Vieira v. Tishman Construction Corp.Vieira v. Tishman Construction Corp.
—Order, Supreme Court, New York County (Leland DeGrasse, J.), entered on or about October 8, 1997, which, in an action by a laborer against the owner, general contractor and a subcontractor at a construction site, insofar as appealed from, granted summary judgment dismissing plaintiffs Labor Law § 241 (6) causes of action against all of the defendants, and all of plaintiffs causes of action against the subcontractor, unanimously affirmed, without costs.
Plaintiff tripped over wire mesh installed on top of a metal grid, known as “Q-decking”, covering an unfinished floor of the building under construction, which mesh becomes part of the structure of the floor when concrete is poured in the Q-decking. Although the Industrial Code regulations cited by plaintiff (12 NYCRR 23-1.7 [e] [1], [2]) are sufficiently specific to support a Labor Law § 241 (6) cause of action (Adams v Glass Fab,