240 F. 217 | D. Colo. | 1916
The defendant owns and operates an hydro-electric plant in Garfield County. It consists of a dam which diverts the waters from Grand river into a tunnel excavated through solid rock, a pressure pipe which receives the flow at the lower end of the tunnel, extending thence to the power house where the electric current is generated, and, in addition to the power house, several other buildings nearby used in connection with operating the plant.
All of the property and plant, except a part of the diverting dam, is situate on the public domain. The country is rugged and mountainous, and the distance from the dam to the power house is about two and a half miles through a deep cañón, having high precipitous and barren walls on either side of the river.
The bill seeks to have the entire plant and appurtenant structures removed as a purpresture and public nuisance, on the claim that it is on the complainant’s lands without present right. It discloses that the defendant went in and constructed the plant under a permit granted to one De Remer and associates by the Secretary of the Interior on August 20, 1903, under the Act of-February 15, 1901 (31 Stat. 790); that thereafter in January, 1907, the rights of De Remer and associates were transferred, with the acquiescence and consent of the Secretary of the Interior, to the defendant, or its predecessor, and that thereafter in 1909 the Secretary of the Interior and the Secretary of Agriculture canceled and revoked the permit.
Some basis for the action of the two secretaries is claimed on account of the fact that, as it is alleged, the defendant did not keep the letter of the De Remer permit in constructing a tunnel for the flow rather than carrying the water in an open ditch, and further because the line of the tunnel departed from that of the open ditch, both disclosed on the map presented to the land office with the De Remer application; but this claim seems to be more of form thán substance.
The pleadings do not disclose the real cause of the controversy. Aft-ejr the plant was completed at great expense the Secretary claimed the right, under the said Act of February 15, 1901, to impose certain sums as annual charges against the defendant, based upon the amount of current generated. The exaction was not to the defendant’s liking; it not only refused to pay, but denied the right of the Secretary to make the charge. Its attitude is twofold: First, lack of authority under the Act of February, 1901, to require payment; and, second, the assertion by the defendant that its right to remain upon the premises and operate its plant was not measured by the Act of February, 1901, but that it had acquired a perpetual easement under the Act of July 26, 1866 (14 Stat. 251, c. 262) and the Act of July 9, 1870 (16 Stat. 217, c. 235), and further that said two mentioned Acts, read and considered in connection with the Act of February, 1901, and other acts treating generally of the same subject-matter, gave to the defendant more than a revocable permit and that it was not subject to the exaction. This attitude brought about the alleged cancellation of the permit theretofore issued.^
“The use of the right of way shown on this map is hereby permitted in accordance with the provisions of the Act of February 15,1901 — 31 Stat. 790 — ■ and the regulations present or future thereunder.”
After De Remer and associates had spent'several thousand dollars on tire venture under the permission thus given them, the defendant’s predecessor took over, with the consent and approval of the Secretary, the rights theretofore given, and the plant was thereupon with reasonable diligence completed.
There wás not only no claim under any other statute to occupy complainant’s premises, but the express understanding and agreement at the time was that the only right claimed was that granted by the Act of February, 1901; nor was any claim or right asserted under any other statute, so far as the record shows, until long after the completion of the plant.
“And Provided further, That any permission given by the Secretary of the Interior under the provisions of this Act may be revoked by him or by his successor in his discretion, and shall, not be held to confer any right, or easement, or interest in, to, or over any public land, reservation, or park.”
The statute is clear. The defendant never had more than a revocable permit.
An order nisi will be entered giving the defendant sixty days in which to make payment in compliance with the demands of the Secretary, failing in which a decree will then be entered as prayed in the bill.
It is so ordered.