Vance v. Kansas City

123 Mo. App. 644 | Mo. Ct. App. | 1907

ELLISON, J.

The plaintiff brought this action for personal injury received by him in falling over a pile of rough building stone in one of defendant’s streets. The verdict in the trial court was for the defendant. Plaintiff filed a motion for new trial and it was sustained, whereupon the city appealed.

The facts were in substancé as follows. A building was being erected on a lot abutting on the street in question and a lot of large rough stone, to be used in the building, was hauled and piled in the street near the sidewalk. Plaintiff, a boy about ten years of age, was playing in the street with other boys, when, shortly after dark, he ran upon the stone and received the injury of which he complains. The rock had been hauled, perhaps in different loads, but they or a portion of them had been left in the street unguarded at night for three days. Late in the eevening of the day plaintiff was hurt these stones were piled on the sidewalk space, at the edge of the street proper and on the same evening, perhaps immediately, one or more other loads of stone of the same character, were unloaded in the street in the *646place where the first lot had been and it was this latter lot npon which plaintiff fell. The trial conrt instructed the jury that the piling of the latter lot was too short a time before the accident to impart constructive notice to the city.

Undoubtedly, the court was right, as an abstract proposition, in holding that an obstruction in a street of only two to four hour’s (at a place where it would, in all probability, not be at once observed by proper officers) was not sufficient to establish constructive notice to the city. Abundant authority is cited by defendant to sustain that proposition. But, as applied to this case, we believe the instruction was wrong. The obstruction in the street here complained of was a continuous act from the time of the first load of stone. The stone was for the construction of the building and it was being put in the street and taken out of the street by the contractor in proceeding with the work of construction. In the circumstances here shown, the identity of the stone is of no moment, so long as an obstruction was continuously maintained. And we regard the mere space of one or two hours between the piling up of one lot on the edge of the sidewalk, and the delivery of another lot into the street, in the space occupied by those just removed,- as not breaking the continuity of the obstruction. We regard the view we here announce as being supported by the Supreme Court in Drake v. Kansas City, 190 Mo. 370. The syllabus of the decision in that case reads as follows:

“Where, in an action for injuries to a pedestrian by falling into a defectively constructed coal hole, defendant claimed that the cover of the hole had been raised on the morning of the accident by the occupant of the adjoining property to let air into the cellar, and that this had caused the accident, but the evidence also disclosed that such occupant had done the same thing every day for six weeks or two' months before the accident, *647the city was chargeable with notice of such continuing act, and was, therefore, not entitled to. an instruction that, if the raising of the coyer caused the accident defendant was not liable.”

The circuit court was right in concluding the instruction was wrong and its order granting a new trial is affirmed.

All concur.