21 Ariz. 172 | Ariz. | 1920
At various dates dur- ■ ing the year 1916 the superintendent of the streets of the city of Phoenix, Arizona, entered into four separate contracts with the California-Arizona Construction Company, hereinafter called the Construction Company, for the improvement of certain streets of that city. These contracts were made pursuant to the provisions of the Improvement Act of 1912 (chapter 13, tit. 7, Rev. Stats. Ariz. [Civ. Code] 1913), and were made after the proceedings provided by that act were regularly had by the municipal authorities. As required by paragraph 1962, Revised Statutes of 1913, the Construction Company executed, in connection with each of the contracts and filed with the superintendent of streets, a bond conditioned for the faithful performance of the contract, and also a bond for the payment of materials furnished. or work and labor done for the improvement specified in the contract. Each of these bonds was executed by the Construction Company as principal and the United States Fidelity & Guaranty Company, hereinafter called the Surety Company, as surety. The Construction Company entered upon the performance of the several contracts and subsequently completed the making of the several im
Among the claimants who appeared and answered were the Bennett Lumber Company, the Phoenix-Tempe Stone Company, the Warren Bros. Company, and the Barrett Company. The judgment of the court disallowed and rejected the claim of the Bennett Lumber Company, and adjudged that each of the other claimants mentioned recover a specified amount from the Surety Company.
From the judgment of the trial court the Elliott & Horne Company and the Citizens’ National Bank, intervener, appealed to this court. The Bennett Lumber Company appealed from the judgment against it, and the Surety Company separately appealed from .each judgment in favor of the other claimants above mentioned. Each of these appeals was separately docketed, but, as they are all appeals from portions of the same judgment and to some extent involve the same questions, they will, so far as they are now before the court, be disposed of in one opinion.
In view of the disposition of the appeals taken by the Elliott & Horne Company and the Citizens’ National Bank, no more extended statement of the facts
The action is one which finds many precedents in the reported cases. The Surety Company, finding itself liable or to become liable for the debts of its principals, seeks to subject the proceeds of the ’contracts out of which the contract of suretyship arose to the payment of the debts of the principal, or seeks subrogation to the rights of the creditors of the principal. Inasmuch as it may not be advised as to the extent of its liability or the existence of the right of recovery on the part of those claiming that it is liable as surety, it makes all such claimants parties for the purpose of determining the extent of its liability, and to avoid a multiplicity of suits upon the bonds, upon which it became surety. In -such cáse
Claim of the Bennett Lumber Company.
This company filed its claim with the superintendent of streets, asserting that it had furnished lumber to the Construction Company for use in carrying out one of the contracts. The fact found by the court below with respect to this claim wa's as follows:
“At the request of the superintendent of the Construction Company, the Bennett Lumber Company sold and delivered to the Construction Company upon the ground where the work under said contract was being performed new lumber for the use of said Construction Company in executing said contract No. 28. The use to which said lumber was put by the Construction Company was the laying down of said lumber upon the street being improved under said contract and the mixing of materials thereon used in the construction of the street. In and by such use the lumber in question was not thereafter merchantable lumber, and after the completion of the contract the lumber in question not destroyed or rendered worthless by use was taken away by the Construction Company.”
Turning to the evidence respecting the use to which this lumber was put, it was shown by testimony not contradicted that the lumber furnished was 2x12 boards which were laid on the dirt after it was rolled and ready for the pavement; the material was then put on the boards to keep it out of the dirt, and as the work progressed the boards were moved ahead of the work, and the operation was repeated until the work was finished. After the completion of the work the boards were taken up and removed to the yard of the contractor to be used, in the language of one of the witnesses, “on the^next job that comes along.” To some extent this lumber was broken and rendered unfit for use, but to what extent that condi
The statute under which the bond was given (paragraph 1962, Eevised Statutes of 1913) provides that the bond shall be conditioned that, “if the contractor to whom said contract was awarded, or any assign of his, fails to pay for any materials so furnished for the said improvement, or for any work or labor done thereon of any kind, the sureties will pay the same to an amount not exceeding the sum specified in said bond.” The conditions of the .bond under which the Lumber Company asserts its claim follow this provision of the statute. The question is, therefore, whether the materials furnished by the Lumber Company as above stated were such as to come within the conditions of the bond. It is urged by the Lumber Company that a contract of a surety company is, under our statutes, an insurance contract, and should therefore, be most strongly construed against the insurer. Granting this, a contract of insurance, like any other contract, must receive reasonable construction, and while insurance contracts are construed most favorably to the insured where the meaning of the language is doubtful, there is no occasion for the application of this rule when the language has acquired by judicial construction a clear, definite meaning. It is well settled that the
“This provision cannot be construed to cover and include the tools or plant purchased by the contractor, the use of which is required in doing the work, and which, barring wear and tear incident to such use, survive for such repeated and other use. . . . Indebtedness incurred by a contractor in the purchase of his plant or any part thereof, the use of which is required in doing the work, is not within the provisions of the act, nor included in the terms of the bond.” Sherman v. American Surety Co. of New York, 178 Cal. 286, 173 Pac. 161.
*185 “Appliances are, generally speaking, things which are expected to be nsed again and again. They are in effect tools. Appreciably diminishing perhaps > in usefulness with the wear and tear of each building contract in which they are used, they, still cannot be said to be materials furnished ‘for or in or about’ the erection of any given structure, although after being used in the building of many structures they finally go to the junk heap.” Barker & Stewart Lumber Co. v. Marathon Paper Mills Co., 146 Wis. 12, 36 L. R. A. (N. S.) 875, 130 N. W. 866.
“Tools, ‘implements, and appliances used by the contractor in the prosecution of the work are not materials used therein in any reasonable sense of the term. If a pick, shovel, pair of boots, hoisting rope or any other implement, tool or appliance used by the contractor on the work is worn out or broken, it does not follow' that such article thus becomes material used therein within the meaning of the contract. The contract presupposes that the contractor will furnish, upon his own account, the necessary tools, implements and appliances with which to perform the work.” Kansas City v. Youmans, 213 Mo. 151, 112 S. W. 225.
See, also, American Surety Co. v. Lawrenceville Cement Co. (C. C.), 110 Fed. 717 National Surety Co. v. United States, 228 Fed. 577, L. R. A. 1917A, 336, 143 C. C. A. 99; United States Rubber Co. v. American Bonding Co., 86 Wash. 180, L. R. A. 1915F, 951, 149 Pac. 706.
If, therefore, the materials furnished by the Lumber Company were mere appliances for use in performing the work, they became a part of the contractor’s equipment, and not materials to be used in the performance of the work within the meaning of the statute or the terms of the bond.
It is well settled that actual physical incorporation in the structure erected or improvement made is not necessary in order to constitute the articles furnished “materials furnished in the performance of the work.” It has many times been held that ex
“In these cases the liens have been granted upon one general principle or idea, namely, that where the material is used directly upon the work or structure itself, instrumental in producing the final result, and is actually consumed in the use, it may be said that in every true sense it has entered into and forms a part of the completed structure.” Barker & Stewart Lumber Co. v. Marathon Paper Mills Co., supra.
So it has been held in some cases that lumber used in the making of concrete forms comes within the meaning of the word “material,” and, relying upon this class of cases,, the Lumber Company urges that its claim comes within the rule as stated in Chicago Lumber Co. v. Douglas, 89 Kan. 308, 44 L. K. A. (N. S.) 843, 131 Pac. 563, and Alexander Lumber Co. v. Farmer, 272 Ill. 264, 111 N. E. 1012. In each of these cases, however, the lumber used was either totally or substantially destroyed in the performance of the work, or was left in and became in effect a part of the work. This matter of destruction of the material seems to be an important consideration in determining whether the article furnished can be deemed material furnished for the performance of the work. In Road Supply & Metal Co. v. Kansas Casualty & Surety Co., 103 Kan. 125, 175 Pac. 108, it was held, citing Chicago Lumber Co. v. Douglas, supra, that the right of recovery depended upon the question whether or not the material was used in the sense of substantially consumed, and it was said:
“The plaintiff may recover for whatever material was actually used, but may not recover for mate*187 rial which, although damaged and reduced in value, actually formed a part of the contractor’s equipment when he engaged in building another bridge.”
In B. F. Avery & Sons v. Woodruff, 144 Ky. 227, 36 L. R. A. (N. S.) 866, 137 S. W. 1088, it is said:
“If the lumber had been furnished to make a scaffold, molds or forms with the intention of using them in the erection of that building and then carry them away and use them in constructing other buildings, then no lien would attach, as they would be regarded as a part of the appliances of the workmen and would occupy the same place as a hammer, saw or other tool used by the workmen.”
And later, in the same opinion, it is said, in discussing a former decision of the same court in which it was held that lumber used in making concrete forms was not lienable:
“But that case is unlike this one, as there was nothing in that one to show that the lumber was destroyed or consumed in the erection of the building; it might have been used in erecting other buildings.”
Doubtless, as contended by counsel for the Lumber Company, there is a distinction between the statutes giving mechanics’ or materialmen’s liens and statutes requiring the giving of bonds of the character involved in this case, and the latter statutes and the conditions of the bonds given under them are to be more liberally construed than .mechanic’s lien statutes. Sherman v. American Surety Co., supra. But, according to the great weight of authority, regardless of any greater liberality of construction of statutes like the one here involved, the term “materials furnished in the performance of the work” cannot be held to include equipment or appliances used in the carrying out of the work done.
In this case the lumber in question did not enter into the physical construction of the improvement. It was not consumed in the making of the improve
“If the cofferdam in the present case, though constructed specially for the building of the dam in question, was capable of and intended to be removed and used in building like structures elsewhere, even though suffering serious deterioration each time, and susceptible of use but a few times, it might well be held to be an appliance or part of the contractor’s equipment.” Barker & Stewart Lumber Co. v. Marathon Paper Mills Co., supra.
In this case, therefore, it must be held that the lumber furnished by this claimant was not “materials furnished in the performance of the work,” within the meaning of that expression as used in the contract and bond, but was a part of the contractor’s equipment or an appliance used by the contractor for performing the work, and hence the court below properly denied the claim. The judgment as to this claim is affirmed.
Claim of Warren Bros. Company.
Warren Bros. Company filed with the superintendent of streets a verified statement of its claim against the bond given on each of three of the contracts before . referred to. The claims were for the services of an inspector who performed certain
Undoubtedly, if a strict construction is to be given to the term “material,” a charge of this character cannot be justified. Some of the authorities — not, however, the more recent ones — strictly construe the term, possibly because of the tendency of some courts to apply in this class of cases the rules applicable to cases arising under mechanic’s or material-men’s lien statutes. The tendency in recent years, however, has been to give a liberal construction to the terms “material” and “labor.” In the federal courts such liberality of construction is the settled rule since the decision in Brogan v. National Surety Co., 246 U. S. 257, L. R. A. 1918D, 766, 62 L. Ed. 703, 38 Sup. Ct. Rep. 250. The California courts, considering statutes similar to ours, have given a broad and liberal construction to the term “materials.” Sherman v. American Surety Co., 178 Cal. 286, 173 Pac. 161; Bricker v. Rollins, 178 Cal. 347, 173 Pac. 592; Pacific Wood & Coal Co. v. Oswald, 179 Cal. 712, 178 Pac. 854. While no case has been cited directly covering a charge of the kind involved in this case, nor has our investigation disclosed any, we think that the word “materials,” as used in the Improvement Act of 1912 and in a bond given under that act, is broad enough to include this charge.
The right of a patentee or owner of a patent to charge a reasonable royalty or license fee for the use of a patented material or process cannot be questioned. Without procuring from the patentee or owner of the patent the right to use such material or process, there can be no lawful use thereof. The statute (paragraph 1974, Revised Statutes of 1913) expressly authorizes the use of patented material. The right to use the patented material or process is as essential to the carrying out of the contract as the
It is asserted by the appellant that the claim of the Warren Bros. Company is based upon a contract which is void as contravening public policy, for the reason that, as it is said:
“The Warren Bros. Company had an understanding with the Construction Company as to the right to use its process upon payment of a royalty or license charge of twenty cents per square yard when the usual charge was twenty-five cents, and no similar understanding was had with any other contractor desiring to bid upon the work.”
It is more than doubtful if this assertion is covered by any assignment of error. But, passing that, the contention appears to be without merit. The specifications of the work to be done under the several contracts call for bitulithic paving. In those specifications it is provided that Warren Bros. Company, the owner of the patents used in the construction of that character of pavement, should file- an agreement to furnish any contractor desiring to bid for the work all the necessary material at a definite and reasonable price per square yard, which price should include a license to use the patents required in the construction of the pavement. It appears that such agreement was not actually filed. No one, however, appears to have been injured or prejudiced by the failure to file such agreement. Neither the city nor the property owners, who must ultimately pay the cost of the improvement, are making any complaint. The amount which the Surety Company is required to pay is less than the usual charge, or the charge
The second assignment' of error is that' the court erred in allowing • interest on the amount of the claims from the date of their filing with the superintendent of streets, for the reason that such claims were not capable of definite ascertainment as to validity or amount until the rendition of judgment, and that interest should only have been allowed from the date of the rendition of the judgment. In the claims and in the pleading of Warren Bros. Company recovery was sought on the basis of a charge of twenty-five cents per square yard. At the close of the evidence it was agreed by counsel for the Warren Bros. Company that judgment should be rendered for only twenty cents per square yard, and the latter amount was made the basis of the judgment rendered. The adjudicated cases present a bewildering variety of rulings with respect to the time from which interest should be computed. The statutes of this state regulate only the rate of interest and are silent as to the time from which it is to be allowed. Both the validity and the amount of the claims in this case were disputed by the Surety Company. It is apparent, therefore, that this is not a case where the amount of the recovery, if recovery be had, was definitely fixed by agreement of the parties or capable of ascertainment by mere com
In this case the date when the claimant was made a party to the action should be deemed the commencement of the action and the time from which interest should be computed, which from the records appears to be March 28, 1917. The judgment should therefore be modified so as to allow interest only from March 28, 1917, and as modified affirmed, with costs to the appellee.
Claim of Phoenix-Tempe Stone Company.
The Phoenix-Tempe Stone Company, hereinafter called the Stone Company, filed its claim for rock furnished for the Construction Company in the making of c'ertain of the improvements and carrying out certain of the contracts. The Stone Company recovered judgment in the court below against the Surety Company, and the latter appealed. The claim of the Stone Company is based upon the terms of an instrument in writing, dated April 28, 1916, whereby the Stone Company leases to the Construction Company a tract of land for the term of one year, “the lessee agreeing to use reasonable effort to quarry the stone therein during the period of the lease, and that it will pay as rent for said premises the sum of eight cents per ton for each ton of stone quarried and removed from said premises. The minimum rental shall be $100; accounts to be kept
“The Surety Company bound itself to pay for these materials, and it should not be relieved therefrom on any finespun theory that because some third party did not rent the quarry and buy the dynamite and the coal, and hire the machinery and make an aggregate charge of all these items of expense with a fair profit thereon, and present a bill for the*195 materials thus produced, it should be wholly relieved from payment of any sum whatsoever for such materials.’’ Shannon v. Abrams, 98 Kan. 26, Ann. Cas. 1918E, 502, 157 Pac. 449.
The Surety Company asserted that the title to the property from which the stone was taken was in the Arizona Eastern Railroad Company, or at least that the railroad company claimed title to such property, and much testimony was produced on this question. The railroad company is not a party to this action, never filed any claim with ‘the superintendent of streets, and has never appeared or made any claim with respect to the stone furnished the Construction Company. The Surety Company is liable only to those creditors whose claims have been properly filed. It cannot act as the self-constituted champion of the rights of the railroad company, nor claim that it was not liable on its bond because there is a controversy with the railroad company with respect to the title of the land on which the stone quarry is located. The Surety Company cannot be held liable to the railroad company, and in view of the fact that the Construction Company was in no way interfered with while removing the stone, and no claim thereto by the railroad company was made, the Surety Company cannot escape liability by reason of any supposed rights of the railroad company.
The Surety Company contends further that it is not liable for the stone used in one of the improvements designated as' the West Washington Street improvement, for the reason that the Stone Company failed to file its claim with the superintendent of streets within thirty days after the completion of the improvement. The statute provides that:
“Any . : . person . . . furnishing materials ... or who performed work or labor . . . may within thirty days from the time said improvement is completed, file with the superintendent of streets a verified state*196 ment of Ms or its claim, together with a statement that the same, or some part thereof, has not been paid.” Paragraph 1962, Rev. Stats. 1913.
The filing of a claim within the time provided by law is necessary under this statute in order to recover upon the bond. The facts upon which the contention of the Surety Company is based are these: The superintendent of streets testified that the improvement was completed November 4, 1916, and on the fourteenth day of November, 1916, he made the assessment provided by paragraph 1964, Revised Statutes of 1913, and issued the warrant provided by that statute, and thereupon notified the legislative body of the municipality, the city commission of the city of Phoenix, of the recording of the assessment and warrant. The city commission thereupon fixed the thirteenth day of December, 1916, as the time when it would hear and pass upon the assessment and the proceedings theretofore had and taken. On December 12, 19Í6, the M. H. Sherman Investment Company filed with the city clerk an instrument in writing which, after complaining of the amount of the assessment levied against the property of that company and expressing disappointment with the character of pavement laid on West Washington Street, proceeds:
'“And, according to our judgment, the work is not what it should be, and we ask that you give the above protest consideration. ’ ’
At the hearing on December 20, 1916, the date to which it had been adjourned, the city commission found that the work had'not been fully completed in accordance with the plans and specifications, and thereupon suspended the assessment until such time as in the opinion of the commission the work should be fully completed. Thereafter further work was done upon the improvement, and on March 21, 1917,
The time of the completion of an improvement under the statute here involved is not the time of the actual cessation of work, but the time when the municipal authority having jurisdiction to finally pass upon the question declares it to have been completed and accepts the work. Such an acceptance of the work and such fixing of the time of its completion is binding upon the parties to the contract, and is also binding upon a materialman or laborer seeking recovery upon the bond. Denny-Renton Clay & Coal Co. v. National Surety Co., 93 Wash. 103, 160 Pac. 1; California Portland Cement Co. v. Boone, 181 Cal. 35, 183 Pac. 447. Under the rule as laid down by these authorities, the time fixed by the city commission as the date of the completion of the work is binding upon all parties if the commission had jurisdiction to consider the matter and make such a finding.
The claim of the Stone Company was filed on January 29, 1917. This was prior to the completion of the work as determined by the city commission, but such a claim may be filed at any time before the contract is completed. French v. Powell, 135 Cal. 636, 68 Pac. 92. If the city commission acted within its jurisdiction in determining the completion of the
The Improvement Act' of 1912 (chapter 13, title 7, Revised Statutes of 1913), was modeled after the so-called Vrooman Act (Stats. 1885, pp. 160, 161, amended by Stats. 1891, p. 206, and Stats. 1893, p. 172) and the Improvement Act of 1911 of the state of California (Stat's. 1911, p. 730). Indeed, in many respects the Arizona act is but a copy of or closely follows the California statutes. But the framers of the Arizona act departed in some respects from the language of the California statutes, and particularly that portion of the act respecting the review by the legislative body of the city of the acts of the superintendent of streets in accepting the work as completed and in issuing the assessment and warrant. The Vrooman Act and the 1911 Improvement Act of California provide, as does the Arizona statute, for an appeal by any person interested from the action of the superintendent of streets to the city council or legislative body of the city. In both the California statutes it is provided that an appeal shall be taken by the interested parties by briefly stating their objections in writing and filing the same with the clerk of said city council. Page on California Street Laws, 1001 and 1035. The Arizona statute provides that the parties desiring to appeal shall file a written notice briefly specifying the grounds of their objections. The language of the Arizona statute is not materially different from that of the California statutes, and in construing it the decisionsof the courts of the last-named state are extremely persuasive. It has been held in California that the written objection, in .order to constitute an appeal, need not state that the party appeals and need not particularize as to the respects in which they claim that the contract has not been performed. It is
Applying this liberal rule, it must be held in this case that the language of the protest, “according to our judgment the work is not what it should be, and we ask that you give the above protest consideration,” was a sufficient statement of the grounds of objection, even though confused with much irrelevant and improper matter. The city commission having acquired jurisdiction to consider the matter, its action cannot be questioned on collateral attack, and its determination is not open to review by the courts. Belser v. Hoffschneider, supra; Rubin v. City of Salem, 58 Or. 91, 112 Pac. 713.
This view is taken upon the assumption that an appeal was necessary to confer jurisdiction upon the' city commission to review the action of the superintendent of streets and to determine whether or not in fact the work had been completed. But a consideration of the provisions of the Arizona Improvement Act leads to the view that no appeal is necessary to confer such jurisdiction. Under the Cali
“Upon the recording of the assessment and warrant, the superintendent of streets shall notify the legislative body of the municipality of such recording, and it shall thereupon fix a time when it will hear and pass upon the assessment and the proceedings theretofore had and taken.”
It is then provided that the owner or -other interested party may appeal. Then follows this provision :
“At’the time fixed for the hearing or at such time or times not later than ten days thereafter, to which such hearing may be postponed, the legislative body of such municipality shall hear and pass upon all objections so made and filed. All the decisions and determinations of said legislative body upon notice and hearing as aforesaid, shall be final and conclusive upon all persons entitled to appeal under the provisions of this section, as to all errors, in-formalities, and irregularities which said legislative body might have remedied or avoided at any time during the progress of the proceedings. In the event that the legislative body finds that the contract has not been fully performed, it shall suspend the assessment until such time as in its opinion said contract shall thereafter be fully performed, where*201 upon by its order the date of said assessment and warrant shall be changed to such date and said warrant and assessment shall thereafter be effective and the amounts thereof be payable as of the date of said order. It may modify the amounts of the several assessments after hearing, and may in its discretion order a new assessment to be made.”
It will be seen that by this statute, upon the recording of the assessment and warrant, the superintendent of streets must in all cases give notice to the legislative body of the city. That body must thereupon fix a time for hearing and passing upon the assessment and the proceedings theretofore had. In a separate and distinct sentence it is provided that, in the event that the legislative body finds the contract has not been fully performed, it shall suspend the assessment and thereafter order its redating at such time as it shall determine that the contract has been performed. But for the expression “the legislative body of such municipality shall hear and pass upon all objections so -made and filed” there would be no question but that the matter- of passing upon the assessment and previous proceedings was before the municipal legislative body for such action as might be deemed proper, and that the provision for an. appeal was only to enable the individual property owner or other aggrieved person to present any objection he might have to the assessment or other proceedings. The provisions of the Arizona statute above quoted are a marked departure from the analogous provisions of the Yrooman and other California acts, and it must be presumed that the intent of the legislature was to change the effect of the statute after which the Arizona Improvement Act was generally modeled. The provision, therefore, that the legislative body shall hear and pass upon all objections so made and filed, in view of the other provisions of the statute, cannot be held to
Claim of the Barrett Company.
The Barrett Company furnished a paving material called tarvia for the improvement of West Washington Street. Judgment was rendered in its favor in the court below, against the Surety Company, and the latter appeals. The appellant concedes that the evidence is sufficient to sustain the judgment as to the amount, and states in its brief that the sole question raised and intended to be raised is that, the claimant having failed to file its claim with the city street superintendent within thirty days after the completion of the improvement, its right of action on the bond is barred. This claim is disposed of by what has been said with respect to the claim of the Phoenix-Tempe Stone Company, and the judgment in favor of this claimant is accordingly affirmed.
We have not overlooked the motions to dismiss made by some of the appellees, which were elaborately discussed in the briefs. It will be sufficient to say that we do not deem them well taken, and, as they are not of a character likely to arise in future . cases, no discussion is' necessary.
CUNNINGHAM, C. J., and ROSS, J., concur.
Judge BAKER, being disqualified, took no part in the decision of the above cases.