94 Pa. Super. 199 | Pa. Super. Ct. | 1928
Argued April 10, 1928. The action below was trespass for injuries to real estate. A non-suit was entered as to two of the plaintiffs, Frank and Magdalena Wally, and a verdict rendered in favor of their co-plaintiffs, Anthony and Rose Wally. The verdict in their favor, supported as it is by evidence, established the fact of injury. The only substantial question involved under the assignments of error filed by the defendant in support of his appeal from the judgment entered upon the verdict, after his motions for a new trial and for judgment n.o.v. had been denied, is whether the court below in admitting certain offers of evidence and in its charge to the jury adopted a correct measure of damages. From the evidence these material facts appeared: in 1916 plaintiffs purchased a lot at the southwest corner of State and 24th Streets in the City of Erie, fronting 40 feet on State Street and extending westwardly along the south side of 24th Street 165 feet, with a width in the rear of 51.85 feet. Across the rear end of this lot they built a bungalow in 1917 at a cost of about $7,000, the western side of the building, approximately 50 feet in length, being eight feet from the rear line of the lot.
In 1922 George D. Baldwin, the defendant, became *201 the owner of a lot on the east side of Peach Street (a north and south street parallel with State Street and 330 feet west thereof), located 30 feet south of 24th Street, with a frontage of 69.7 feet, and extending eastwardly, of equal width, 165 feet, the resulting situation being that these lots abut upon each other for a distance of 21.85 feet in the rear of each lot. Peach Street is laid out along the top of a bluff and its elevation is 41 feet above that of State Street. Passing from the front of defendant's lot eastwardly toward State Street, the surface is approximately level for about two-thirds of its length and then comes a steep descent, at a grade of about 50 per cent., to and across the dividing line between the northern portion of defendant's lot and the southern 21.85 feet of plaintiffs'.
In 1922 defendant began the erection of several small apartment houses on the front portion of his lot and in excavating for their cellars a part of the excavated material was piled along the top of the bank in the rear of the new buildings, thereby extending the level portion of defendant's property eastwardly and making the descent to plaintiffs' property more precipitous. Prior to these building operations by defendant the slope toward plaintiffs' property had been covered with vegetation and small trees and bushes. The testimony for plaintiffs indicates that during the five years intervening between the building of their house and the depositing of the excavated materials by defendant they had suffered no inconvenience from water flowing, or debris of any kind falling, down the slope, but that shortly thereafter the dirt, loose stones and other debris deposited by defendant at the top of and along the descent began to fall and wash down upon plaintiffs' property. The nature and extent of the injury was thus described by the plaintiffs: "Q. When would the dirt come down? At what time particularly on to your land and house?...... A. After *202 a frost or heavy rain a lot of dirt would come down and run into the cellar windows, and we would have to always shovel it back. Q. What inconvenience, if any, did that cause in your cellar? A. Flooded the cellar, rolled the dirt in, and plugged up the sewer a couple of times. Q. What if any damage did stones do? A. One of them went right through the cellar window when it came down the hill. Q. Inside of the cellar? A. Yes. Q. What if anything did it do to your walk? A. When that big one came down it landed on the walk and cracked it. Q. What if any change did you notice in the dampness or water in your cellar after Baldwin made this excavation there? A. After the water run in we had to clean up down there. Q. What if any change in the dampness of the cellar was there? Where did the water come from? Through the walls? A. And through the cracks in the cellar window." Plaintiffs testified that from seventy-five to one hundred stones came down, some of them weighing many pounds, and that several windows in bedrooms were broken. After the institution of the suit defendant constructed upon his side of the dividing line a retaining wall of gravel, mixed with some cement, but there is evidence on behalf of plaintiffs that this wall is constructed in a faulty manner and is insufficient to protect their property. At the trial it was correctly ruled that plaintiffs could not recover for any damages suffered subsequent to March 26, 1923, the date of bringing suit. The controversy is over the proper measure of plaintiffs' damages for the injuries sustained up to that time. Plaintiffs offered no evidence with respect to the cost of removing the debris deposited upon their property, reopening their sewer, replacing broken windows or repairing the injuries caused by the flooding of their cellar. It appeared indefinitely in the testimony that plaintiffs rented the upper story of their house and that the conditions complained of *203 made it more difficult to obtain tenants. Defendant's position was that the measure of damages was the cost of restoring the property to its former condition and as this cost had not been shown there could be no recovery. Over the objection of counsel for defendant, plaintiffs were permitted by the learned trial judge to show by several witnesses, experienced in cement work, that a practical way of protecting plaintiffs' property from further injury would be the construction of a cement wall, twenty-two feet long and eight feet high, along the dividing line between the respective lots, and that the cost of such a wall would be from $465 to $490. Plaintiffs' contention was that the verdict "should be in such amount as will compensate them for the cost of erecting a retaining wall."
After charging the jury with respect to the other issues arising under the testimony, the learned trial judge in giving the jury the measure of plaintiffs' damages, if they found in their favor, said: "In a case of this kind, where a plaintiff can recover, the measure of the damage is the cost of restoring the property injured to its former condition. If the Wallys have been damaged, what is the cost of restoring the Wally property to its condition before this fill in the back of the Baldwin lot, if, in fact, that lot was filled? The question in this case is not what it would cost to put up a concrete wall. The evidence as to the cost of a concrete wall we understand merely to be some evidence of the amount of that damage. You have three witnesses who tell you that a concrete wall will prevent further injury to the property and in fact will restore the Wally property to its condition prior to this alleged act of Baldwin's, and on that question you have the testimony of three witnesses who tell you that an adequate wall in this situation would cost from $465.00 to $490.00. As I say, we are not attempting to determine on any view of the case the cost of a retaining wall, and that evidence is only before you, *204 as we understand the law, as being some evidence of the measure of damages as to how much the plaintiffs have been damaged, if you accept their theory of the case." The verdict shows conclusively that the jury understood these instructions (whether so intended by the trial judge or not) to mean that it could adopt the cost of building the kind and size of wall suggested by plaintiffs' witnesses as the measure of their damages for the injuries they had suffered up to the date of bringing suit. It reads: "October 13, 1927. The jury say they find judgment for the plaintiff the amount of the price of a retainance wall not less than 6 ft. high above the ground and length of his property 21 85/100 ft. The jury say they find for the plaintiff $475.00."
Upon a review of this record a majority of the members of this court are of opinion that the jury was permitted to adopt an erroneous measure of damages. It is clear, under the testimony, that the injuries to plaintiffs' real estate are not permanent; that the cost of remedying them is much less than the value of the property injured; and that this is a case of consequential injuries resulting from something done off the plaintiffs' land which may or may not be continued. If the defendant corrects the conditions causing the injuries — which he can do without trespassing upon the plaintiffs' land — they will cease, but in the meantime plaintiffs may maintain successive actions for such injuries as may be done to their property. In its controlling features this case is comparable to the case of Hoffman v. Mill Creek Coal Company,
The verdict having established that plaintiffs have been injured, but it also appearing from the record that the case was tried and submitted to the jury upon an erroneous measure of their damages, a new trial should be awarded.
The judgment is reversed with a venire.