Village of Bald Head Island v. United States Army Corps of EngineersVillage of Bald Head Island v. United States Army Corps of Engineers
ORDER
This matter is before the Court on Defendants’ Motion to Dismiss, Plaintiffs Motion for Partial Summary Judgment, and Plaintiffs Motion for Preliminary Injunction. A hearing was held on these matters before the undersigned on October 12, 2011, in Raleigh, North Carolina and all matters are ripe for ruling. For the reasons discussed below, Defendants’
BACKGROUND
Plaintiff filed this action on December 28, 2010, against the United States Army-Corps of Engineers, its officers, and the United States (hereinafter Defendants or the Corps) alleging several causes of actions arising from the Corps’ dredging and maintenance of the Wilmington Harbor Channel. Plaintiffs first six claims are brought under the Administrative Procedures Act (APA),
Bald Head Island and Plaintiff Village of Bald Head Island are located in Brunswick County North Carolina at the confluence of the Cape Fear River and the Atlantic Ocean, directly adjacent to the Wilmington Harbor Channel. Defendant-Intervenors Town of Caswell Beach and Town of Oak Island are also located in Brunswick County, North Carolina, directly adjacent to the Wilmington Harbor Channel. Bald Head Island is situated to the east of the opening of the Channel, while the Towns of Caswell Beach and Oak Island are situated to the west of the opening of the Channel to the Atlantic Ocean.
Wilmington Harbor
Wilmington Harbor serves as one of North Carolina’s two deep-water ports, connecting the port facilities at Wilmington to the Atlantic Ocean through a thirty-seven mile channel that runs along the Cape Fear and Northeast Cape Fear Rivers. (EA § 1.01). The federal government assumed responsibility for managing the Wilmington Harbor in 1829, and has gradually increased the channel width and depth to accommodate the changing types and size of ships that access the port. (EA § 2). In 1996, the Water Resources Development Act authorized three projects to improve the harbor that were subsequently merged into what became referred to as the Wilmington Harbor 96 Act Project (Wilmington 96 Project). (EA § 1.02). The Wilmington 96 Project improvements included deepening ocean entrance channels and widening the channel in certain areas. Due to the discovery of an area of hard rock bottom that would require extensive blasting, which would result in increased costs and environmental harms, the Corps modified its Wilmington 96 Project plans and instead proposed to realign the ocean bar entrance channel (Modified Wilmington 96 Project or the Project) (EA §§ 1.03-1.04). The Modified Wilmington 96 Project plans also proposed that beach quality material collected as a result of the realignment dredging be deposited on nearby Brunswick County beaches, specifically Bald Head Island, Caswell Beach, Oak Island, and Holden Beach, as opposed to being dumped at an off-shore ocean dredged material deposit site (ODMDS). The Corps also proposed that beach quality material collected from future maintenance dredging operations would also be deposited on the Brunswick County beaches.
Environmental Impact of the Modified Wilmington 96 Project
Pursuant to NEPA and the CZMA, the Corps was required to reassess the poten
SMP
The SMP addresses the methods of disposal of material recovered from the initial realignment and subsequent maintenance dredging of the Wilmington Harbor Channel. It notes that “[yjears of research by the [Corps] and practical knowledge gained from the operation of the numerous coastal navigation projects around the country has resulted in the realization that the littoral material must be conserved.” (SMP ¶ 20). The Corps determined that depositing beach quality dredged materials on the Brunswick County beaches both helped address ongoing erosion occurring on the neighboring beaches and was the least costly disposal method for the Corps, satisfying the Corps’ policy to “regulate the discharge of dredged material from its projects to assure that dredged material disposal occurs in the least costly, environmentally acceptable manner, consistent with engineering requirements established for the project.”
Col. DeLony Letter
During the EA process, Colonel James W. DeLony, District Engineer, United States Army, wrote a letter to the mayors of the Brunswick County beaches to be affected by the SMP. In his letter, dated June 9, 2000, Colonel DeLony stated “[a]s we approach the decision point for the Finding of No Significant Impact (FON-SI), I want to bring everyone up to date on the status of our plan to place beach quality sand excavated for the project on Bald Head Island, Caswell Beach, Oak Island, and Holden Beach” [DE 2-2], The letter went on to outline the manner in which dredged material would be deposited at each of the sites following initial construction, in addition to outlining the planned disposal cycle that would follow periodic maintenance dredging of the navigation channels. Id. Additionally, the letter notified its recipients that should then-unforeseen adverse effects result from the depositing of beach quality dredged material on the beaches, the Corps would modify the SMP or attempt to implement corrective measures.
Director Moffitt Letter
In accordance with the CZMA, North Carolina’s Division of Coastal Management (NCDCM) was apprised of the Corps’ Modified Wilmington 96 Project. On June 15, 2000, Donna Moffitt, the Director of NCDCM, wrote to Colonel DeLony to express NCDCM’s agreement that the Modified Wilmington 96 Project was “consistent with the North Carolina Coastal Management Program to the maximum extent practicable, provided that the project is
FONSI
In August 2000, after resolving outstanding concerns and obtaining all required environmental clearances, the Corps issued a Finding of No Significant Impact (FONSI) with regard to the Modified Wilmington 96 Project.
Modified Wilmington 96 Project
The Corps initiated dredging activities to realign the Inner Ocean Bar, and beach disposal of dredged material began in February 2001 and was completed in April 2002.
DISCUSSION
Defendants have moved to dismiss this action for lack of subject matter jurisdiction and for failure to state a claim upon which relief can be granted.
The Plaintiff bears the burden of establishing federal subject matter jurisdiction when challenged by a motion under 12(b)(1), Evans v. B.F. Perkins Co.,
I. APA Claims
The United States, as a sovereign, is immune from suit unless it consents to be sued. United States v. Sherwood,
Provided no private right of action exists, agency actions are subject to judicial review under the APA only if they are “final” agency actions.
Counts One through Six
Plaintiff does not complain that the Corps has failed to properly examine the environmental impact of realigning the Wilmington Harbor Channel, nor has it alleged any deficiencies in the Corps’ EA or FONSI, or that the Corps has abandoned its duty to maintain the Wilmington Harbor Channel. Plaintiffs primary concern is that the Corps has not dredged the Wilmington Harbor Channel in accordance ■with its intended schedule, and as a result Plaintiff has not received the beach quality
Agency Action
Plaintiff complains of the following conduct by the Corps and alleges that these acts represent discrete agency actions or failures to act: Defendants’ failure to implement commitments made during the NEPA process, Defendants’ failure to comply with obligations set forth in a letter from Director Moffitt in violation of the CZMA, Defendants’ decision not to act in accordance with the SMP to mitigate damage to Plaintiff in violation of the Rivers and Harbor Act, Defendants’ failure to comply with their decision document for the Wilmington 96 Project in violation of Corps regulations, the Defendants’ breach of the DeLony “contract” in violation of NEPA, and Defendants’ violation of the Moffitt “contract” in violation of the CZMA. Specifically, Plaintiff contends that the SMP, the letter from Col. DeLony, and the letter from Director Moffitt, in and of themselves, constitute discrete agency actions or commitments upon which the Corps has failed to act.
Final Agency Action
Even assuming, arguendo, that Plaintiff has in fact alleged agency action, Plaintiff has failed to show that any of the alleged agency actions are final agency actions that might confer jurisdiction on the Court. As discussed above, only final agency actions are subject to judicial review, and Plaintiff has the “burden of identifying specific federal conduct and explaining how it is ‘final agency action’ within the meaning of
Plaintiff contends that the implementation of the project planning documents “unmistakably marks the consummation of the Corps’ decisionmaking process for the project.” [DE 43 at 22]. With regard to the second prong of the Bennett test, Plaintiff points to the Corps’ failure to implement the project in accordance with the planning documents, contending that “rights or obligations [were] determined” and memorialized in the EA and FONSI. Bennett,
The final agency actions in existence here are the EA and FONSI issued by the Corps in 2000. But Plaintiff has not challenged the Corps’ decision to realign Wilmington Channel instead of deepening and widening the existing Channel, or its decision to issue a FONSI as opposed to engaging in a more in-depth investigation that would result in an Environmental Impact Statement. Plaintiff instead challenges the way in which the Corps has implemented the Modified Wilmington 96 Project.
The SMP, while incorporated by reference into the EA, serves only to detail what the Corps would do with the spoils of dredging. Whether the Corps is able to dredge in compliance with the SMP’s projected two-year maintenance cycle is not the consummation of the agency’s decision-making process, nor is it a decision by which rights or obligations have been determined or from which legal consequences will flow. Bennett,
The FONSI, EA, and SMP represent the Corps’ plan to make a beneficial use of recovered beach quality material when it engaged in initial and maintenance dredging of portions of the Wilmington Channel. Nowhere in the Project documents is a rule or order that the Corps must perform maintenance dredging so that it might provide beach quality material to the Brunswick County beaches. While the Corps has in fact initiated the Modified Wilmington 96 Project., and has continued to fulfill its duty of maintaining the Wilmington Harbor, it has been unable to implement the program according to its proposed maintenance cycle schedule. Implementation or continued operation of a project is not, however, federal agency action. California Sportfishing Protection Alliance v. F.E.R.C,
Nor do the letters from Col. DeLony and Director Moffitt represent final agency action. The Col. DeLony and Director Moffitt letters, even if they are deemed to reflect commitments on the behalf of the Corps, serve only to memorialize the Corps’ plan to make a beneficial use of beach quality sand recovered from dredging operations. They do not represent the culmination of a decisionmaking process, nor do they give rise to legal rights or consequences. See Coloradlo Farm Bureau Federation v. U.S. Forest Service,
Injunctive Relief
Plaintiff also contends that NEPA and the APA provide a basis for injunctive relief that would allow the Court to compel the Corps to dredge the Inner Ocean Bar. NEPA is a procedural statute that requires only that agencies take a hard look at environmental impacts before engaging in major actions. Nat’l Audubon Society v. Dept. of Navy,
Additionally, the language of EA and FONSI specifically refute Plaintiff’s contention that deposition of sand on the Brunswick County beaches is mitigation action that the Corps is required to take. See
Lack of Subject Matter Jurisdiction over APA Claims
It is not always patently obvious whether an action undertaken by an agency is “agency action” or “final agency action” as those terms are defined by the APA.
It is important to recognize here that Plaintiff does not contend that the Corps has done anything with beach quality sand recovered from dredging operations other than what it agreed to do; beach quality dredge spoils were deposited on the Brunswick County Beaches following each dredging operation that has occurred since the Modified Wilmington 96 Project commenced. Nor has Plaintiff contended that the Corps has attempted to dredge and deposit dredge spoils outside of the seasonal restrictions discussed in Director Moffitt’s letter, or that the deposition of dredged materials has actually resulted in environmental harms to the beaches that the Corps refuses to consider or evaluate. All that Plaintiff is trying to accomplish through this lawsuit is a determination that the Corps must dredge according to the proposed schedule outlined in the SMP and Col. DeLony’s letter. The Court cannot, however, conclude that the Corps’ planned maintenance cycle is anything more than a discretionary or interlocutory decision subject to change, and is, therefore, not a final agency action that is subject to judicial review under the APA.
II. Contract Claims
Plaintiff alleges breach of contract claims in claims five, six, seven, and eight. Each of these claims is based on either the Col. DeLony letter or the Director Moffitt letter, and alleges that those letters are memorializations of contracts between the Corps and the Brunswick County beaches and the Corps and the State of North Carolina. Counts five and seven concern the Col. DeLony letter and non-maritime contract claims, while counts six and eight concern the Director Moffitt letter and maritime contract claims.
Breach of Non-maritime Contract
The United States’ waiver of sovereign immunity with respect to contract claims is embodied in the Tucker Act,
Breach of Mantime Contract
The Corps’ activities in maintaining the Wilmington Harbor may indeed lie in admiralty, but the letters at issue in
CONCLUSION
Accordingly, for the reasons discussed above, this Court lacks subject matter jurisdiction to hear Plaintiffs claims and Defendants’ Motion to Dismiss under
Notes
. If appropriate, an agency may issue a FON-SI following preparation of an EA as opposed to preparing an Environmental Impact Statement (EIS). See
. Information about the Corps' dredging activities can be found in USACE Physical Monitoring Reports, available at http://www.saw. usace.army.mil/wilmington-harbor/main.htm
.Defendant-Intervenors oppose the Corps’ Motion to Dismiss only as to Plaintiff’s second claim for relief asserting an alleged violation of the CZMA.
. Indeed, something that is referred to by an agency as an "order” may not in fact be an "order” for purposes of the APA and determining subject matter jurisdiction in federal court. See National Ornament & Elec. Light Christmas Ass'n, Inc. v. Consumer Product Safety Commission,
. Although the Fourth Circuit has found that a district court does have jurisdiction to order specific performance of contracts against the Government, it has done so only where such relief was expressly allowed in a different statute. Foxworth,
. Additionally, insofar as Plaintiff alleges that counts five and six are founded in the APA and not in contract, the Court remains without jurisdiction to consider these claims as Plaintiff has failed to allege any final agency action that is subject to judicial review.