Defendants-Appellants City of Jackson, Mississippi, et al., appeal the district court’s grant of summary judgment to Plaintiff-Appellee W.H. Scott Construction Company, Inc., in Plaintiff-Appellee’s equal protection challenge to a policy encouraging minority participation in city construction contracts. We affirm.
I.
In 1985, the City of Jackson (the “City”) adopted a Minority Business Enterprise Program (“MBE Program” or the “Program”). The Program, designed to remedy the effects of past discrimination, established a “goals” program for the utilization of minority-owned businesses (“MBEs”), as well as those owned by women CWBEs”), in City contracts. 1 The Program was managed by the City’s Office of Business Development (“OBD”). Initially, the minority-participation goal was 5% of all City contracts, relative to the overall City budget, including contracts for goods, services, and construction. Later the goal was increased to 15%. The Program’s Li *209 aison Officer within thе OBD was charged with, among other duties, “[e]oordinat[ing] procurement activities with each City department head to ensure that the maximum amount of dollars and contracts are afforded to minority firms.”
Prior to implementing the Program and the original 5% goal, the City established an advisory committee of local businesses and conducted a series of hearings to document discrimination against minority business owners. The 5% goal, however, was not based on any objective data. According to Willie Cole, manager of the OBD, it was a “guess” that was adopted because the City “felt like there was at least enough minority business out there to do five percent of business to the City of Jackson.” The goal was later increased to 15% because it was found that 10% of businesses in Mississippi were minority-owned. The 15% goal applied to all areas of procurement.
After the Program’s adoption, the City’s Department of Public Works (the “Department”) began submitting reports of its contracting activities to the OBD. In 1988, the Department established its own policy for the use of the City’s goals. The Department began including a “Special Notice to Bidders No. 1” (the “Special Notice”) as part of the specifications for all City construction contracts. The Special Notice encouraged prime construction contractors to include in their bids 15% participation by subcontractors certified as Disadvantaged Business Enterprises (“DBEs”) and 5% participation by those certified as WBEs. The Department implemented these goals to effectuate its policy as stated in the Special Notice:
It is the policy of the City of Jackson Department of Public Works (DPW) that small business concerns (DBE/WBE) ... shall have the maximum opportunity to participate in the performance of contraсts financed in whole or in part with City funds. The Minority Business Enterprise Program will be implemented in such manner that participation of minorities and women will be equitably distributed throughout the construction industry.
A prime contractor could, however, support a lack of such participation with a showing of good-faith efforts to meet the goals.
The Special Notice defined a DBE as “[a] small business concern which is owned and controlled by socially and economically disadvantaged individuals.” In turn, “[t]he term ‘socially and economically disadvantaged individuals’ has the meaning such term has under Section 8(d) of the Small Business Act (15 U.S.C. § 637(d)) and relevant subcontracting regulations promulgated pursuant thereto.” The Small Business Act (“SBA”) defines socially disadvantaged individuals as “those who have been subjected to racial or ethnic prejudice or cultural bias because of their identity as a member of a group without regard to their individual qualities.” 15 U.S.C. § 637(a)(5). Economically disadvantaged individuals are defined as “those socially disadvantaged individuals whose ability to compete in the free enterprise system has been impaired due to diminished capital and credit opportunities as compared to others in the same business area who are not socially disadvantaged.” 15 U.S.C. § 637(a)(6)(A). Section 8(d) of the SBA pertains to eligibility for disadvantaged status under subcontracting provisions like the one at issue in the Special Notice. It states that prime contractors are to “presume that socially and economically disadvantaged individuals include Black Americans, Hispanic Americans, Native Americans, Asian Pacific Americans, and other minorities, or any other individual found to be disadvantaged by the Administration pursuant to section 8(a) of the Small Business Act.” 15 U.S.C. § 637(d)(3)(C). Therefore, Sections 8(d) and 8(a) are both implicаted in a determination of disadvantage.
In 1991, the Mississippi legislature passed a bill that would allow cities to set aside 20% of procurement for minority
*210
businesses. According to an affidavit submitted by Willie Cole, the Jackson City Council voted to implement the set-aside, contingent on the City’s adoption of a disparity study conducted pursuant to
City of Richmond v. J.A. Croson Co.,
The City finally retained a company to conduct a disparity study in 1994. The study analyzed the City’s contracting activities within the Department of Public Works, as well as those within other City government departments, and concluded that the total underutilization of African-Amеrican- and Asian-Ameriean-owned firms was statistically significant. The study recommended that the City implement a range of MBE goals from 10-15%, depending on the trade at issue. The City, however, was not satisfied with the study and chose not to adopt its conclusions. Instead, the City retained its 15% MBE goal while it searched for another company to conduct a disparity study. Without adoption of the study, the City never implemented the 20% set-aside authorized by the state legislature.
In June 1997, the City advertised for the construction of the Thalia Mara Hall toilet expansion project (the “Project”) through its Department of Public Works. The Department included its Special Notice in the Project’s specifications. Sealed bids were opened on July 22, and Plaintiff-Appellee W.H. Scott Construction Company, Inc. (“Scott”) was the lowest bidder. On July 23, Scott informed the Department of its “attempt[s] to secure DBE participation” in subсontracting for the Project, including advertisements stating that it was “requesting bids from qualified MBEs/ WBEs.... ” Although Scott managed to get 11.5% WBE participation, it reported that the bids from DBE subcontractors had not been low bids and that, therefore, its DBE-participation percentage would be only 1%. The Director of the Department encouraged Scott to “employ a minority vendor” from whom to purchase materials in order to meet the goal.
Despite Scott’s failure to meet the DBE goal, on July 28, the Department drafted a memorandum to Mayor Harvey Johnson (the' “Mayor”) recommending approval of the Scott bid. The memorandum noted that the Scott bid exceeded the established budget for the 1996-97 fiscal year by $33,-600 and that Scott had proposed a 1% minority-participation rate. Three weeks later, Scott wrote to the Department that it would not consider the Department’s suggestions fоr increasing its minority participation. Scott sent a copy of the letter to the Mayor. The Department and the Mayor, as well as the City’s finance and legal departments, approved Scott’s bid anyway, and it was then placed on the City Council’s agenda.
On September 2, the City Council voted against the Scott bid without comment. The vote was 4-3, with all of the African-American Council members voting against Scott and all of the white Council members voting for Scott-. After the vote, Scott’s president contacted City Council member Louis Armstrong to find out why the bid was rejected. An argument ensued, and Armstrong stated, “We have been left out of the process for 400 years, we’re going to do what we have to do.” The City alleges that the Scott bid was rejected because it exceeded the budget established for the Project, not because Scott failed to reach the DBE participation goаl.
The City subsequently combined the toilet work at Thalia Mara Hall with a renovation project, adding to the specifications and increasing the estimated cost of the project from approximately $200,000 to between $300,000 and $350,000. On December 16, 1997, the City Council awarded the *211 combined project to Arcon Construction Company. At that meeting, Armstrong and the Mayor explained that the Scott bid had been rejected because it exceeded the amount allocated to the original Project from the City’s 1996-97 funds. The City, they said, had decided to expand the project, using funds allocated for the 1997-98 fiscal year, in hopes of getting a better price.
Scott maintained that rejection of its bid was racially motivated, and it filed the instant suit. In its complaint, Scott alleged that the City’s minority-participation policy (the “Policy”), as implemented through the Special Notice, discriminated аgainst nonminority contractors. Scott sought a declaratory judgment holding the Special Notice unconstitutional under the Equal Protection Clause, a permanent injunction enjoining the City from enforcing its Policy, and compensatory damages. Both Scott and the City filed motions for summary judgment. Scott, having become aware of the City’s Program and Policy Document during discovery, expanded its challenge to include them as part of the relevant Policy.
The district court granted Scott’s motion. It agreed with Scott that the relevant Policy included not just the Special Notice issued by the Department of Public Works, but that it also included the Program and Policy Document, which were issued by the OBD and applied to all City contracts. The district court concluded first that, under
Northeastern Florida Chapter of the Associated General Contractors of America, et al. v. City of Jacksonville,
Thereafter, the court conducted an evi-dentiary hearing on the issues of causation and damages. At the conclusion of the hearing, the court rendered a bench opinion, which included its findings of fact and conclusions of law. The court found that Scott’s bid was rejected because Scott lacked sufficient minority participation, not because it exceeded the City’s budget. Further, the court awarded Scott $11,643 for lost profits. The City now aрpeals.
II.
We review the grant of summary judgment de novo, applying the same criteria used by the district court in the first instance.
See Norman v. Apache Corp.,
With respect to the district court’s bench opinion, we review the court’s findings of fact for clear error; its conclusions of law are renewable de novo.
See Sepulvado v. CSC Credit Serv., Inc.,
III.
On appeal, the City contests both the district court’s grant of summary judg *212 ment, as well as the court’s findings in its bench opinion. We address еach issue in turn.
A. Summary Judgment
1. Standing
In
Northeastern Florida,
The district court began its analysis on standing by defining the challenged Policy as including the Department’s Special Notice, as well as the City’s Program and Policy Document. The City maintains that the district court should have limited its analysis to the Special Notice. We need not decide whether the district court should have so limited its analysis, because even if we assume, arguendo, that the analysis should have been so limited, Scott nevertheless prevails.
The OBD manages the City’s Program pursuant to internal guidelines set forth in its own Policy Document. The OBD’s task in administering the Program is to effect strategies encouraging minority participation in all contracts that the City lets, whether through the Department of Public Works or other City departments, for the City’s goods, services and construction projects. 2 The Department of Public Works is the department responsible for letting construction contracts, and it adopted its own policy for doing so—-the Special Notice.
The foregoing is relevant to a discussion of standing because Scott does not have standing to challenge programs relating to every contract let by the City. It is “able and ready to bid,” within the meaning of
Northeastern Florida,
Such restriction does not, however, alter the outcome of the district court’s opinion. As noted above, the district court’s final judgment restricted its holding to goal-oriented programs that affect City construction contracts. 4 Thus, even though the City avers that summary judgment was improper because there was a question of fact as to what Policy was at issue, the question does not affeсt the scope of the outcome.
The City contends, however, that Scott does not have standing to challenge the Special Notice because Scott failed to meet its threshold burden of proving that it was unable to bid on construction contracts “on an equal basis.”
Northeastern Florida,
In order to have standing, Scott must demonstrate: (1) an “injury in fact,” meaning the “invasion of a legally protected interest that is (a) concrete and particularized, and (b) actual or imminent, not conjectural or hypothetical; (2) a causal relationship between the injury and the challenged conduct,” meaning that the “injury fairly can be traced to the challenged action of the defendant, and has not resulted from the independent action of some third party not before the court; and (3) a likelihood that the injury will be redressed by a favorable decision,” meaning that “the prospect of obtaining relief frоm the injury as a result of a favorable ruling is not too speculative.”
Northeastern Florida,
In equal protection cases challenging affirmative action policies, “injury in fact” is defined as “the inability to compete on an equal footing in the bidding process.”
Id.
at 666,
*214 Contrary to the City’s assertions, the inconsistency with which the obligation is enforсed is irrelevant, because it has not negated the existence of the obligation. If a non-DBE contractor is unable to procure 15% DBE participation, it must still “satisfy the Department of Public Works that adequate good faith efforts have been made to meet the contract goal” or risk termination of its contract. Such efforts include advertising in trade-association journals and “minority focus media,” direct solicitation and follow-up with specific DBEs, and assistance in obtaining bonding or insurance required by the contractor. Further, imposition of the Special Notice on both DBE and non-DBE contractors does not speak to whether DBE and non-DBE contractors shoulder the same duties under the Special Notice.
The district court relied on the analysis of
Concrete Works of Colorado, Inc. v. City and County of Denver,
The Special Notice states under the heading “OBLIGATION” that “[t]he Contractor and any subsequent Subcontractor shall ensure thаt small business concern (DBE/WBE) have [sic] the maximum opportunity to participate in the performance of the work included in this contract.” Further, “[f]ailure on the part of the contractor to carry out the requirements set forth shall constitute a breach of contract....” Under the subheading “GOALS,” the Special Notice states that “[t]he goal may be attained by subcontracting to, procuring materials from, and renting equipment from small business concerns (DBE/WBE).” Unlike the ordinance at issue in
Concrete Works,
this
*215
language does not expressly authorize a DBE contractor to satisfy DBE-participation goals by keeping the requisite percentage of work for itself. It would be nonsensical, however, to interpret it as precluding a DBE contractor from doing so. If a DBE contractor performed 15% of the contract dollar amount, it could satisfy the participation goal and avoid both a loss of profits to subcontractors and the time and expense of complying with the “good faith” requirements.
See Monterey Mechanical Co. v. Wilson,
Scott has made an adequate showing that future injury is imminent, entitling it to seek declaratory and injunctive relief. The record indicates that Scott frequently bids on the City’s construction contracts, and Scott represented that it would continue to do so in the relatively near future. Therefore, as long as DBE preferences are used in the Department’s Special Notice, Scott is threatened with imminent injury. In this way, standing’s other prerequisites, causation and redressability, are also establishеd, for removing the preferences that cause Scott to compete on an unequal basis will alleviate that “injury in fact.” 8
2. Constitutional Analysis
The district court found that the City’s Policy — defined as including the Special Notice, the Program, and the Policy Document — created race-based preferences in the City s construction contracting. It therefore applied strict scrutiny to the racial classification and found the Policy vio-lative of the Equal Protection Clause. Although we address only the Department’s Special Notice, we reach the same conclusion. 9
The City contends that the Special Notice should not be subjected to strict scrutiny. First, the City argues that strict scrutiny should not be applied to policies that merely encourage participation “goals,” rather than mandate strict “quotas.” We agree with the district court, however, that it is irrelevant whether the Special Notice establishes “goals” or “quotas” for DBE participation. As the D.C. Circuit noted, the distinction is immaterial because “[a]ny one of these techniques induces an employer to hire with an eye toward meeting a numerical target. As such, they can and surely will result in individuals being granted a preference because of their race.”
Lutheran Church-Missouri Synod v. FCC,
Next, the City contends that application of strict scrutiny is inappropriate because the Department’s Special Notice does not create a racial classification. The City avers that the Special Notice’s DBE classification creates a preference based on “disadvantage,” not race, and that a re *216 laxed standard of review applies to such preferences. The City is correct that race-neutral preferences are not subject to strict scrutiny, but we are not persuaded that the Special Notice is race-neutral.
First, although the Special Notice does not state explicitly that a DBE is the same as an MBE, it does state explicitly that the Department is implementing the MBE Program so that “participation of minorities and women will be equitably distributed throughout the construction industry.” Further, even by its own terms, the Special Notice creates race-based presumptions that warrant strict scrutiny.
The Special Notice relies on Section 8(d) of the SBA for its definition of a DBE. As noted above, Section 8(d) states that prime contractors are to “presume that socially and economically disadvantaged individuals include Black Americans, Hispanic Ameriсans, Native Americans, Asian Pacific Americans, and other minorities, or any other individual found to be disadvantaged by the Administration pursuant to section 8(a) of the Small Business Act.” 15 U.S.C. § 637(d)(3)(C). Sections 8(d) (the “8(d) program”) and 8(a) (the “8(a) program”), as well as their implementing regulations, were also at the heart of the contract at issue in
Adarand Constructors, Inc. v. Pena,
In
Adarand,
a non-DBE subcontractor’s low bid was rejected for a DBE subcontractor’s bid under a prime construction contract let by a division of the Department of Transportation. The prime contract provided that the prime contractor would receive additional compensation if it hired subcontractors certified as “socially and economically disadvantaged individuals,” as that term was defined under Section 8(d). Like the City has argued here, the government in
Adarand
argued that “[t]he Subcontracting Compensation Clause program is ... a program based on disadvantagе, not on race, and thus that it is subject only to the most relaxed judicial scrutiny.”
In analyzing the 8(a) and 8(d) programs, the Supreme Court noted the inconsistencies between the two sections’ implementing regulations. Both programs provided explicitly for a race-based presumption of social disadvantage. See 13 C.F.R. § 124.105(b)(1996). With respect to a determination of economic disadvantage, however, the provisions were conflicting. Those wishing to participate in the 8(a) program had to make an individualized showing of economic disadvantage. See 13 C.F.R. § 124.106(a)(1996). It was unclear, however, whether subcontractors in the 8(d) program were required to make individualized showings, or whether, as Section 8(d) itself suggests, the race-based presumption applied to both social and economic disadvantage. Compare 13 C.F.R. § 124.106(b)(1996)(apparently requiring 8(d) participants to make an individualized showing of economic disadvаntage, though one that is “less restrictive” than that required for 8(a) participants) with 15 U.S.C. § 637(d)(3)(C), 48 C.F.R. § 19.703(a)(2)(1996)(apparently allowing 8(d) subcontractors to rely on race-based presumptions for both social and economic disadvantage). Nevertheless, in response to the government’s argument that a relaxed level of scrutiny should apply because its program was based on “disadvantage, not on race,” the Court stated:
To the extent that the statutes and regulations involved in this case are race neutral, we agree. [The government] concede[s], however, that the race-based rebuttable presumption used in some certification determinations ... is subject to some heightened level of scrutiny. The parties disagree as to what that level should be.
Adarand,
In
Croson,
the Supreme Court applied strict scrutiny to the City of Richmond’s Minority Business Utilization Plan, requiring the City to demonstrate that there was a compelling interest for the plan and that the plan was narrowly tailored to serve that interest.
See Croson,
The Court provided some guidance in determining what types of evidence *218 would justify the enactment of a remedial scheme. It stated,
[i]f the City of Richmond had evidence before it that nonminority contractors were systematically excluding minority businesses from subcontracting opportunities it could take action to end the discriminatory exclusion. Where there is a .significant statistical disparity between the number of qualified minority contractors willing and able to perform a particular service and the number of such contractors actually engaged by the locality or the locality’s prime contractors, an inference of discriminatory exclusion could arise.
... Moreover, evidence of a pattern of individual discriminatory acts can, if supported by appropriate statistical proof, lend support to a local government’s determination that broader remedial relief is justified.
Id.
at 509,
In the instant case, the City argues that it was error for the district court to ignore its statistical evidence supporting the Department’s use of racial presumptions in its DBE-participation goals. The City highlights the disparity study it commissioned in response to Croson, which noted:
White males and African Americans were the only two groups to obtain public works contracts. White males received 999 contracts, 94 percent of all contracts, and $264.9 million, 97.7 percent of all Public Works contract dollars. African Americans received 59 contracts, 6 percent, and $6.15 million, 2.3 percent of contract dollars. No women owned firms or firms owned by other ethnic groups received contracts....
The study concluded that “the City Council [should] consider a range of goals of 10-15 percent for both MBEs and WBEs.”
Unfortunately, whatever probity the study’s findings might have had on our analysis is of no moment. The City refused to adopt the study when it was issued in 1995, and its belated reliance is unpersuasive. Furthermore, the study was restricted to the letting of prime contracts by the City under the City’s Program; it did not include an analysis of the availability and utilization of qualified minority subcontractors, the relevant statistical pool, in the City’s construction projects.
We do not doubt in the least that the City of Jackson struggles, as it says, “to reverse the effects of its shameful racial history.” It is not alone. The Supreme Court, however, has dictated that strict scrutiny applies to racial classifications, regardless of the race of those burdened or benefitted by the classification,
see Croson,
B. Bench Opinion
Scott sought damages, from the City under 42 U.S.C. § 1988, which rеquires the City’s actions to have been found “violative of ... constitutional rights and [to] have caused compensable injury....”
Carey v. Piphus,
The City has consistently maintained that Scott’s bid was rejected because it exceeded the 1996-97 budget, not because Scott failed to meet the DBE-participation goal. On appeal, the City сontends that material facts regarding causation were in dispute and that the district court erred by relying on these facts in its award of damages to Scott. The City would be correct if it had requested a jury for resolution of these issues, but because it did not, we review the district court’s findings of fact for clear error.
See Sepulvado,
The district court determined that Scott’s bid was rejected for failure to comply with the DBE goal based on testimony elicited at the hearing. Both sides presented plausible testimony regarding the rejection of Scott’s bid, and the district judge noted:
[T]his is a contest between credibility of the testimony of W.H. Scott, the president of W.H. Scott Construction Company, Inc., the plaintiff, and Louis Armstrong, the councilman for the City of Jackson who was then and presently is serving as president of that body. Based upon the court’s determination of the credibility of these witnesses, there is circumstantial evidence to consider.
In considering the circumstantial evidence, the court noted that again it was “faced with the question of which side to believe and must be guided by the burden of proof which is on the plaintiff to prove its case by a preponderance of the evidence.” The *220 court was finally persuаded by three pieces of circumstantial evidence that Scott’s bid was rejected because it did not meet the DBE goal. First, the only discussions between the Department and Scott prior to the rejection of Scott’s bid focused solely on Scott’s lack of minority participation, not on budgetary concerns. In addition, although the City maintains that -the City Council was not aware of those discussions between Scott and the Department, and thus would not have based its rejection of Scott’s bid on a failure to comply with the Special Notice, Louis Armstrong offered conflicting accounts of whether or not he had discussed Scott’s bid with the Department’s manager prior to' the City Council vote. Second, Armstrong first testified that he had not discussed Scott’s bid with the other City Council members prior to their vote, but he then equivocated and testified that he had spoken to one or two of them. Third, although the City claimed to have wanted to expand the building project rather than accept Scott’s bid, the district court noted that one of the reasons the City proffered for expansion of the project — a $125,000 water-proofing assignmenU-never even occurred.
Given the deferential standard under which we review these findings and the “credibility contest” the district court faced, we conclude that it is plausible in light of the entire record that the City Council rejected Scott’s low bid because Scott failed to meet the Special Notice’s DBE-participation goal, not because Scott’s bid exceeded the City’s budget. Furthermore, because no arguments were presented contesting the amount of damages awarded Scott, we affirm the award of lost profits in the amount of $11,643.
IV.
For the foregoing reasons, the district court’s judgment is AFFIRMED.
Notes
. Although the Program, as well as the other City initiatives rеferenced infra, established goals for the utilization of WBEs, these goals are not specifically at issue in this case. Therefore, we will not focus on them in our discussion.
. These strategies are not limited to examining past procurement activity and setting minority-participation goals accordingly. The Program also includes strategies for developing networks between minority businesses and the public/private sector, and providing technical assistance and training sessions for minority businesses.
. In its brief, even Scott focuses our inquiry on this narrow issue. It begins its argument by stating that "Scott challenged the City's policy of establishing a 'goal' of minority participation of subcontractors in construction contracts awarded by the City.... The City argues that the District Court erred in granting summary judgment to Scott and declaring the City's policy unconstitutional.”
. In its ''Conclusion,” the district court states, "The City of Jackson Policy establishing goals of 15% minority subcontractor participation in all City construction contracts violates the 14th Amendment.”
. The parties and the district court uniformly use the terms "minority” and "nonminority” to describe "DBE”s and "non-DBE”s, presupposing that certification as a DBE involves a racial classification. Despite the apparent presupposition, the City argues infra that DBE classification is not dependent on race, but rather disadvantage. The distinction, however, is relevant only to our constitutional *214 analysis and the degree of scrutiny to be applied to the classification. It is not relevant to an Article III "case or controversy” requirement. Therefore, for clarity’s sake, we presume no such racial classification in our standing analysis and address only the differing obligations of DBEs and non-DBEs, whether race-based or not.
. Admittedly, the City of Jacksonville's ordinance at issue in
Northeastern Florida
differs from the Department’s Special Notice in that the Jacksonville provision required 10% of the funds spent on city contracts to go to MBEs, and nonminority contractors were foreclosed from bidding on those projects reserved for MBEs.
See Northeastern Florida,
. The language in the Policy Document that the district court relied upon states in relevant part:
The City may count as its M/WBE participation expenditures to M/WBEs that perform a commercially useful function in the work of a contract. An M/WBE is cоnsidered to perform a commercially useful function when it is responsible for execution of a distinct element of the work of the contract and carrying out its responsibilities by actually performing, managing and supervising the work involved.
. The Supreme Court explained that causation and redressability were collapsed into its definition of injury in fact. See
Northeastern Florida,
. Because the parties focus our inquiry here on racial preferences, we will not address the analysis under intermediate scrutiny required for sex-based preferences.
. On remand, the lower court held that, while Congress might well have the authority under Section 5 of the Fourteenth Amendment to "recognize a nation-widе evil” as a compelling government interest for the SBA's racial presumptions, the subcontractor compensation clause at issue was not narrowly tailored to serve that interest.
Adarand Constructors v. Pena,
The effect of these, and other amendments, to the SBA’s rеgulatory scheme are not relevant to our discussion here, even though the amendments would make it easier for nonmi-norities to be certified as DBEs for purposes of the Department’s Special Notice and thus add nominal credence to the City's claim that DBE status is not based exclusively, at least, on race. First, these amendments did not exist at the time of the events in question and cannot be relied upon now as bases for decisions then. Second, even if these amendments were relevant, they would not forestall application of strict scrutiny. Neither the SBA itself nor its regulations have been declared
unconstitutional
— Adarand only addressed their use within a specific type of government contract — and racial presumptions remain incorporated explicitly in the SBA. Therefore, strict scrutiny still applies to use of these presumptions. The only difference today is that while the executive branch is bound to follow and implement the SBA, its regulations must be narrowly tailored to achieve its remedial objective.
See
63 F.R. 35726, *35728 (June 30, 1998)(noting that the proposed amendment was "[i]n response to
Adarand Constructors, Inc. v. Pena,
. We do not mean to embrace “the disparity study” as the determinative piece of statistical evidence for the enactment of, or justification for, a municipality’s affirmative action program. Nor do we attempt to craft a precise mathematical formula to assess the quantum of evidence that rises to the Croson "strong basis in evidence” benchmark. The sufficiency of a municipality's findings of discrimination in a local industry must be evaluated on a case-by-case basis. We note only that an emphasis on disparity studies is particularly relevant to the case at hand because the City contests the district court’s treatment of its own study.