144 N.Y.S. 514 | N.Y. App. Div. | 1913
The plaintiff, a longshoreman, employed by the defendant company, was injured while discharging cases or bags of rubber from the lower hold of the steamship Hubert, then lying in Brooklyn. He was one of the gang working at No. 3 hatch. The cases of rubber weighed from 400 to 500 pounds. Three of them were slung together in a draft. The longshoremen worked in pairs in making up the slingloads. A chain sling is first laid down, the three packages rolled on it, then the ends of the sling are taken up and drawn closely, so as to tie together the draft, when the load is hooked on to the hoisting fall to be raised on signal to the gangwayman on the top deck, who in turn signals a hoisting order to the winchman.
Plaintiff with his partner, J. McLaughlin, had made up this slingload in the inshore wing. After the sling had been hooked on, the winch had started so as to end-up the load but not to move it appreciably towards the hatch when the hoisting stopped. The winchman got word to let it go back, and as
Plaintiff recovered below on the ■ ground that the defendant had intrusted Lofstrom, the gangwayman, “ with authority to direct, control or command ” another “ employee in the performance of the duty of such employee ” (Labor Law [Consol. Laws, chap. 31; Laws of 1909, chap. 36], § 200, as amd. by Laws of 1910, chap. 352), and that Lofstrom had been negligent in signaling the winchman from a position on the inshore side of the deck where he could not see the draft beneath him leading from the inshore wing of the hold. There was evidence that when cargo was being hoisted from the inshore wing a gangwayman on the offshore side of the top deck had a better view below and that in such circumstances the opposite, offshore, side of the hatch was his proper station.
It, however, does not appear that the signals repeated by Lofstrom or any failure by him to signal proximately caused this accident. The slinging was in the ship’s wings six or eight feet inside the hatch coamings, far away from the drop of the fall. Plaintiff first said that the men who made up the sling had nothing to do with giving the hoisting signal, which is by the man who hooks on the sling. When he hooks he has to see that the load is properly slung. The ending-up of this sling-load and the falling apart of the packages point to a slingload not tightly made up or not securely hooked to the fall, rather than to any fault on the deck above.
Who hooked on this load ? Plaintiff first said that it was Hardy, whose place was on the top of the tunnel. Afterward he testified that if the man on the tunnel (which ran about eight feet high) could not get down to hook on the sling, one of the men who made it up hooked it on, and finally admitted that this particular sling was so hooked on by his partner, J. McLaughlin. But McLaughlin, plaintiff’s partner, and Hardy, on the tunnel, were not called, nor was their absence accounted for. Patrick McLaughlin, the other witness from the lower hold, was on the opposite side of the tunnel, out in the offshore wing, and had nothing to do with the slingload and could not see what happened to it till after the accident.
If the load had not swung clear, but had only ended-up, the
The evidence, therefore, does not show that the stoppage of the hoisting, or the failure, if any, sooner to give orders to the winchman, proximately brought about this accident.
I advise that the judgment and order be reversed, and a new trial granted, costs to abide the event.
Jenks, P. J., Carr and Stapleton, JJ., concurred; Rich, J., dissented.
Judgment and order reversed and new trial granted, costs to abide the event.