218 Mich. 32 | Mich. | 1922
On November 1, 1919, the defendant purchased from the W. A. Paterson Company certain premises in the city of Flint. The buildings erected thereon left an “L”-shaped court in the center, on which stood a water tank constructed of wood, supported about 100 feet above the ground by four legs made of 8-inch angle iron riveted together, each sunk in a concrete foundation. There were 16 cross girders or braces running from one leg to another and also sway rods fastened into the legs between each set of cross girders, forming an "X” on each side. The tank itself was 22 feet high and about 20 feet in diameter, slightly tapering towards the top. Its purpose was to supply a sprinkler system installed in the buildings on the premises. A frost proof easing from the ground to the tank inclosed a pipe which supplied it with water. This was connected with the city water main and when a valve therein was opened and the pressure sufficient it was supplied in that way. When the pressure was not sufficient, the water was forced up by a pump in an engine room adjacent to the court. There was a gauge on the tank to indicate the height of the water, but it was out of order. It was the duty of the man operating the engine to see that the tank was filled daily and that when full the water was turned off. If the water was not turned off and the pressure sufficient, it would overflow the tank. A pipe had been placed near the top of the tank to take care of this overflow, which was led to the ground a little to one side of the tank. There was also a hot water pipe leading from the engine room into the tank to prevent the water from freezing. This heating
The plaintiffs occupied the basement story of one of the buildings on these premises. They had been tenants under the Paterson Company and continued to occupy under the defendant. John P. McCann was the manager of the defendant company. In the latter part of November, 1919, McCann employed one Jerome Hoffman to paint the tank. In doing so, Hoffman found that the tank was leaking and so reported to McCann, who gave him instruction “to go ahead and repair it.” Hoffman discovered that to do so he must empty the tank and McCann obtained permission for him to do so from the insurance company carrying the risk on the buildings. After its repair, the tank was re-filled and occasional reports made to McCann that it was overflowing. This was said to be due to unusual pressure in the city mains. Hoffman was employed to connect the overflow pipe with the city sewer. The water from the overflow became frozen and the ice fastened itself to the tank and its supporting structure. About the 22d of January the condition became alarming. Defendant made inquiry and finally secured the services of two men, John Tyler and John Blackburn, to remove this ice. It was a somewhat dangerous task, owing to the height of the tank. A contract was made with them by McCann to do the job for $50. They began work on the afternoon of January 24th. White working at it, Blackburn climbed to the top of the tank and found the water in it frozen over. He cut a hole in the ice, which was from 8 to 10 inches in thickness. Deeming it necessary, Tyler drew off a few inches of the water in the afternoon and, later in . the day, the remainder of it. When they quit work that evening, a considerable quantity of the ice had
Plaintiffs brought this suit to recover the damages occasioned thereby. Their declaration counts on a failure to inspect; a failure to keep in repair; a failure to properly operate; a failure to so provide that the tank would not overflow and thus permit ice to form, on and in the tank, and a failure to use proper care-in removing the ice. The plea was the general issue. Plaintiffs had verdict for $13,127.66, on which judgment was entered. There are many assignments of error. That most strongly insisted on by defendant, is that the court erred in not directing a verdict in its favor. This will be first considered.
1. («) It is insisted that—
“under the proofs the fall of the tank was the result of unknown extraordinary causes, which the defendant by the exercise of ordinary care and skill could not have avoided.”
(6) That if it was due to the negligence of Tyler and Blackburn in the manner in which they did their work of removing the ice or the cutting of the hole in the ice in the tank and drawing off the water under it, they were independent contractors, experienced, competent and skilful for such work, and the defendant is not answerable for any negligence on their part.
The court submitted the first question to the jury. As to the second, he instructed them:
“I charge you it was their (defendants’) duty at that time to know the condition and take care of this tank. And if you find it had become in such con*36 dition by an accumulation of ice upon the tank as to be a liability of the destruction or falling of the tank, then I charge you that the employing of Tyler and Blackburn as independent contractors to remove the ice would not relieve the defendants.”
. He further instructed them that if the formation of the ice on the tank was due to defendant’s negligence, the fact that its falling was due to the unskilful manner in which Tyler and Blackburn, as independent contractors, performed their work would not relieve the defendant of liability — in other words that the doctrine of “independent contractor” had no application.
It seems well to dispose of this latter contention first.
(6) Defendant relies on the rule stated in 1 Thompson on Negligence, § 621, as follows:
“One who has contracted with a competent and fit person, exercising an independent employment, to do a piece of work not in itself unlawful, or of such a nature that it is likely to become a nuisance, or to subject third persons to unusual danger, attended with danger to others, according to the contractor’s own methods, and without being subject to control except as to the results of his work, * * * will not be answerable for the wrongs of such contractor, his subcontractors, or his servants, committed in the prosecution of such work.”
This rule is subject to many exceptions. Several of them are noted by the learned writer in the sections following. We are impressed that the facts in this case as claimed by the plaintiffs presented an exception and justified the charge as given. The instruction was predicated on a finding by the jury that the formation of the ice in and on the tank and its supports rendered the structure dangerous to the adjacent property; that such dangerous condition was due to the negligence of the defendant in permitting the ice
This exception to the general rule has been recognized by this court. In Peerless Manfg. Co. v. Bagley, 126 Mich. 225 (53 L. R. A. 285, 86 Am. St. Rep. 537), in speaking of exceptions to the general rule of non-liability, Mr. Justice Grant said:
“There is, however, another rule, and which may be called an exception to that above stated, viz., that, where one owes an absolute duty to another, he cannot acquit himself of liability by delegating that duty to an independent contractor.”
See, also, Lauer v. Palms, 129 Mich. 671 (58 L. R. A. 67); Blickley v. Luce’s Estate, 148 Mich. 233.
In Sciolaro v. Asch, 198 N. Y. 77 (91 N. E. 263, 32 L. R. A. [N. S.] 945), it was held that the performance of such a duty could not be delegated so as to relieve the person upon whom the duty rested of liability for its proper performance, and the following from Shear-
‘“One who is personally bound to perform a duty cannot relieve himself from the burden of such obligation by any contract which he may make for its performance by another person. Therefore the fact that he may have used the utmost care in selecting an agent to perform this duty, or that he has entered into a contract with any person by which the latter undertakes to perform the duty, is no excuse to the person upon whom the obligation originally rested, in case of failure of performance. His obligation is to do the thing, not merely to employ another to do it.”
In Wertheimer v. Saunders, 95 Wis. 573 (70 N. W. 824, 37 L. R. A. 146), the court said:
“That one upon whom the law devolves a duty cannot shift it over upon another, so as to exonerate himself from the consequences of its nonperformance, is very clear.”
See, Goff v. Great Northern R. Co., 3 El & El. 672; Ruff Drug Co. v. Western Iowa Co., 15 A. L. R. 962 (191 Iowa, 1035, 181 N. W. 408), and note thereto.
(a) The jury were instructed that in order for the plaintiffs- to recover they must find—
“that the defendants are guilty of negligence in the manner in which they took care of and managed and controlled this tank.”
At the request of defendant’s counsel, they were also instructed:
“I further charge you that the undisputed proofs in this case show that the ice upon the outside of the tank and upon the structure could, by the exercise of ordinary care and skill on the part of a competent, experienced person, have been removed without danger to any one or to any property.”
There was no sufficient reason assigned for permitting the tank to so overflow that such a large body of ice should be formed on it and its supports. There
There are many other assignments of error, but all discussed by counsel relate to the two questions we have considered. We have read the record carefully, given due weight to all claims of defendant’s counsel, and feel constrained to hold that the case was fairly tried and that the verdict is not against the great weight of the evidence.
The judgment is affirmed.
liability of landlord for damages to tenant’s goods for negligence of independent contractor in making repairs, see note in 15 A. L. R. 975.