had been excluded. On the second trial the District Judge directed a verdict in favor of the plaintiff for the amount claimed. For,‘convenience we repeat the short statement made when the case was here before.
The Bridge Company, having undertaken to construct a bridge across the Potomac river near Williamsport, Md., contracted with the Steel Company to> furnish and put in position the steel girder spans. Under a contract similar in terms Elmore & Hamilton Contracting Company undertook to furnish the material and construct the concrete piers or abutments. Mason D. Pratt, as engineer, agreed with the Bridge Company to supervise, inspect, and take charge of the construction of the bridge as its representative. On December 16, 1908, pier No. 10 fell while the workmen of the Steel Company were placing on it the steel superstructure, killing some of its men and injuring others. Frank L. Benning, one of the workmen who was seriously injured, sued the Steel Company in the circuit court for Washington county, Md., claiming damages for his injuries, on the allegation of negligence that the Steel Company knew or by the exercise of reasonable care could have known that the pier was “green, weak, defective, and of insufficient strength to carry the weight for which it was intended.” The Steel Company gave the Bridge Company written notice of the pendency of the suit and of its intention to hold the Bridge Company responsible for any recovery in favor of Benning. Benning recovered judgment for $13,500 against the Steel Company.
After paying the judgment the Steel Company brought this action, alleging that it was the duty of, the Bridge Company to see that the piers were safe for jhe placing of the steel superstructure that the work was done under the direction of its engineer; that the defendant knew, or by the exercise -of reasonable care and caution could have known, that the pier was green, defective, and of insufficient strength to carry the weight; and that nevertheless the defendant authorized and directed the employes of the Steel Company to proceed with the work of placing the steel superstructure on pier 10. On this allegation of negligence the plaintiff asked for judgment ag-ainst the defendant for the amount of the judgment in favor of Benning, together with interest and costs.
By the former judgment of this court these points were settled;
Second. The judgment in favor of Benning was not conclusive as to matters not necessary to Benning’s recovery.
Third. Since the Steel Company could not escape liability to Ben-ning for failure to perform its nondelegable duty of furnishing him a reasonably safe place to work, by showing that it had relied on the" Bridge Company to furnish a safe pier, it follows that the judgment in favor of Benning against the Steel Company did not settle the issue of negligence between the Steel Company and the Bridge Company.
Fourth. The Bridge Company was bound by its contract to use due care to furnish the Steel Company with a pier strong enough to bear the steel superstructure; and since the engineer was the agent of the Bridge Company, it was bound by his representations to the Steel Company as to the safety of the pier as fully as if they had been made by the company itself.
The questions open at the second trial between the Steel Company and the Bridge Company were: Did the Bridge Company, through its engineer, negligently represent to the Steel Company that the pier was safe so as to fix upon itself negligence as the proximate cause of the accident? Was the Steel Company .guilty of contributory .-negligence either in disregarding the warning afforded by the appearance of the pier itself or the opinion of the assistant engineer that it would not be safe, .or in using a battering ram to force the girder to its proper place on a cement pier not fully dry?
In view of this last statement, we are inclined to think the warning of Darby, standing alone, would not be evidence to charge Bickle with negligence in acting upon Pratt’s opinion or direction. But it is to be considered further that Bickle knew that Pratt had not seen the pier after the forms were off, that the pier looked dark, indicating that it was not dry, and that Bickle was not confident of the pier and undertook to test it himself with an iron bar. More important than these circumstances was the testimony of a number o£ witnesses that the day before the accident the Steel Company used1 a battering fam to force, the girder in place. The plaintiff contends that from the evidence as to the method of placing the girders it is clear that it was not only unnecessary, but impossible, to use a battering ram. But as to this position it is enough to say that there would be as little justification in directing a verdict for the plaintiff on the rejection of this evidence as to the use of. a battering ram as it would be for the court to reject or leave out of consideration defendant’s evidence to the effect that the method of construction made the use of a battering ram impossible.
While the point is not free from difficulty, taking the testimony on behalf of the defendant as true, we think it should have been left to the jury to decide whether Bickle was negligent in. going on the pier relying o*n Pratt’s statement or opinion, after he had received a later and contrary opinion from the assistant engineer, after he had observed1 that the pier was not dry, and after he had úsed a battering ram. On review of the whole testimony, we think there was such evidence of contributory negligence' on the part of the plaintiff as to require that issue to be submitted to the jury. It was therefore error to direct a verdict for the plaintiff.
“Tills testimony is excluded, because the court is of opinion, that tbe matter inquired of is not a matter for expert testimony, but is to be proven by tbe facts and conditions as they existed, of wbicb the jury is to be the judge, and, further, because of the contention of counsel that it does not fully state the facts that existed in the case and state some that do not exist.”
Reversed.