Lead Opinion
Diсo, Inc. (“Dico”) owned several buildings in Des Moines, Iowa, that were under an Environmental Protection Agency (“EPA”) order regulating their use because of hazardous substance contamination. Without informing the EPA, Dico, through its corporate affiliate Titan Tire Corporation (“Titan Tire”), sold the buildings to Southern Iowa Mechanical (“SIM”), which tore them down and stored them in an open field where Polychlorinated Biphe-nyls (“PCBs”) were later found. The government brought this action against Dico to recover damages for its cleanup costs and alleged that Dico violated the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (“CERCLA”) by “arranging] for disposal” of the PCBs in the buildings and also violated the EPA order governing use of the buildings. The district court found Dico liable for both violations, awarded response costs, civil penalties, and punitive damages. On appeal, Dico argues materi
I
In the mid-1970s, the EPA took interest in the Dico buildings at issue in this case because of the presence of trichloroethy-lene (“TCE”) contamination in the groundwater around them. See generally United States v. Dico, Inc.,
Dico and the EPA then agreed on an operation and maintenance plan to address the PCB contamination. Dico submitted a report in 1997 (“1997 Report”), indicating it had completed the required removal. In its report, Dico did not assert that it had removed all PCB contamination and the .author of the report testified that he believed some PCBs remained after the removal action. The EPA approved the 1997 Report but reminded Dico of its continuing obligations under the EPA Order. The operation and maintenance plan required Dico to inspect and maintain the encapsulated surfaces inside the buildings covered by the EPA Order. By 2002, Dico no longer occupied or used the buildings and did not want to continue the required testing under the EPA Order and operation and maintenance plan. The EPA and Dico agreed to discontinue the required testing with the provision that Dico provide annual reports on whether the buildings were back in use, which would again trigger the responsibilities and obligations under the operation and maintenance plan.
In 2007, Dico, through Titan Tire, entered into three separate transactions with SIM: one for the disassembly and removal of the Maintenance Building; one for the western portion of Building 3; and one for the purchase of Buildings 4 and 5 and a northern portion of the Production Building. Dico paid $1.00 per squаre foot to acquire these buildings.
II
We review a district court’s grant of summary judgment de novo, viewing the evidence in the light most favorable to the non-moving party and giving the non-moving party the benefit of all reasonable inferences. Dowell v. Lincoln Cnty., Mo.,
A
CERCLA imposes strict liability for environmental contamination on
any person who by contract, agreement, or otherwise arranged for disposal or treatment, or arranged with a transporter for transport for disposal or treatment, of hazardous substances owned or possessed by such person, by any other party or entity, at any facility or incineration vessel owned or operated by another party оr entity and containing such hazardous substances....
42 U.S.C. § 9607(a)(3) (emphasis added). “Arranger liability ensures that owners of hazardous substances may not free themselves from liability by selling or otherwise transferring a hazardous substance to another party for the purpose of disposal.” Team Enters., LLC v. W. Inv. Real Estate Trust,
The statute does not define the word “arranged.” However, in interpreting this statutory language, the Supreme Court has held the word “‘arrange’ implies action directed to a specific purpose.” Burlington N. & Santa Fe Ry. Co. v. United States,
In the third type of case, “the determination whether an entity is an arranger requires a fact-intensive inquiry that looks beyond the parties’ characterization of the transaction as a ‘disposal’ or a ‘sale’ and seeks to discern whether the arrangement was one Congress intended to fall within the scope of CERCLA’s strict-liability provisions.” Id. In Burlington, the Court specifically rejected the government’s argument that “Congress intended to impose liability on entities not only when they directly dispose of waste products but also when they engage in legitimate sales of hazardous substances knowing that some disposal may occur as a collateral consequence of the sale itself.” Id. at 611-12,
While it is true that in some instances an entity’s knowledge that its product will be leaked, spilled, dumped, or otherwise discarded may provide evidence of the entity’s intent to dispose of its hazardous wastes, knowledge alone is insufficient to prove that an entity “planned for” the disposal, particularly when the disposal occurs as a peripheral result of the legitimate sale of an unused, useful product.
Id. at 612,
The only element of the liability language quoted above Dico disputes on appeal is that it “arranged” for disposal of the PCBs. It argues the buildings had at least some commercial value based on which a fact finder may find Dico did not intend to dispose of the PCBs by selling the buildings to SIM. We agree.
The district court noted the case “exem-plifie[d] the practical difficulties in deciding whether an arrangement is a sale or disposal” but nevertheless concluded that no reasonable fact-finder could concludе Dico did not intend to dispose of the remaining PCBs when it sold the buildings to SIM. See Dico,
In relying on the above cases, the district court improperly focused too closely on the factual similarity between this case and the battery-cracking cases regarding what the buyer was interested in and how it would have to obtain the desired part rather than on the relevant question of the seller’s intent with respect to the transaction. In the battery-cracking cases, the sale product was “junk.” Accordingly, the district courts in those cases could have concluded at summary judgment — consistent with Burlington’s directive that knowledgе of inevitable disposal alone is not enough — that the seller was not selling a product but was intending to rid itself of a hazardous substance by transferring a useless product, where it knew disposal of a hazardous substance was certain. Where, however, the sale product has some commercial value and was part of a legitimate sale, even if the seller knows disposal will result, it is more difficult to hold that no reasonable juror could find the seller did not actually intend to sell the product but merely intended to discard the hazardous substance. See, e.g., Schiavone v. Ne. Utils. Serv. Co., No. 3:08CV429,
The parties before us, and other courts, have framed the issue on what has sometimes been referred to as the “useful product defense.”
The defense prevents a seller of a useful product from being subject to arranger liability, even when the product itself is a hazardous substance that requires future disposal. In other words, a person may be subject to arranger liability “only if the material in question constitutes ‘waste’ rather than a useful product.” A plaintiff can overcome the defense by showing that the substance involved in the transaction “has the*349 characteristic of waste at the time it is delivered to another party.”
The useful product doctrine serves as a convenient proxy for the intent element because of the general presumption that persons selling useful products do so for legitimate business purposes. It would be odd, for example, to say that an auto parts store sells motor oil to car owners for the purpose of disposing of hazardous waste. Conversely, persons selling or otherwise arranging for the transfer of hazardous waste (which no longer serves any useful purpose) are more likely trying to avoid incurring liability that might attach were they to dispose of the hazardous waste themselves. In other words, the probable purpose for entering into such a transaction is to dispose of hazardous waste.
Team Enters.,
As noted above, under the Supreme Court’s definition of “arrange,” the central question is the intent of the seller in the particular transaction. See Team Enters.,
In this case, the considerations above are heavily disputed. First, the cost of remediating the buildings is not clear from the record. The district court noted Dico may have “eliminated a $2.87 million liability” but also noted Dico heavily disputed the inflated figure. On appeal, Dico asserts the $2.87 million figure is a “wild exaggeration” because it fails to take into account the remediation that was already completed, that only some of the buildings were removed while others remained on the property, and that most of the remediation cost would have been to remove any concrete foundations which remained at the Dico property aftеr the disassembly. Since the district court did not make a finding as to how much it would have cost to remove the contamination from the buildings, we cannot determine how much cleanup-cost liability Dico potentially avoided by selling the buildings.
Second, we believe there exists an issue of fact regarding the usefulness of the buildings. Indeed, the district court acknowledged there appeared to be an issue of fact: “On the one hand, there is ample evidence supporting an inference that the buildings were not commercially useful and that SIM purchased them only to extract the valuable steel beams.... On the other hand, the record contains some evidence suggesting that the entire structures were commercially useful.” Dico,
In applying this analysis, the district court toо narrowly focused on the value of the buildings as a whole and what SIM specifically intended to do with them. The fact that SIM planned to only use part of the buildings did not mean that other parties could not use the buildings for other purposes. Similarly, the mere fact that some portion of the buildings could not be reused did not necessarily render them entirely commercially useless. The buildings at the heart of the sale were not hazardous products themselves and the evidence in the record does not support a finding that either Dico or SIM viewed the buildings as merely “waste.” Indeed, SIM had reused one of the buildings it previously purchased from Dico. Even the district court acknowledged there was conflicting evidence on whether SIM intended to reuse the buildings after it disassembled them. See Dico,
Moreover, there is no evidence that Dico itself viewed the buildings as useless. To the contrary, evidence in the record shows Dico continued to view them as commercially useful. Additionally, Dico sold the buildings for more than $140,000 and additional consideration, which the district court stated made it “impossible to calculate the true value of SIM’s bid.” Id. at 1143 n. 6. The insulation appears to be thе only material the parties agree could not be reused after disassembly of the buildings. But we have no clear indication from the record how much the value of the insulation was in comparison to the rest of the building materials. As such, if the insulation represented a relatively minor portion of the value of the buildings, the buildings may still have been commercially useful. Furthermore, contrary to the district court’s finding that the buildings became useless after disassembly, we find the ability to reuse the building components to be a disputed fact. The government relies on several other facts, such as the “commercial reality” of the transaction and Dico’s failure to inform SIM of the contamination, to “suggest” Dico’s intent, but such a showing, while suggestive, is not sufficient to support summary judgment.
In summary, we believe the district court placed too much emphasis on how SIM specifically intended to use, and actually used, the buildings. The fact that some parts from the buildings were worthless after disassembly does not necessarily transform a potentially legitimate sale of the buildings in which Dico would receive some commercial value into a ploy to simply get rid of the buildings just to dispose of thе hazardous substance. Indeed, Dico solicited bids for the sale of the buildings and there was interest beyond just SIM. Overall, unlike cases finding liability at summary judgment, Ave do not believe the evidence of record demonstrates as a matter of law that Dico was merely trying to get rid of a hazardous substance. Thus, under the particular circumstances of this case and on the record before us, we believe the issue of Dico’s intent should not have been decided at summary judgment.
For these reasons, we reverse and vacate the district court’s summary judgment order holding Dico “arranged” for disposal of hazardous materials as a matter of law under § 9607(a)(3). Accordingly, we also vacate the district court’s order Avith respect to any response costs specifically associated Avith the district court’s finding on the issue of “arranger” liability.
The district court awarded both civil penalties and punitive damages against Dico after finding Dico violated Paragraphs 31 and 59 of the EPA Order. Specifically, the district court found Dico had violated Paragraphs 31 and 59 of the EPA Order for 162 days, and awarded $10,000 per day for a total civil penalty of $1,620,000. The district court also аwarded $1,477,787.73 in punitive damages, an amount equal to the “response costs” the Fund incurred by cleaning up the SIM site.
We affirm the district court’s award of civil penalties. However, punitive damages are available only if the Fund incurs costs cleaning up the damage caused by a release or threat of release of hazardous substance. 42 U.S.C. § 9607(c)(3). Because the Fund incurred no costs to clean up the teardown site, the Fund did not incur any costs as a result of Dico’s violation of the EPA Order and therefore the district court erred when it awarded punitive damages based on cleanup costs of the SIM site. Accordingly, we reverse the district court’s award of punitive damages.
1. Civil Penalties
Under CERCHA, “[a]ny person who, without sufficient cause, willfully violates, or fails or refuses to comply with, any [EPA] order ... may ... be fined not more than $25,000
Dico asserts that four factual issues precluded the imposition of civil penalties. We find no triable issues relevant to the civil penalties the district court imposed.
Paragraph 31 of the EPA Order required Dico to submit to the EPA for approval an operation and maintenance plan “presenting] the actions necessary to ensure the protectiveness and integrity of the removal action, including long-term maintenance of all interior surface sealing, encapsulation of all building insulation and appropriate reporting, including, at a minimum, submittal of a written report on an annual basis.” Thus, through the operation and maintenance plan, the EPA Order required Dico to maintain and protect the integrity of the sealing and encapsulation of the building insulation. By allowing for the disassembly of the buildings such that “lots of little pieces of insulation fell to the ground and were blown around,” (undisputed testimony of SIM’s President regarding his observations of the disassem-bly process) Dico necessarily violated the terms of the EPA Order. Its argument that the government failed to show any explicit evidence of the actual release of PCBs through the disassembly process is immaterial to the issue.
Dico argues it should not be subject to penalties because it had “sufficient cause” to violate the EPA Order on two grounds: it reasonably believed (1) no PCBs actually remained in the buildings; and (2) it had been relieved of its obligations. We disagree on both accounts.
First, we find meritless Dico’s argument that it could reasonably believe no PCBs actually remained in the buildings after its initial remediation work in the 1990s. The fact that no PCBs were detected in surface wipe samples of the buildings — which merely tested the effectiveness of the encapsulation — in no way indicated that no PCBs remained within the insulation. To the contrary, the author of Dico’s own 1997 Report, James Fechter, explicitly testified that PCBs remained in the buildings after encapsulation. Moreover, the notion that Dico would agree to such extensive and expensive remediation responsibilities for so many years if it believed no PCBs remained in the buildings seriously belies its litigation position now, particularly in the absence of any evidence it took such a position prior to this litigation.
Second, we reject Dico’s assertion that a September 2003 EPA letter released it from its obligations under the operation and maintenance plan. We do not believe the letter can reasonably be read in such a way. The letter on its face makes no such representation whatsoever and the sentence Dico relies on specifically states that any future demolition of the buildings would be “subject to certain requirements for operation and maintenance.” Furthermore, as the district court explained in its summary judgment order finding a violation of the EPA Order, on at least two occasions after the 2003 EPA letter but before the disassembly began, the EPA reaffirmed to Dico that the obligations under the operation and maintenance plan remained in effect. See United States v. Dico, No. 4:10-cv-00503, Dkt. No. 128, at 36-37 (S.D.Ia. Mar. 6, 2013). Moreover, in its April 17, 2003, letter, Dico expressly stated that it will send the EPA “an annual report ... verifying that the buildings have remained unused” and “[i]f operations resume inside the buildings, Dico will resume the O & M [ (operation and main
Dico’s final argument is that any violation of the EPA Order was merely a onetime violation and not a continuing violation. We agree with the district court that Dico’s argument confuses the basis of its violations. Regardless of Dico’s failure to notify the EPA of the disassembly, its failure to maintain the protection and integrity of the encapsulation continued throughout the disassembly process and constituted a continuing violation. We therefore affirm the award of civil damages.
2. Punitive Damages
42 U.S.C. § 9607(c)(3) allows a court to award punitive damages against a party who “fails without sufficient cause to properly provide removal or remedial action” in response to an EPA order like the 1994 EPA Order. Under this subsection, punitive damages must be “at least equal to, and not more than three times, the amount of any costs incurred .by the Fund as a result of such failure to take proper action.” 42 U.S.C. § 9607(c)(3). The statute gives the district court discretion to award punitive damages within a range,' which is based on a specific dollar amount: the amount the Fund incurred in cleanup costs as a result of the liable party’s failure to comply with the EPA order.
In this case, the Fund incurred cleanup costs at the SIM site, but it did not incur these costs “as a result оf’ Dico’s violation of the EPA Order. As discussed in Part II.B.l above, Dico violated Paragraph 31 when it disassembled the buildings without EPA approval and without protecting the integrity of the sealing and encapsulation of the building, and it violated Paragraph 59 when it failed to notify the EPA of this change in conditions. As a result of these violations, Dico scattered pieces of insulation on the ground at the teardown site. But the Fund did not clean up the pieces of insulation that Dico scattered across the teardown site as a result of these violations. Nor did it perform any cleanup at the teardown site. Rather, the Fund only incurred cleanup costs from “locating the Dico building debris [at the SIM site], conducting sampling at the SIM site, overseeing the SIM cleanup, and enforcing this action for cost recovery and penalties at the SIM site.” Dico,
As discussed in Part II.A, Dico might ultimately be found liable under a theory of arranger liability for its sale of the beams to SIM, but at this point a fact question remains that precludes summary judgment on arranger liability. So too with punitive damages. The cleanup costs at the SIM site derive from Dico’s sale of the beams to SIM. Therefore, since we cannot say as a matter of law Dico is liable for arranging for the disposal of the beams it sold to SIM, nor can we say as a matter of law it is liable (through punitive damages) for the cleanup costs the Fund incurred at the SIM site as a result of the sale of the beams to SIM. Our holding that the district court improperly granted summary judgment on the issue of arranger liability necessarily requires us to reverse the district court’s award of punitive dam
In short, since the Fund did not perform any cleanup at the teardown site, it did not incur any costs “as a result of’ Dico’s violation of the EPA Order, and without cleanup costs Dico cannot be liable for punitive damages under § 9607(c)(3). The district court’s award of punitive damages is vacated and remanded for further proceedings consistent with this opinion.
Ill
For these reasons, we reverse the district court’s summary judgment orders with respect to the issues of “arranger” liability and punitive damages and affirm its orders with respect to the EPA Order violations and civil penalties.
Notes
. Dico also sold SIM a Weld Shop Building, which was disassembled, moved to SIM’s property, and reassembled there. Neither the Weld Shop Building nor the Production Building was subject to the EPA Order.
. Building 1, Building 2, the original section of Building 3, and the southern portion of the
. If "usefulness” is narrowly defined to include only the product’s intended purpose, it is possible that no liability would attach even in the sale of a "useless” product. For example, an entity may sell a "useless” product that carries a different purpose to the buyer— either aesthetic or other functional purpose— such that the seller may receive substantial value for the product, even beyond its commercial value, which could make it a "legitimate sale” without an intention to arrange for its disposal.
. Judge Kelly notes in her cost analysis that comparing the price for which Dico sold the buildings to a reasonable estimate of the cleanup costs compels the conclusion that Dico sold the buildings to avoid the cost of cleanup. While the record contains some evidence Dico may have avoided substantial cleanup costs by selling the buildings, Dico continues to dispute this evidence and the district court did not make a finding of the costs Dico actually avoided by selling the buildings rather than disposing of them. This genuine dispute regarding a material fact precludes summary judgment.
. Indexed for inflation, the penalty amount for the applicable period is $32,500. See 40 C.F.R. § 19.4.
. Judge Loken argues the district court award erred by finding a 162-day violation when there was no actual release of hazardous substances. Paragraph 31 of the EPA Order, however, required Dico to ensure "long term maintenance of all interior surface sealing” and "encapsulation of all building insulation.” Dico violated this Order because it breached the interior surface sealing and
. Dico also implicitly acknowledges it cannot make this showing when it stаtes in its brief that “80 to 90 percent, aná perhaps all, of the PCBs that once may have existed in the insulation of those buildings had been removed by 1997.” (emphasis added).
Concurrence Opinion
concurring in part and dissenting in part.
I concur in Parts II.A. and II.B.2. of Judge Bye’s opinion. I also agree that Dico is subject to an award of civil penalties for willful violation of an administrative order but would remand for redeter-mination of the amount of the penalties and therefore respectfully dissent in part from Part II.B.l.
A. Arranger Liability. I join Part II.A. of Judge Bye’s opinion but add the following to clarify my interpretation of the Supreme Court’s controlling decision in Burlington N. & Santa Fe Ry. v. United States,
In Burlington Northern, after a six-week bench trial, the district court concluded that Shell Oil Company was liable as an arranger for selling hazardous chemicals to a “sloppy” distributor, knowing there would be leaks and spills in the delivery and storage process. Id. at 605,
cases in which the seller has some knowledge of the buyers’ planned disposal or whose motives for the “sale” of a hazardous substance are less than clear. In such cases ... determining] whether an entity is an arranger requires a fact-intensive inquiry that looks beyond the parties’ characterization as a “disposal” or a “sale” and seeks to discern whether the arrangement was one Congress intended to fall within the scope of CERCLA’s strict-liability provisions.
Id. at 609-10,
In order to qualify as an arranger, Shell must have entered into the sale of D-D with the intention that at least a portion of the product be disposed of during the transfer process by one or more of the methods described in § 6903(3).... [T]he evidence does not support an inference that Shell intended such spills to occur.... Shell’s mere knowledge that spills and leaks continuеd to occur is insufficient. Id. at 612-13,129 S.Ct. 1870 (emphasis added).
Anytime an entity sells a product that contains a hazardous substance, it also intends to rid itself of that hazardous substance in some metaphysical sense.But intent to sell a product that happens to contain a hazardous substance is not equivalent to intent to dispose of a hazardous substance under CERCLA. For arranger liability to attach [under Burlington Northern ], there must be something more.
Consol. Coal Co. v. Ga. Power Co.,
Despite acknowledging numerous fact disputes, the district court granted summary judgment for plaintiff United States because “no reasonable fact-finder could conclude that ... [Dico] did not intend to dispose of the remaining PCB when they sold the buildings to SIM,” and “no reasonable fact-finder could conclude that the buildings at issue were commercially useful.” United States v. Dico, Inc.,
I am somewhat concerned that Judge Bye’s opiniоn places too much emphasis on the analysis of arranger liability in pre-Burlington Northern cases. In my view, the earlier “battery cracking” cases should be disregarded, not distinguished. Even if those decisions were sound, the analysis was inconsistent with the Supreme Court’s in Burlington Northern. Likewise, the pre-Burlington Northern “useful product” doctrine, which the Ninth Circuit has continued to apply, was not adopted by the Supreme Court in Burlington Northern. Rather, the Court expressly put in the middle category of cases requiring fact-intensive inquiry those “in which the seller has some knowledge of the buyers’ planned disposal or whose motives for the sale of a hazardous substance are less than clear.”
Most of the cases in which our sister circuits developed what might be called multi-factor tests involved appeals from the grant of summary judgment imposing or denying arranger liability. See, e.g., Consol. Coal,
In determining the аmount of any penalty assessed ... the President shall take into account the nature, circumstances, extent and gravity of the violation or violations and, with respect to the violator, ability to pay, any prior history of such violations, the degree of culpability, economic benefit or savings (if any) resulting from the violation, and such other matters as justice may require.
42 U.S.C. § 9609(a)(3); cf. 33 U.S.C. § 1319(d) (mandating nearly identical standards when a court determines the amount of civil penalties to impose for violation of an EPA compliance order issued under the Clean Water Act).
The district court concluded as a matter of law that Dico violated two paragraphs of the 1994 administrative order for 162 days, the time it took to complete disassembly of the buildings on the Dico property — paragraph 31, which required Dico to implement a Maintenance Plan that included “long term ... encapsulation of all building insulation,” and paragraph 59, which required Dico to “immediately notify EPA’s designated Project Coordinator” if any “change in site conditions, during the action conducted pursuant to this Order causes or threatens to cause an additional releasе of hazardous substances from the Dico Property.” After a bench trial to determine the amount of civil penalties and punitive damages, the court assessed penalties of $10,000 per day for 162 days, a total of $1,622,000.00.
I agree with my colleagues that the record established at least a one-day violation of paragraph 59 for Dico’s willful failure to notify EPA before it demolished or disassembled the buildings in 2007. That was a change in site conditions that threatened the release of any PCBs that remained in insulation that was not destroyed during the primary site clean-up completed in 1997. See All Regions Chem. Labs, Inc. v. EPA,
The EPA does not necessarily object to demolition of the buildings, but urges Dico to coordinate any plans for demolition of the buildings with EPA. Certain disposal requirements may apply for building debris, and the EPA or state would want to oversee the demolition.
Demolition of the buildings would necessarily end permanent encapsulation of
The dominant purposes of CERCLA, and therefore the administrative order in question, are to prevent the release of hazardous substances and to take appropriate remedial action when releases have occurred. See 42 U.S.C. §§ 9604, 9606(a). Thus, Dico’s failure to give timely notice of a change in site conditions that threatened a release of the encapsulated insulation was clearly at least a one-day violation. But disassembling the buildings at the site for 162 days was not even arguably a 162-day violation if there was no actual release of hazardous substances during that activity. The district court granted summary judgment that a 162-day violation had occurred because reports from the 1990’s established that “demolishing the buildings necessarily resulted in a release of PCB.” Dico,
In determining the amount of civil penalties to assess, the district court stated that “discussing the evidence concerning PCB concentration is unnecessary in this case.” Id. at 1064 n. 40. In my view, this was an erroneous interpretation of § 9609(a)(3) and therefore an abuse of the court’s discretion in determining the amount of civil penalties. The court also observed that “Dico created another Superfund site (the SIM site in Ottumwa, Iowa), thus causing the EPA to spend Superfund money in investigating the PCB release at the SIM site.” Id. at 1064. I agree that if, in fact, Dico’s actions in disassembling the buildings without notice to EPA resulted in the transfer of PCB-contaminated steel beams that proximately caused the release of hazardous substances at the SIM site, that would be highly relevant in determining the amount of civil penalties to assess for Dico’s violation of the 1994 administrative order. But that question turns on disputed issues of material fact that have led us to reverse the grant of summary judgment holding Dico liable as an arranger for response costs at the separate SIM CERCLA site.
A massive civil penalty may not be assessed unless it is warranted by the “extent and gravity of the violation.” § 9609(a)(3). Accordingly, I would remand for a redetermination of the amount of civil penalties that should be assessed.
Concurrence Opinion
concurring in part and dissenting in part.
I agree with the court’s decision to affirm the summary judgment order with respect to the EPA order violation and civil penalties. I disagree that the district court erred in granting summary judgment on the question of arranger liability, and therefore with this court’s decision to reverse the district court’s award of punitive damages on that basis. Therefore, I respectfully dissent from Part II.A of the court’s opinion and the portions of Part II.B that discuss punitive damages.
' According to Burlington Northern, “[i]n order to qualify as an arranger, [Dico]
As the court notes, other circuits have developed multi-factor tests that are useful in determining whether a given transaction qualifies as an arrangement for disposal. The Fourth Circuit has outlined the following four relevant, and helpful, factors:
the intent of the parties to the contract as to whether the materials were to be reused entirely or reclaimed and then reused, [2] the value of the materials sold, [3] the usefulness of the materials in the condition in which they were sold, and [4] the state of the product at the time of transferral (was the hazardous material contained or leaking/loose).
Consol. Coal Co. v. Ga. Power Co.,
The first factor is the “intent of the parties to the contract as to whether the materials were to be reused entirely or reclaimed and then reused.” Id. According to the testimony of Jim Hughes, president of SIM, SIM only ever intended to buy the beams. And according to Hughes’s testimony, Dico was aware of SIM’s intent. Hughes testified that prior to the sale he told Dico consultant and former employee Don Brown “that SIM wanted to buy only the steel beams from the buildings” and that they had discussed “the need to discard other building components.” Hughes testified that during the dismantling process “lots of little pieces of insulation fell on the ground and were blown around,” that the “insulation was being loaded into Waste Management Inc. dumpsters for disposal,” and that Brown was on-site during these activities.
Defendants’ own Statement of Additional Material Facts states that when he sold the building to SIM, Titan Tire president Bill Campbell “believed that Titan Tire, on behalf of Dico, was selling a commercially useful product — being the steel beams — for a reasonable value, inasmuch as it was his understanding that SIM intended to reassemble the steel beams on its property in Ottumwa for use in its business operations.” (Emphases added.) It was “the intent of the parties to the contract” that the beams would be “reclaimed and then reused,” not that the buildings would be reused in their “entirety.” In fact, there was testimony from defendants’ own witness that “it doesn’t make sense” to re-use insulation and that he had never seen it done in forty years of demolition experience. The contract itself instructed SIM to “demo” (demolish) the buildings. Cf. Pneumo Abex Corp. v. High Point, Thom-asville and Denton R.R. Co.,
A second relevant factor is the “value of the material sold.” Consol. Coal,
Most notably in this cost analysis, SIM was never informed that the buildings contained PCBs, and SIM’s president testified that this information would have affected his estimation of the value of the property. PCB-contaminated beams are worth less than PCB-free beams, and SIM assumed it was purchasing the latter, not the former. Dico presented no evidence even to suggest that it took any precautionary steps to ensure any possible contamination was containеd prior to or during the dismantling process. Cf. Consol. Coal,
The third factor of the Fourth Circuit’s test is “the usefulness of the materials in the condition in which they were sold.” Consol. Coal,
The 'fourth factor is “the state of the product at the time of transferral (was the hazardous material contained or leaking/loose).” Consol. Coal,
Taken together, these factors support the conclusion that Dico intended to dispose of the PCB-laden insulation contained within its buildings. Hughes testified that he was told Dico “wanted the buildings torn down to аccommodate” a “large development project.” The fact that Dico was able to receive a sum of money for the beams contained within the buildings does not negate the fact that they wanted the buildings, and their PCB-contaminated insulation, gone.
Knowledge alone is insufficient to find that a party had the intent to arrange for disposal. Burlington N.,
. Prior to the transaction presently at issue, SIM had bought a similar building from Dico — one not covered by the 1994 UAO — and this building had been dismantled and its insulation disposed of in the same fashion.
. The court distinguishes the "battery-cracking” cases and the copper wire case by saying
. I agree with the court’s conclusion in Part II.B that Dico could not have reasonably believed no PCBs remained in the buildings.
