MEMORANDUM AND ORDER
Before the Court are motions for a temporary restraining order and preliminary injunction filed by defendants NL Industries, Inc., Johnson Controls, Inc., AT & T Corporation, Allied-Signal, Inc., Gould Electronics, Inc., and General Battery Company (Doc. No. 218), in which defendant Exide Corporation joins (see Doe. No. 227), and the City of Granite City (“City”) (Doc. No. 220).
*547 I. Introduction
The NL Industries/Taracorp Superfund Site includes roughly 16 acres in and around Granite City, Illinois, where a battery recycling facility and secondary lead smelter was operated from 1903 to 1983. Also included in the site are approximately 55 square blocks of residential property surrounding the smelter.
The United States Environmental Protection Agency (“EPA”) is in the process of removing soil from residential yards in Granite City, Illinois, that have lead levels greater than 500 parts per million (“ppm”). The lead in the residential soil resulted from the emission of lead from smelting operations. The City and the defendants argue that the EPA’s selection of the 500 ppm clean-up level was arbitrary and capricious and they believe that limiting the clean-up to residential properties with 1000 ppm or greater will adequately protect human health. 1 The City and the defendants seek to have the Court enjoin the residential clean-up until the Court has addressed the propriety of the EPA’s selection of the 500 ppm clean-up threshold.
II. Procedural Background
The United States filed its complaint on July 31, 1991. The defendants and others were named as Potentially Responsible Parties (“PRPs”) as either owner-operators of the smelter or as transporters of hazardous material to the site. See sections 106 and 107 of CERCLA, 2 42 U.S.C. §§ 9606 & 9607. As such, the PRPs are potentially liable for costs associated with cleaning up the site under 42 U.S.C. § 9607. The plaintiff seeks: (1) to recover past response costs associated with the clean-up of hazardous materials at the site; (2) a declaration that the PRPs will be liable for future response costs; (3) in-junctive relief to compel the PRPs to undertake response actions at the site; and (4) civil penalties and punitive damages. Complaint, Doc. No. 1. The City intervened in an attempt to stop or limit the scope of the EPA’s proposed clean-up. See Doc. Nos. 50 & 76.
III.Jurisdiction
The City and the defendants cite CERC-LA §§ 113(h)(1) & (4), 42 U.S.C. 9613(h)(1) & (4), as the bases on which the Court has jurisdiction to enjoin the EPA’s remedial action. 3 Section 113(h) provides in pertinent part:
(h) Timing of review
No Federal Court shall have jurisdiction under Federal law other than under section 1332 of Title 28 (relating to diversity of citizenship jurisdiction) or under State law which is applicable or relevant and appropriate under section 9621 of this title (relating to cleanup standards) to review any challenges to removal or remedial action selected under section 9604 of this title, or to review any order issued under section 9606(a) of this title, in any action except one of the following:
(1) An action under 9607 of this title to recover response costs or damages or for contribution.
(4) An action under section 9659 of this title (relating to citizens suits) alleging that the removal or remedial action taken under section 9604 of this title or secured under section 9606 of this title was in violation of any requirement of this chapter. Such an action may not be brought with regard to a removal where a remedial action is to be undertaken at the site.
A. Jurisdiction Under § 113(h)(1)
The City and the PRPs argue that the plain language of § 113(h)(1) provides *548 that the Court has jurisdiction to award in-junctive relief upon the filing of a cost recovery action under § 107, 42 U.S.C. § 9607. 4 The EPA does not dispute the City’s assertion that the Court has jurisdiction under § 113(h)(1) to review the selected remedy once a § 107 action is filed. However, the EPA takes issue with the City’s contention that the Court has jurisdiction under § 113(h)(1) to enjoin an ongoing remedial action. The EPA contends that § 113(h)(1) gives the Court jurisdiction in a cost recovery action under CERCLA only to consider the PRP’s defenses to liability and to challenge costs assessed against them.
In support of their assertion that § 113(h)(1) gives the Court jurisdiction to enjoin the clean-up, the City and the PRPs rely on
United States v. Princeton Gamma-Tech, Inc.,
With regard to the remedies available, the court looked to § 113(j)(3), which provides:
If the court finds that the selection of the response action was arbitrary and capricious or otherwise not in accordance with law, the court shall award (A) only the response costs or damages that are not inconsistent with the national contingency plan, and (B) such other relief as is consistent with the National Contingency Plan. 5
The court observed that § 113(j)(3) “makes it clear that the available remedies are not limited to a mere reduction of the amount recoverable for expenditures, but may also include any relief consistent with the National Contingency Plan.”
Princeton Gamma-Tech,
While
Princeton Gamma-Tech
clearly supports the position of the City and the PRP’s, the Seventh Circuit has taken a more restrictive view of the relief available under § 113(h). In
North Shore Gas Co. v. E.P.A,
The court first determined that North Shore did not have standing under NEPA or RCRA to challenge the construction of the new slip. Id. at 1243-44. The court then went on to analyze the jurisdictional bar of § 113(h). The court observed that “the purpose of section 113(h) is to prevent litigation from delaying remediation.” Id. at 1244. The court posed a hypothetical in which, had the EPA listened to reason, the cost to build the new slip would be $1 million less with no added cost to Outboard Marine or the environment. Id. at 1245. North Shore’s most promising course of action would be to sue the government for reimbursement under 42 *549 U.S.C. § 9606(b)(2)(D), which is exempted from the jurisdictional bar by § 113(h)(1), 42 U.S.C. § 9613(h)(1). Id. However, the remedial order was addressed to Outboard Marine, not North Shore, and “the statute as worded envisages a suit by the person to whom the remedial order was addressed. ...” Id. The court observed that
the purpose of [§ 113(h) ] was not to defeat an aggrieved person’s presumptive right of judicial review of agency action, Bowen v. Michigan Academy of Family Physicians,476 U.S. 667 , 670-73,106 S.Ct. 2133 , 2135-37,90 L.Ed.2d 623 (1986), but merely to postpone the exercise of the right to the completion of the remedial action. Schalk v. Reilly,900 F.2d 1091 , 1095 (7th Cir. 1990); Alabama v. EPA,871 F.2d 1548 , 1557-58 (11th Cir.1989). However, the method of section 113(h) is not to toll judicial remedies, and leave it at that; it is to specify the remedies that survive. Once the remedial action has been completed, a suit either to enjoin the action or to compel it is moot, and “the statute does not authorize either form of suit.”
Id. (emphasis added).
With regard to the remedies available under § 113(h), the court noted that
a party in North Shore’s situation still has an action for reimbursement, § 113(h)(3), or contribution, § 113(h)(1); the federal or a state government its suit to recover response costs, id.; the citizen eomplainer his action to enforce the order if it is not obeyed, § 113(h)(4). If the provision on suits for reimbursement is not interpreted generously, a firm in North Shore’s position may find itself without any judicial remedy against arbitrary and capricious agency action, and that was not Congress’s intent.
Id.
The PRPs in the present action do not face the problem confronted North Shore in the court’s hypothetical; the PRPs in this case were named in the remedial order. Thus, the PRPs have relief available under the statute. The only harm the PRPs face is monetary and, if they can show that the EPA’s remedy selection was arbitrary and capricious or that they were not responsible for the pollution, they can avoid some or all liability for the clean-up.
The City is in a different position, however. Should the Court find that it does not have jurisdiction to enjoin the clean-up, the City will be left with no meaningful relief for all practical purposes. The only relief sought by the City, apart from attorneys fees, is an injunction against the clean-up. If there is no judicial review until after the remedial action is completed, the City’s action is moot.
The North Shore court, after noting the “troublesome” breadth of section 113(h), proposed a hypothetical situation that is instructive with regard to the City’s position:
Suppose the EPA took the position that “Waukegan Harbor’ includes Racine Harbor. Would there be no possibility for judicial review at the behest of users of Racine Harbor adversely affected by the application of the remedy to them? It looks that way, though no doubt the courts would strain to avoid so unappetizing a result. Cf. Adamo Wrecking Co. v. United States,434 U.S. 275 ,98 S.Ct. 566 ,54 L.Ed.2d 538 (1978). Our hypothetical users would have no suit for reimbursement unless they were ordered to clean the harbor up, and let us suppose they were not. In such a case section 113(h) would be doing a good deal more than affecting the “timing” of judicial review; it would be extinguishing judicial review.
Id. at 1245 (emphasis added).
At oral argument, the PRPs argued that the City is in the same position as the users of Racine Harbor in the North Shore Gas hypothetical. The point is well taken. However, the North Shore court indicated that the users of Racine Harbor would have no opportunity for judicial review. (“It looks that way_”). Moreover, the Court does not have to “strain” to avoid the result posed in the hypothetical because the EPA’s selection of the 500 ppm versus a 1000 ppm soil lead threshold in this case does not rise to the level of patent absurdity as would including Racine Harbor in the definition of Wauk-egan Harbor. This is not to say that the selection of the 500 ppm threshold may not be found arbitrary and capricious after a *550 thorough examination of the administrative record. The point is that implementation of the elean-up using the 500 ppm threshold, as opposed to a 1000 ppm threshold, does not present a situation in which the Court finds a need to swim against the tide of persuasive authority on this issue.
The Seventh Circuit also addressed the scope of § 113(h) in
Employers Insurance of Wausau v. Browner,
While the Seventh Circuit statements cited above are dicta, 6 they are instructive in that they reveal a preference for a narrow interpretation of the statutory language rather than the broad interpretation reflected in Princeton Gamma-Tech. The Employers Insurance court observed that the relief available under § 9613(h) does not include a suit for injunctive or declaratory relief by the person ordered to perform a clean-up. On the other hand, the statute does not allow for a suit for injunctive or declaratory relief by anyone else, including a person not named in the clean-up order. Thus, there is no basis on which to conclude that the City may seek remedies that are not available to the PRPs. 7
The legislative history of § 113(h)(1)— while not specifically addressing the jurisdiction of federal courts to enjoin ongoing remedial actions — tends to support the EPA’s position. The House conference report that reconciled the conflicting House and Senate versions of the statute is not helpful with regard to § 113(h)(1) other than to say that the conference committee adopted the version contained in both the House and Senate amendments. H.R.Rep. No.99-962, 99th Cong., 2d Sess 223, reprinted in 1986 U.S.C.C.A.N. 3276, 3316.
The report of the House Energy and Commerce Committee expresses an intent to permit review of the remedial action once a cost-recovery action under § 107 is filed, but it does not anticipate an action seeking to enjoin the remedial action. The report states that “[Response actions or consent orders under section 104 and orders under section 106 may be subject to judicial review at the
*551
time the government seeks cost recovery. ..H.R.Rep. No. 99-253(1), 99th Cong., 2d Sess 81,
r&printed in
1986 U.S.C.C.A.N. 2835, 2863. However, the report also states that § 113(h) “is intended to codify the current position of the Administrator and the Department of Justice with respect to preenforcement review: there is no right of judicial review of the Administrator’s selection and implementation of remedial actions until after the remedial action have been completed to their completion [sic].”
Id.
These two statements taken together apparently reflect a presumption that the government would not bring a cost recovery action until after the remedial action is completed, but the statement of intent indicates that the purpose of § 113(h) that the cleanup of hazardous waste should not be delayed by litigation. See
North Shore,
The report of the House Public Works and Transportation Committee provides:
The purpose of this provision [§ 113(h) ] is to ensure that there will be no delays associated with a legal challenge of the particular removal or remedial action selected under section 104 or secured through administrative order or judicial action under section 106. Without such a provision, responses to releases or threatened releases of hazardous substances could be unduly delayed, thereby exacerbating the threat of damage to human health or the environment. A person’s rights to challenge the choice of removal or remedial action are preserved, however, and can be exercised when an action is taken against a responsible party to recover response costs or damages under section 107, ...
H.R.Rep. No. 99-253(V), 99th Cong., 2d Sess 25-26, reprinted in 1986 U.S.C.C.A.N. 3124, 3148-49. This passage also reflects an apparent expectation that the government would not seek reimbursement costs until after the completion of a remedial action. But again, in order to fulfill the expressed intent of the statute — to prevent litigation from delaying the clean-up — the statute must be interpreted so as to prohibit enjoining a remedial action while allowing a defendant in a cost-recovery action to assert defenses to liability.
The House Judiciary Committee reported the same version of §§ 113(1), (2) & (3) as reported by the House Energy and Commerce Committee with the comment that “in the absence of a government enforcement action, judicial review of the selection of a remedial action should generally be postponed until after the response action is taken.” H.R.Rep. No. 99-253(111), 99th Cong., 2d Sess 22, reprinted in 1986 U.S.C.C.A.N. 3038, 3045. The Judiciary Committee report provides some support for the argument that a party may seek to enjoin a remedial action prior to its completion under § 113(h). Id. at 3047 (stating that a party seeking to stay a response action must show irreparable harm and likelihood of success on the merits). However, it is unclear whether these statements refer to § 113(h) in its entirety or to some proposed amendments that were not adopted. (§ 113(i)(6), (7) & (8) in the report). Id. at 3046-47. In any case, even if the proposed amendments had been adopted, the report states that staying a response action would occur “rarely, if at all[.]” Id. at 3047.
Based upon the persuasive authority cited above and the legislative history of § 113(h)(1), the Court concludes that § 113(h)(1) does not provide federal courts with jurisdiction to enjoin an ongoing remedial action. Rather, § 113(h)(1) gives federal courts jurisdiction to review the propriety of the EPA’s selected remedy once a § 107 action is filed. Defendants may assert defenses to liability, but the statute does not explicitly permit the Court to enjoin an ongoing remedial action. If the Court finds that the EPA’s remedy selection was arbitrary and capricious based upon the administrative record, § 113(j)(l), the Court can limit a PRP’s liability to “only the response costs or damages that are not inconsistent with the national contingency plant,]” § 113(j)(3)(A), and award “such other relief as is consistent *552 with the National Contingency Plan.” § 113(j)(3)(B). Even if the Court concluded that injunctive relief is consistent with the NCP — which it does not — the plain language of the statute requires a finding that the remedy selection is arbitrary and capricious before any relief may be awarded under § 113(j)(3)(B). 8
For the foregoing reasons, the Court concludes that it does not have jurisdiction under CERCLA § 113(h)(1), 42 U.S.C. § 9613(h)(1), to enjoin an ongoing remedial action.
B. Jurisdiction Under § 113(h)(4)
In the alternative, the City and the PRPs argue that the Court has jurisdiction to award injunctive relief under CERCLA § 113(h)(4), 42 U.S.C. § 9613(h)(4) — the citizens suit exception to the bar on judicial review.
9
Again, the City and the PRPs primarily rely on
Princeton Gamma-Tech
to support their argument. In analyzing the citizens suit exception to the bar on judicial review,
Princeton Gamma-Tech
supported its conclusion that a federal court has jurisdiction to enjoin an ongoing remedial action under § 113(h)(4) with a somewhat strained analysis of the statute’s legislative history by quoting statements from individual legislators during debate on CERCLA.
Id.
at 145-46. The concurring opinion in
Princeton Gamma-Tech
agreed with the majority’s holding that jurisdiction was proper under § 113(h)(1), but took exception to its analysis of § 113(h)(4).
Id.
at 150-53 (Nygaard, J. concurring). The concurrence pointed out that every other United States Court of Appeals that had addressed the issue held that federal courts do not have jurisdiction to review the EPA’s remedy selection under § 113(h)(4) until the remedial action is completed.
Id.
at 151. The primary basis of those holdings is the textual analysis of the statute, which refers in the past tense to actions
taken
or
secured
and the statute’s legislative history.
Id.
(citing
Arkansas Peace Ctr. v. Arkansas Dep’t of Pollution Control and Ecology,
The legislative history of § 113(4)(4) was thoroughly addressed by the Seventh Circuit in
Schalk,
where the Court stated, “[t]he legislative history supports the conclusion that federal courts are deprived of subject matter jurisdiction where remedial action has
*553
not been completed.”
Schalk,
The final conference committee report that reconciled the conflicting House and Senate versions explained that only “completed” remedial actions could be challenged. H.R.Rep. No. 962, 99th Cong., 2d Sess. 224 (1986), U.S.Code Cong. & Admin.News 1986, p. [3317]. The House Committee on Energy and Commerce stated that “there is no right to judicial review of the Administrator’s selection and implementation of response actions until after the response action have been completed to their completion [sic]” H.R.Rep. No. 263(1), 99th Cong., 2d Sess. 81 (1986), U.S.Code Cong. & Admin.News 1986, p. 2863. The House Judiciary Committee noted that “[t]his provision is not intended to allow review of the selection of a response action prior to completion of the action_” H.R.Rep. No. 253(III), 99th Cong., 2d Sess. 23 (1986), U.S.Code Cong. & Admin.News 1986, p. 3046. These committee reports, along with many other statements of congressional leaders, far outweigh the few contrary remarks of individual legislators cited by plaintiffs. The statute as written clearly states the intent of Congress.
Id. at 1096.
The
Princeton Gammar-Tech
court distinguished
Sehalk
and two other circuit court decisions,
Arkansas Peace Center v. Arkansas Dept. of Pollution Control and Ecology,
In any case, the Seventh Circuit clearly stated that federal courts do not have jurisdiction under § 113(h)(4) to enjoin an ongoing remedial action.
Sehalk,
IV. Irreparable Harm
Even if the Court followed the holding of
Princeton Gamma-Tech
— that injunc-tive relief may be issued when irreparable harm to public health or the environment is threatened,
Princeton Gamma-Tech,
In support of its claim that the City’s economy will be adversely impacted by the clean-up, the City has submitted the affidavit of Geoffrey Hewings, a professor in the Departments of Geography and Urban and Regional Planning at the University of Illinois. Doc. No. 228, Ex. A Professor Hewings’s opinion is that “the remedy chosen by the EPA will adversely impact the residents and businesses in Granite City.” Id. at 3, ¶ 9. Professor Hewings bases this conclusion on: (1) reduction in property values in the City, id., ¶ 11; (2) increased traffic congestion, id., ¶ 12; and (3) decreased City tax revenues. Id., ¶ 13.
Professor Hewings’s conclusion that property values in the City have decreased is not supported by any evidence that such a decrease has been caused by the remedy as opposed to the pollution. Moreover, it defies logic that a home that has been designated as having dangerously high soil lead levels— regardless of whether the lead levels are in fact dangerous — would be more valuable than one that has been remediated, all other things being equal.
With regard to the increased traffic congestion, Professor Hewings concludes that “the impact on businesses in Granite City will be devastating” and “[r]esidents and customers, who frequent businesses in the downtown area of Granite City, will face increased traffic, congestion, and delays relating to the remedy,” which will result in “the potential [ ] for businesses in downtown Granite City to fail.”
Id.
at 3-4. It is well established that “the right to continue a business ... is not measurable entirely in monetary terms.”
Semmes Motors, Inc. v. Ford Motor Co.,
The City next argues that the clean-up threatens the construction of the “16th Street Corridor.” The City supports this conclusion with the affidavit of William Baudendistel, a contract engineer for the City of Granite City. Doc. No. 228, Ex. B. Baudendistel states that 16th Street is a “vital, economic link for Granite City Steel,” the construction of which will cost approximately $1.5 million. Id. Baudendistel further states that “the City surmises that because the project site is considered to be a portion of the NL Superfund site ... safety procedures ... for hazardous waste sites must be followed,” id., ¶ 4, which will result in an additional $400,000 to $1.5 million in construction costs. Id., ¶5.
In response, the EPA takes issue with the City’s assumption that the 500 ppm standard *555 would apply to the area of road construction because the 500 ppm threshold applies only to residential property. Doe. No. 231 at 44 n. 37, 46-47. The EPA contends that the 16th Street construction zone would only be subject to the 1000 ppm non-residential threshold and, therefore, construction costs would be unaffected should the selection of the 500 ppm threshold be found arbitrary and capricious. Id. The Court finds this argument persuasive. There is nothing in the record to indicate that any non-residential property, including the proposed 16th Street corridor, would be subject to the 500 ppm threshold. As a result, there is no basis on which to conclude that the construction costs of the 16th street corridor would be greater because of the EPA’s selection of the 500 ppm residential property threshold rather than a 1000 ppm threshold.
The City’s next argument is that permitting the EPA to clean-up lead-contaminated soil will give the City’s residents a false sense of security that could result in the residents failing to appreciate the health risk of lead-based paint in their homes. 11 The City argues that lead from all sources should be considered in addressing the health risks associated with lead in the environment. 12 However, CERCLA § 104(a)(3)(B), 42 U.S.C. § 104(a)(3)(B), precludes the EPA from eon-ducting remedial actions in residential buildings. 13 In addition, whereas some residents could conceivably be lulled into a false sense of security by having their yards remediated, the failure to appreciate the threat of lead paint does not rise to the level of irreparable harm to public health or the environment. The most appropriate way to deal with this problem would be to educate the residents of the City about the health risks of lead paint rather than halt the clean-up of residential soil. 14
Finally, the City argues that remediating residential soil with lead levels greater than 500 ppm will have no appreciable effect on the health of the City’s residents. Doc. No. 228 at 3, 19-20. This may or may not be true, however, the City is essentially arguing that the EPA’s remedy will leave residential soil too clean. This argument cannot support a claim of irreparable harm to public health or the environment. 15
The Court is mindful of the City’s frustration at its inability to halt the implementation of the EPA’s remedy. However, as the Ninth Circuit observed in
McClellan Ecological Seepage Situation v. Perry,
*556 We recognize that the application of Section 113(h) may in some cases delay judicial review for years, if not permanently, and may result in irreparable harm to other important interests. We must presume that Congress has already balanced all concerns and ‘concluded that the interest in removing the hazard of toxic waste from Superfund sites’ clearly outweighs the risk of irreparable harm.
Id.
at 329 (quoting
Boarhead Corp. v. Erickson,
Based upon the foregoing analysis, the Court concludes that it does not have subject matter jurisdiction to enjoin an ongoing remedial action under CERCLA § 113(h)(4). Even if the Court concluded otherwise, the City and the PRPs have not made a sufficient showing of irreparable harm to warrant injunctive relief.
Y. Constitutionality of CERCLA After Lopez
The City and the PRPs argue that even if the Court concludes that it does not have jurisdiction to enjoin the clean-up, the EPA is still acting without authority to conduct the clean-up because CERCLA is unconstitutional. Doc. No. 231 at 68. In support of this argument, the City and the PRPs rely on
United States v. Olin Corp.,
Lopez
reiterated the principle that Congress may regulate commerce under the Commerce Clause in three broad categories. “First, Congress may regulate the use of the channels of interstate commerce.”
Id.
at -,
The EPA argues that the activities regulated under CERCLA fall under all three categories. If in fact the activities regulated by CERCLA fall into one or both of the first two categories, the EPA concludes, CERC-LA does not fall within the scope of the holding of Lopez and, therefore, it is not subject to the “substantially affects” test. Doc. No. 231 at 70. In reply, the City and the PRPs assert that the “Superfund Site at issue is neither a channel of commerce nor a person or object that moves through such channels.” Doc. No. 235 at 32. 17
The EPA contends that CERCLA falls under the first category because “CERCLA was enacted to address hazardous
*557
substances generated primarily by manufacturers, like chemical companies and other industries, the products of which move in interstate commerce.”
Id.
at 71. The first category is limited to the regulation of the misuse of channels of interstate commerce.
United States v. Wilson,
On the other hand, CERCLA imposes liability on those who transport hazardous waste which later must be cleaned up. CERCLA § 107(a), 42 U.S.C. § 9607(a)(4). CERCLA also specifically requires that hazardous substances listed under 42 U.S.C. § 9601(14) be listed and regulated as a hazardous material under the Hazardous Material Transportation Act. CERCLA § 306(a), 42 U.S.C. § 9656(a). However, as the Seventh Circuit pointed out in
United States v. Kenney,
With regard to the second category — regulation and protection of the instrumentalities of interstate commerce, or persons or things in interstate commerce — the EPA argues that “the pollution itself, and the media in which it is carried — including the air, soils, surface water, and groundwater — all move in interstate commerce or are channels of interstate commerce, and thus are necessarily subject to regulation by Congress under its commerce powers.” Doc. No. 231 at 71. The EPA’s argument is persuasive insofar as groundwater and surface water do not recognize state boundaries. One of CERCLA’s highest priorities is the protection of surface water, CERCLA § 105(c)(2), 42 U.S.C. § 9605(c)(2),
18
and groundwater resources. CERCLA § 118, 42 U.S.C. § 9618.
19
The Supreme Court has explicitly recognized that
*558
ground water is an article of commerce.
Sporhase v. Nebraska ex rel. Douglas,
Finally, the City and the PRPs rely on Olin to support their contention that CERC-LA is not a proper exercise of Congress’ power to regulate activities that substantially affect interstate commerce. In response, the EPA argues that “[o]n its face, CERCLA regulates economic activity and actors: the owners and operators, transporters, and generators responsible for the disposal of hazardous waste, which generally is a byproduct of manufacturing processes, and which often is disposed of as a commercial activity.” Doc. No. 231 at 73.
Olin
applied the reasoning of
Lopez
in holding that CERCLA did not regulate activities that substantially affect interstate commerce.
Olin,
Lopez
reviewed its prior commerce clause jurisprudence, observing that the Court had upheld a wide variety of congressional acts as having substantially affected interstate commerce, including the regulation of intrastate coal mining,
Hodel v. Virginia Surface Mining and Reclamation Assoc.
One of the primary purposes of the Act in question was to increase the market price of wheat and to that end to limit the volume thereof that could affect the market. It can hardly be denied that a factor of such volume and variability as home- *559 consumed wheat would have a substantial influence on price and market conditions. This may arise because being in marketable condition such wheat overhangs the market and, if induced by rising prices, tends to flow into the market and check price increases. But if we assume that it is never marketed, it supplies a need of the man who grew it which would otherwise be reflected by purchases in the open market. Home-grown wheat in this sense competes with wheat in commerce.
Wickard,
Comparing the Agricultural Adjustment Act of 1938 with the Gun-Free Schools act of 1990, the Lopez Court observed that the Gun-Free Schools Act was
a criminal statute that by its terms has nothing to do with ‘commerce’ or any sort of economic enterprise, however broadly one might define those terms. Section 922(q) is not an essential part of a larger regulation of economic activity, in which the regulatory scheme could be undercut unless the intrastate activity were regulated. It cannot, therefore, be sustained under our cases upholding regulations of activities that arise out of or are connected with a commercial transaction, which viewed in the aggregate, substantially affects interstate commerce.
Lopez,
— U.S. at-,
The
Lopez
Court observed that § 933(q) contained “no jurisdictional element which would ensure, through case-by-case inquiry, that the firearm possession in question affects interstate commerce.”
Id.
at-,
The Court recognized that although “Congress normally is not required to make formal findings as to the substantial burdens that an activity has on interstate eom-merce[,]” as part of the Court’s “independent evaluation of constitutionality under the Commerce Clause [the Court] of course consider[s] legislative findings, and indeed even congressional committee findings, regarding effect on interstate commerce.”
Id.
However, neither the statute nor its legislative history contained express congressional findings regarding the effects upon interstate commerce of gun possession in school zones.
Id.
(citations omitted). In the absence of such findings, the Court concluded that the “possession of a gun in a local school zone is in no sense an economic activity that might, through repetition elsewhere, substantially affect any sort of interstate commerce.”
Id.
at-,
In
Olin,
However, the court declined to base its holding on its opinion that “[i]t appears ... that CERCLA generally represents an example of the kind of national police power rejected by
Lopez.'”
Rather, the court ruled that CERCLA failed to meet the second prong of the
Lopez
test — that
it must also be shorn
that the statute has a ‘jurisdictional element which would ensure, through case-by-case inquiry, that the [statute] in question affects interstate commerce.’”
Id.
(quoting
Lopez,
— U.S. at-,
In this Court’s view,
Olin
misconstrues
Lopez. Lopez
does not
require
that a statute contain a “jurisdictional element which would ensure, through case-by-ease inquiry, that the [statute] in question affects interstate commerce.”
Id.
(quoting
Lopez,
— U.S. at -,
In discussing the lack of a jurisdictional element in Lopez, the Court simply did not state or imply that all criminal statutes must have such an element, or that all statutes with such an element would be constitutional, or that any statute without such an element is per se unconstitutional. — U.S. at-,115 S.Ct. at 1631 . Read in context, the Court simply stated that the Gun-Free School Zones Act, unlike the statute in United States v. Bass,404 U.S. 336 ,92 S.Ct. 515 ,30 L.Ed.2d 488 (1971), lacks a jurisdictional element to “ensure” constitutionality, not to fulfill a prerequisite of constitutionality. See Lopez, — U.S. at-,115 S.Ct. at 1631 .
Id.
at 685;
see also Kenney,
Moreover, had such a jurisdictional statement been
required,
the
Lopez
Court’s inquiry regarding the legislative findings related to interstate commerce would have been superfluous; the Court’s analysis would have been at an end once the deficiency was identified.
See Lopez,
— U.S. at-,
This Court also finds unpersuasive
Olin’s
reliance on the argument that CERCLA is a usurpation of the states’ police power to control real property. This argument was explicitly rejected by the Supreme Court in
Hodel v. Virginia Surface Mining and Reclamation Association,
A wealth of precedent attests to congressional authority to displace or pre-empt state laws regulating private activity affecting interstate commerce when these laws conflict with federal law. Moreover, it is clear that the Commerce Clause empowers Congress to prohibit all — and not just inconsistent — state regulation of such activities. Although such congressional enactments obviously curtail or prohibit the States’ prerogatives to make legislative choices respecting subjects the States may consider important, the Supremacy Clause permits no other result.
Id.
at 290,
The
Olin
court’s focus on the intrastate nature of the pollution at issue in that case, which led to the conclusions that the regulated activity was not ‘economic activity’ and that the environmental degradation in that case did not have a substantial effect on interstate commerce, is also misplaced.
See Olin,
[t]he denomination of an activity as a “local” or “intrastate” activity does not resolve the question whether Congress may regulate it under the Commerce Clause. As previously noted, the commerce power “extends to those activities intrastate which so affect interstate commerce, or the exertion of the power of Congress over it, as to make regulation of them appropriate means to the attainment of a legitimate end, the effective execution of the granted power to regulate interstate commerce.”
Id.
at 281,
The EPA argues that the reasoning of
Hodel
is fully applicable to CERCLA. This is correct insofar as
Hodel
stands for the principal that Congress may regulate intrastate activities that cause environmental contamination.
See Hodel,
CERCLA’s legislative history is scant at best. The report of the Committee on Interstate and Foreign Commerce does not contain any specific findings regarding the effect of improper disposal of hazardous waste on interstate commerce. H.R.Rep. No. 96-1016(1), 96th Cong., 2d Sess., reprinted in 1980 U.S.C.C.A.N. 6119. However, the report estimates that it would cost between $13.1 and $22.1 billion to clean up all hazardous waste that poses a danger to public health and the environment. Id. at 20, 1980 U.S.C.C.A.N. at 6123. The report also summarizes the estimates of the cost to individual States of cleaning up specific sites. Id. Furthermore, the report reflects frustration with the EPA’s enforcement of RCRA. The report cites the EPA’s estimate that of the 77.1 billion pounds of hazardous waste produced each year, only ten percent is disposed of in an environmentally sound manner. Id., 1980 U.S.C.C.A.N. at 6124.
*562 The report of the Senate Committee on Environment and Public Works 20 states that releases of hazardous waste have “resulted in the contamination of drinking water and long-term contamination of wells, in massive fish Mils, air pollution, loss of livestock and food products to contaminated drinMng water and feed, and the destruction of wildlife.” Senate Report No. 96-848 at 5, 96th Cong., 2d Sess. The Senate report also observed that “[sjpills have taken place because of transportation accidents involving pipelines, trucks, rail cars, and barges or tankers, and also non-transportation facilities such as storage tanks, holding lagoons and chemical processing plants.” Id. In addition, the report notes that portions of Lakes Ontario and Erie have been closed to commercial fishing because of chemical contamination. Id. at 6.
Through CERCLA’s legislative history, another court addressed the interstate nature of an activity addressed by CERCLA— “midnight dumping”:
Significant among the pervasive industrial practices recognized by Congress is the problem of dumping wastes at improper, illegal or inappropriate sites, and the associated problem of “midnight,” or clandestine dumping of chemical wastes at abandoned, remote or Mdden locations. See, e.g., 1980 U.S.C.C. & A.N. at 6121-22 (describing various practices at selected sites); 126 Cong.Rec. S14,973 (daily ed. Nov. 24 1980) (remarks of Sen. Tsongas) (describing practices of “ ‘midnight dumpers’ who dispose of toxic chemicals and hazardous materials in quarries, in streams, in forests, or spread them on open roads ...”); id. at 14,973 (remarks of Sen. Ford). And, legislators recognized that the problem of “midnight dumping” frequently involves waste that is transported over state lines. See, e.g., 126 Cong.Rec. H9,461 (daily ed. Sept. 23, 1980) (remarks of Rep. Martin) (“because of the nature of clandestine dumping operations [a] State ... wMeh does not generate a large volume of toxic waste, has been victimized as a dumping ground for waste from other States); 126 Cong.Rec. Hll,798 (remarks of Rep. Edgar) (daily ed. Dec. 3, 1980) (“‘midnight dumpers’ [have] trucked wastes from all over the Eastern Seaboard and dumped them illegally at various sites through [Pennsylvania]); 126 Cong.Rec. H9,448 (remarks of Rep. LaFalce) (daily ed. Sept. 23, 1980) (noting interstate scope of problem). This unfortunate history attests to the existence of a vast, unmonitored secondary toxic disposal market — one which, according to CERCLA’s legislative Mstory, weaves across state lines and reaches to every corner of tMs nation.
Violet v. Picillo,
Moreover, the comprehensive nature of CERCLA’s statutory scheme supports tMs conclusion. One of the fundamental deficiencies in the Guns in School Zones Act identified in
Lopez
was that the Act was “not an essential part of a larger regulation of economic activity, in wMch the regulatory scheme could be undercut unless the intrastate activity were regulated.”
Lopez,
—
*563
U.S. at-,
Finally, the Act addressed in
Lopez
was “a criminal statute that by its terms has nothing to do with ‘commerce’ or any sort of economic enterprise, however broadly one might define those terms.”
Lopez,
— U.S. at- -,
For the foregoing reasons, the Court concludes that Congress’ regulation of the improper disposal of hazardous waste under CERCLA is a valid exercise of Congress’ power under the Commerce Clause.
Summary
The Court does not have subject matter jurisdiction to enjoin an ongoing remedial action under CERCLA. Accordingly, the motions for a temporary restraining order and preliminary injunction filed by defendants NL Industries, Inc., Johnson Controls, Inc., AT & T Corporation, Allied-Signal, Inc., Gould Electronics, Inc., and General Battery Company (Doc. No. 218), in which defendant Exide Corporation joins (see Doe. No. 227), and the City of Granite City (Doc. No. 220) are DENIED. In addition, the Court finds that CERCLA’s regulation of the disposal of hazardous waste is a permissible exercise of Congress’ power under the Commerce Clause.
IT IS SO ORDERED.
Notes
. Approximately 350 residential properties have soil lead levels greater than 1000 ppm; another 1000 have levels greater than 500 ppm.
. CERCLA is the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986, 42 U.S.C. §§ 9601-9675.
.A “remedial action” is the implementation of a permanent remedy. 42 U.S.C. § 9601(24). A “removal” is a short-term action taken in response to a release or threat of release of hazardous substances into the environment. 42 U.S.C. § 9601(23). A "response” includes both "remedial actions" and "removal” actions. At issue in this case is the EPA's remedial action at the site.
. The City directs the Court to the jurisdictional argument it presented in its Memorandum submitted in 1994, Doc. No. 131, when the City and the defendants previously sought to enjoin the clean-up. Doc. No. 235 at 6. The matter was resolved — albeit temporarily — before the Court addressed the parties' arguments.
. CERCLA § 105, 42 U.S.C. § 9605, requires the President to "revise and republish the national contingency plan for the removal of oil and hazardous substances, originally prepared and published pursuant to section 1321 of Title 33, to reflect and effectuate the responsibilities and powers created by this chapter....” The revision of the plan is required to include a "national hazardous substance response plan which shall establish procedures and standards for responding to releases of hazardous substances, pollutants, and contaminants, ...: Id.
. In
Employers Insurance,
the defendant waived its argument that the clean-up order was over-broad.
Employers Ins.,
. The City intervened pursuant to CERCLA § 113(i), 42 U.S.C. § 9613(i), which provides:
In any action commenced under this chapter ... in a court of the United States, any person may intervene as a matter of right when such person claims an interest relating to the subject of the action and is so situated that the disposition of the action may, as a practical matter, impair or impede the person’s ability to protect that interest, unless the President or the State shows that the person's interest is adequately represented by existing parties.
As a plaintiff, an intervenor may assert the same procedural and substantive claims that the United States may pursue under CERCLA.
U.S.E.P.A. v. Environmental Waste Control, Inc.,
. The Court will address the propriety of the EPA’s remedy once the Court resolves the issues raised by the instant motions as well as the pending motions for leave to file counterclaims and the parties’ submissions regarding the appropriate scope of review.
. CERCLA § 310, 42 U.S.C. § 9659, which permits citizen suits provides in pertinent part:
Except as provided in subsections (d) and (e) of this section and in section 9613(h) of this title (relating to timing of judicial review), any person may commence a civil action on his own behalf-
(1) against any person (including the United States and any other governmental instrumentality or agency, to the extent permitted by the eleventh amendment to the Constitution) who is alleged to be in violation of any standard, regulation, condition, requirement, or order which has become effective pursuant to this chapter ... or
(2) against the President or any other officer of the United States (including the Administrator of the Environmental Protection Agency and the Administrator of the ATSDR) where there is alleged a failure of the President or of such other officer to perform any act or duty under this chapter ... which is not discretionary with the President or such other officer.
. In
Alabama,
the plaintiffs sought to enjoin the shipment of 40,000 tons of PCB-laden soil from Texas to Alabama. Neither of the district court opinions,
Alabama v. U.S.E.P.A.,
. When the City and the PRPs sought to enjoin the EPA’s clean-up in 1994, they expressed concern that the soil removal operations would increase the risk of exposure due to soil disturbance and resulting dust emissions. As part of the interim settlement agreement, the City and the PRPs were going to conduct an air sampling program at several residential properties while they were undergoing remediation in order to assess the extent of this risk. The materials submitted in support of the motions for injunc-tive relief do not discuss whether such a testing program was conducted or what results that program may have yielded.
. The Court has repeatedly expressed its frustration with the failure of the parties to reach a global settlement that would incorporate remediation of both lead-based paint and lead-contaminated soil. The City and the PRPs made several offers to implement such a scheme, but the EPA claims that such an approach is not logistically feasible.
. Section 104(a)(3) provides:
The President shall not provide for a removal or remedial action under this section in remedial to a release or threat of release—
(B) from products which are part of the structure of, and result in exposure within, residential buddings or business or community structures; ...
. At oral argument it was revealed that a program was being established in conjunction with the Illinois Department of Public Health to assist the residents of Granite City to address the threat posed by lead paint.
. The general rule is that a party seeking a preliminary injunction must demonstrate: (1) that it has no adequate remedy at law and will suffer irreparable harm if preliminary relief is denied; and (2) some likelihood of succeeding on the merits.
Abbott Labs. v. Mead Johnson & Co.,
. Whether liability under CERCLA is retroactive has no bearing on the instant motions. Therefore, the Court will only address the Olin court's discussion of CERCLA’s constitutionality under the Commerce Clause.
. The Court notes that this statement of the issue is too narrow. The issue is not whether the Superfund Site is a channel of commerce or an object that moves through channels of commerce. Rather, the proper focus is on whether the regulated activity — the improper disposal of hazardous waste and its subsequent clean-up— can be regulated under any of the three categories of Lopez and Perez.
. 42 U.S.C. § 9605(c)(2) provides:
In carrying out this subsection, the President shall ensure that the human health risks associated with the contamination or potential contamination (either directly or as a result of the runoff of any hazardous substance or pollutant or contaminant from sites of facilities) of surface water are appropriately assessed where such surface water is, or can be, used for recreational or potable water consumption. In making the assessment required pursuant to the preceding sentence, the President shall take into account the potential migration of any hazardous substance or pollutant or contaminant through such surface water to downstream sources of drinking water.
. 42 U.S.C. § 9618 provides:
For purposes of taking action under section 9604 or 9606 of this title and listing facilities on the National Priorities List, the President shall give a high priority to facilities where the release of hazardous substances or pollutants or contaminants has resulted in the closing of drinking water wells or has contaminated a principal drinking water supply.
. The Senate report accompanied S. 1480. The legislation that eventually became CERCLA was H.R. 7020, which was passed in lieu of S. 1480.
. In addition to determining whether Congress rationally concluded that the activities regulated by CERCLA substantially affect interstate commerce, the Court must also determine whether the regulatory means chosen by Congress are reasonably adapted to a permissible end.
Wilson,