*1 UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA )
UNITED STATES OF AMERICA ex )
rel. TIEN H. TRAN, )
)
Plaintiff, )
) v. ) Civil Action No. 11-cv-0852 (KBJ)
)
COMPUTER SCIENCES )
CORPORATION, et al. )
)
Defendants. )
) MEMORANDUM OPINION
Relator Tien H. Tran (“Relator” or “Tran”) brings this action under the False
Claims Act (“FCA”),
Before this Court at present are three motions to dismiss, one filed by each of the
three Defendants. Although each Defendant offers a different rationale for dismissing
the particular charges that pertain to it, all argue that Relator has failed to state a claim
upon which relief can be granted for the purpose of
I. BACKGROUND
A. Initial Relationship Between the Parties The Department of Homeland Security (“DHS”) maintains a program through which the agency identifies “prime contractors” that are qualified to perform specific contracts for IT services that DHS and any of its constituent agencies—including USCIS—require. (Compl. ¶ 21 (describing DHS’s Enterprise Acquisition Gateway for Leading Edge Solutions (“EAGLE”) program).) Defendant CSC is an approved EAGLE prime contractor. ( Id. at 19.) Each contract awarded under the EAGLE program is broken down into a series of “task orders” of limited duration, and at the end of the prescribed period for each task order, DHS awards a new task order through a competitive bidding process amongst EAGLE-approved prime contractors. ( Id. ¶ 19.)
CSC has been the recipient of task orders on a particular USCIS contract (the “Prime Contract”) since the early 2000s. ( Id. ) Under the Prime Contract, CSC is required to provide IT personnel to USCIS to work on a variety of technology initiatives. ( Id. ¶ 52.) In order to provide the necessary personnel to USCIS for each task order awarded under the Prime Contract, CSC entered into subcontracting relationships with various other companies in the business of providing IT personnel. ( Id. ¶ 56.) Defendant Modis was one of these companies. ( Id. ¶¶ 13, 56.) According to the complaint, Modis is a large business ( id. ¶ 13) that is the subcontractor CSC most heavily relied upon to provide personnel to CSC, which in turn placed those persons with USCIS in order to fulfill its obligations under the Prime Contract. ( Id. ¶ 57.)
Significantly, Modis also relied on subcontracting to provide the personnel that CSC required from it for the Prime Contract. Infotran, a small business owned by *4 Relator Tran, was one of the companies with which Modis had a subcontracting agreement. ( Id. ¶ 74.) Modis and Infotran entered into this agreement in April of 2006. ( Id. ) According to the complaint, the subcontracting agreement between Modis and Infotran contained a non-compete clause that stated that Infotran could not enter into any direct contractual relationship with CSC while it maintained its subcontracting agreement with Modis (and for one year thereafter). ( Id. )
Thus, initially, CSC operated as the prime contractor placing personnel with USCIS under the Prime Contract, Modis was a direct subcontractor of CSC, and Infotran was a second-tier subcontractor who had a contractual relationship only with Modis, but provided personnel to Modis whom Modis then designated to perform work for CSC under the Prime Contract. [1]
B. The September 2008 Task Order And CSC’s Small Business Subcontracting Plan
As noted above, the Prime Contract was awarded periodically in the form of task orders that were subject to competitive bids that EAGLE-approved prime contractors submitted. In May of 2008, CSC bid on a task order under the Prime Contract that is hereinafter referred to as the “September 2008 Task Order.” ( Id. ¶¶ 3, 58.) As a part of its bid, CSC included a “Small Business Subcontracting Plan” in which it represented that, if it was awarded the task order, a minimum of 40% of the money that it paid out to subcontractors for personnel supplied to perform work under the task order would go to qualified “small business concerns.” ( Id. ¶ 59.) [2] According to the complaint, if CSC *5 had not included the Small Business Subcontracting Plan in its bid, then it would not have been eligible to compete for the September 2008 Task Order. ( Id. ¶ 62.) CSC was eventually awarded the task order—valued at over $200 million—on September 29, 2008. ( Id. ¶ 63.)
Under the September 2008 Task Order and the applicable federal contracting
regulations (specifically,
C. The “Pass-Through” Proposal The complaint alleges that neither CSC nor Modis qualify as “small business concerns” under the criteria that the Small Business Administration has set forth. ( Id. ¶¶ 12-13.) Thus, the personnel that CSC sourced from Modis could not count towards the Act allows the Administrator of the Small Business Administration to define additional criteria by which business can qualify for status as a “small business concern.” Id. § 632(a)(2)(A). These criteria are contained in the regularly- published “Size Standard Table,” available at
http://www.sba.gov/sites/default/files/files/Size_Standards_Table.pdf (last visited July 3, 2014). At all times relevant herein, Infotran qualified as a small business concern. (Compl. ¶ 11.) *6 CSC’s small business subcontracting goals under the September 2008 Task Order. ( Id. ¶¶ 6, 10.) According to the complaint, Ken Harvey, CSC’s program manager for the Prime Contract, recognized in the run-up to CSC’s bid for the September 2008 Task Order that CSC would have to find a way to increase the percentage of its subcontracting that went to qualified small business concerns in order to win the task order. ( Id. ¶ 77.) The complaint asserts that, to remedy this problem, Harvey approached Tim Martin, Modis’s sales director, in September of 2007, to discuss CSC’s need to increase the amount of subcontracting work it awarded to small businesses.
( Id. ) Martin subsequently approached Tran and proposed that Infotran, which was a qualified small business concern, become a direct subcontractor of CSC in order to allow CSC to increase the percentage of its subcontracting that was awarded to small businesses. ( Id . ¶ 78.) In the arrangement Martin proposed to Tran, once Infotran had formed a direct subcontracting agreement with CSC, Infotran would use exclusively Modis personnel to fulfill its obligations to CSC, and would be paid a small fee per each hour of labor performed by personnel sourced from Modis through Infotran. ( Id .) In other words, the complaint alleges that Modis proposed an arrangement whereby Modis and Infotran would essentially switch places vis-à-vis CSC. The purpose of this arrangement, according to the complaint, was to allow Modis to pass personnel through Infotran to CSC, thereby allowing CSC to report those personnel as coming from a small business (Infotran), when in reality they were coming from a large business (Modis).
Tran alleges that he refused to participate in this “pass-through” scheme when it was first proposed in September of 2007. ( Id. ¶ 79.) Nevertheless, on April 11, 2008, *7 Infotran, allegedly with the consent of Modis, entered into a direct subcontracting agreement with CSC. ( Id. ¶ 80.) The complaint alleges that, by the terms of this contract, Infotran agreed to provide personnel to perform certain services for CSC under the Prime Contract, but never agreed to use Modis personnel in fulfillment of those obligations. (Id. ¶¶ 80-82.)
Apparently, Infotran was not the only small business that Modis approached about setting up a pass-through arrangement. According to the complaint, CSC preferred to work with larger businesses (such as Modis) for reasons of efficiency, despite its contractual commitment to utilizing qualified small business subcontractors. ( Id. ¶ 83.) For this reason, Modis allegedly formed pass-through relationships with several small-businesses, including Defendant Sagent. ( Id. ¶¶ 87-91.) The complaint claims that the structure of these relationships mirrored the structure that Tim Martin had proposed to Infotran in September of 2007; that is, Modis would encourage small businesses, such as Sagent, to form a direct relationship with CSC, with the understanding that those small businesses would fulfill any of CSC’s requests for personnel through subcontracts with a larger company such as Modis. That larger company would then provide the personnel, and the small business would keep a small fee as a commission for its role as a conduit. ( See, e.g. , id. ¶¶ 92-100.) According to the complaint, this pass-through system permitted CSC effectively to eschew its small business subcontracting obligations, but nevertheless report that it had met its goal of allocating 40% of its subcontractor spending to small businesses as the Small Business Subcontracting Plan directed, despite the fact that employees of large businesses were *8 performing almost all of the actual work under the September 2008 Task Order. ( Id.
¶ 100.)
D. Modis’s Lawsuit Against Infotran In October of 2008, four months after Infotran entered into its direct subcontracting agreement with CSC, CSC first asked Infotran to provide personnel for work to be performed under the September 2008 Task Order. ( Id. ¶¶ 115, 144.) In response, Infotran allegedly submitted two of its own employees to CSC for the open positions. ( Id. ) According to the complaint, Tim Martin of Modis subsequently called Tran to complain about Infotran’s actions, including threatening Infotran with legal action should it again attempt to place its own employees with CSC, rather than simply playing a role as a conduit for Modis employees. ( Id. ¶¶ 117, 146.) Martin allegedly told Tran that Modis had only agreed to waive enforcement of the non- compete clause in Infotran’s contract with Modis—the waiver that had enabled Infotran to enter into a direct subcontracting agreement with CSC—on the condition that Infotran would provide personnel to CSC only with the guidance and consent of Modis. ( Id. ¶¶ 118- 20.)
In March of 2009, Infotran again placed one of its own people with CSC when a position became open under the September 2008 Task Order, without consulting Modis. ( Id. ¶ 150.) The complaint alleges that, in response, Martin sent Tran a long email stating in part that “Modis has elected to allow Infotran[] to obtain a subcontract with CSC for the sole purpose of acting as a small business conduit for Modis to continue to provide resources to CSC while helping them meet their small business quota” and that *9 “[a]t no time did Modis agree to waive its non-compete to allow Infotran[] to provide direct staffing services to CSC . . . without Modis participation.” ( Id. ¶ 150.)
On June 5, 2009, Modis filed a breach of contract action against Infotran in the United States District Court for the District of Columbia, alleging that Infotran had violated the non-compete clause in its contract with Modis. ( Id. ¶ 152; see also Modis, Inc. v. Infotran Systems, Inc. , 09-cv-1051-RWR (D.D.C. 2009) (“ Modis v. Infotran ”).) [3] The complaint alleges that Modis brought that lawsuit as retaliation for Infotran’s refusal to participate in the pass-through scheme. (Compl. ¶ 159.) Moreover, the complaint states that after Modis commenced litigation against Infotran, CSC allegedly “froze out” Infotran from receiving new opportunities under its EAGLE contract from approximately May 2009 through November 2010, and eventually officially terminated its relationship with Infotran. ( Id. ¶¶ 153-54.) Relator alleges that these actions were also taken in retaliation for Infotran’s refusal to participate in the pass-through scheme. ( Id. ¶ 160.) [4]
E. Tran Files The Instant FCA Complaint Against CSC, Modis, And Sagent
Tran filed the original complaint in the instant case on May 5, 2011, and
amended the complaint on October 17, 2011. (ECF Nos. 1, 4.) Tran alleges five counts
under the FCA in relation to the alleged pass-through arrangement: (1) Presentation of
*10
False Claims in violation of
Defendants were served with the amended complaint on December 11, 2012, and
on January 11, 2013, Defendants filed the three motions to dismiss pursuant to
II. LEGAL LANDSCAPE
A. Legal Standard For Motion To Dismiss Under
“Although ‘detailed factual allegations’ are not necessary to withstand a
In deciding whether to grant a motion to dismiss under
B. Legal Standard For Motion To Dismiss Under
Diabetes Treatment Ctrs. of Am., Inc.
,
Westinghouse Savannah River Co.,
C. The Small Business Act
The Small Business Act,
The essence of the American economic system of private enterprise is free competition. . . . The preservation and expansion of such competition is basic not only to the economic well-being but to the security of this Nation. Such security and well-being cannot be realized unless the actual and potential capacity of small business is encouraged and *14 developed. It is the declared policy of the Congress that the Government should aid, counsel, assist, and protect, insofar as is possible, the interests of small-business concerns in order to preserve free competitive enterprise, to insure that a fair proportion of the total purchases and contracts or subcontracts for property and services for the Government (including but not limited to contracts or subcontracts for maintenance, repair, and construction) be placed with small- business enterprises, to insure that a fair proportion of the total sales of Government property be made to such enterprises, and to maintain and strengthen the overall economy of the Nation.
Specifically with respect to contracts that the federal government enters into,
section 637(d)(1) of Title 15 of the U.S. Code provides that “[i]t is the policy of the
United States that small business concerns . . . shall have the maximum practicable
opportunity to participate in the performance of contracts let by any Federal agency[.]”
In furtherance of this goal, section 637(d)(4) provides that government contractors who
wish to bid on contracts of more than $500,000 shall “negotiate with the procurement
authority a subcontracting plan which incorporates” certain contract clauses that relate
to the federal government’s policy towards small business and the contractor’s
obligations with respect to that policy. This plan is a requirement for any large
government contract, because “[n]o contract shall be awarded to any offeror unless the
procurement authority determines that the plan . . . provides the maximum practicable
opportunity for small business concerns . . . to participate in the performance of the
contract.”
The implementing regulations of
Significantly, Congress has also expressly provided that “the failure of any
contractor or subcontractor to comply in good faith with [the terms of a S mall Business
Subcontracting Plan]
shall be a material breach of such contract or subcontract
[.]”
D. The False Claims Act The FCA was originally enacted in 1863 and has been amended several times over the past 150 years, including as a part of the Fraud Enforcement and Recovery Act of 2009 (“FERA”), which was enacted on May 20, 2009. The current, post-FERA version of the FCA provides a cause of action for private parties, known as “ relators,” to bring suits on behalf of the federal government for false or fraudulent statements made to the government. Specifically, and in relevant part, the FCA establishes *16 liability for any person who “(A) knowingly presents, or causes to be presented, a false or fraudulent claim for payment or approval; (B) knowingly makes, uses, or causes to be made or used, a false record or statement material to a false or fraudulent claim; [or] (C) conspires to commit a violation” of, inter alia , paragraphs (A) or (B). 31 U.S.C § 3729(a)(1)(A)-(C). [8]
Claims brought under prong (a)(1)(A) of section 3729 are commonly referred to as “presentment” claims, and “allow[] a court to impose liability on a defendant for presenting a direct false claim or a false certification to the government.” Joel M.
Androphy, Federal False Claims Act and Qui Tam Litigation , § 4.03[1] (2013).
Moreover, it is well established that prong (a)(1)(B) of section 3729 not only permits
legal action for making or causing material false statements, but also encompasses a
cause of action based on a theory of fraudulent inducement.
See U.S. ex rel. Bettis v.
Odebrecht Contractors of Cal., Inc.
,
In addition to establishing a cause of action against individuals who submit false claims and/or make or cause false statements that are material to false claims (including fraudulent inducement), the FCA also provides some measure of protection for retaliation against relators who choose to bring charges against their employers or business partners on behalf of the government. Section 3730(h) provides that
Any employee, contractor, or agent shall be entitled to all relief necessary to make that employee, contractor, or agent whole, if that employee, contractor, or agent is discharged, demoted, suspended, threatened, harassed, or in any other manner discriminated against in the terms and conditions of employment because of lawful acts done by the employee, contractor, agent or associated others in furtherance of an action under [the FCA].
III. ANALYSIS
The instant complaint alleges five different FCA-related counts that concern the
establishment and maintenance of a pass-through scheme to facilitate CSC’s allegedly
fraudulent representation to the government that the small business requirements of the
*18
September 2008 Task Order had been fulfilled, and these counts generally fall into three
categories. First, there are the counts that maintain that Defendants submitted false
claims or made false statements, or caused such false claims or statements to be made,
in violation of subparagraphs (A) and (B) of section 3729(a)(1) of the FCA—these are
Relator’s Presentment, Material False Statements, and Fraudulent Inducement counts
(Counts I, II, and III). Second, there is Relator’s Conspiracy count (Count IV), which
alleges a violation of section 3729(a)(1)(C) and is based upon the alleged agreement
between CSC and Modis to implement the pass-through scheme. And third, there is
Relator’s Retaliation count (Count V), which alleges that CSC and Modis violated
A. Relator’s Core FCA Counts: Presentment, Material False Statements, and Fraudulent Inducement The first category of counts includes those counts that are directly based on the allegedly false submissions that CSC made to the government in connection with the September 2008 Task Order. According to the complaint, these false submissions include (a) the invoices that CSC submitted to the government in order to get paid under the task order; (b) the various reports (ISRs and SSRs) that CSC submitted to the government certifying that it was in compliance with the Small Business Subcontracting *19 Plan; and (c) the allegedly fraudulent Small Business Subcontracting Plan itself.
Defendants make numerous specific arguments for dismissal of each Relator’s fraud
counts under
1. The Alleged Pass-Through Scheme Is Not Unquestionably Authorized
CSC insists that Tran has failed to state a claim upon which relief can be granted
because federal law and regulations condone the very behavior that Tran contends is
fraudulent. (
See
CSC Br. at 10-14.) In support of this assertion, CSC points to section
52.219-14 of Title 48 of the C.F.R., which is a regulation mandating that the recipients
of certain government contracts—namely, small business “set-aside” service
contracts—must abide by the following contractual provision: “At least 50 percent of
the cost of contract performance incurred for personnel shall be expended for
employees of the [small business].” (CSC Br. at 12 (quoting
CSC’s logic requires far too many leaps to be persuasive. First of all, a
regulatory requirement that small businesses that have won set-aside contracts must
spend at least 50% of their payroll expenses on their own employees says nothing about
how the other 50% of the cost of contract performance is to be fulfilled, much less that
the small business concern can appropriately subcontract that work to a single large
business, as CSC assumes. Moreover, and even more significantly, CSC concedes that
the contracts at issue here are
not
“set-aside” service contracts at all, and thus do not
even contain the vaunted 50% requirement upon which CSC relies. It would be one
thing for CSC to infer that the government has blessed the challenged pass-through
scheme if the 50% requirement applied in the instant context. But CSC is effectively
asking this Court to draw supportive conclusions from a
double
negative: not only
regulatory silence regarding the applicability of any 50% requirement to non-set aside
contracts, but also the policymakers’ failure to include any more restrictive requirement
related to subcontracting in the statutes and regulations that do apply to the instant
circumstances. (
See
CSC Br. at 12 (heralding the 50% requirement in the set-aside
*21
context, and noting that “there is no more stringent limitation applicable when Federal
prime contractors like CSC are subcontracting to small businesses”). CSC does not
explain why—as a matter of pure statutory interpretation—total silence in a regulation
or statute regarding the manner in which small businesses are permitted fulfill their
contracting needs in the circumstances at bar should be interpreted as evidence of an
intent to bless the pass-through arrangement. (
See, e.g.
,
id.
(asserting without support
that “[t]he ability of small businesses to subcontract to large businesses under ‘set
aside’ contracts is conclusive that CSC has not made any false claims or statements as
alleged”).) And, indeed, the opposite inference is ordinarily drawn in similar
circumstances.
See, e.g.
,
Keene Corp. v. United States
,
CSC’s argument that the required “set-aside” contract provisions demonstrate
lawful action here is also belied by Congress’s clear purpose in establishing the 50%
requirement in the small business set-aside context. Small business “set-aside”
contracts are government contracts that are reserved exclusively for small businesses.
See
Notably, CSC’s only additional linchpin for its pass-throughs-are-clearly- permissible point—the assertion that regulations permit second-tier subcontracting *23 arrangements ( see CSC Br. at 13)—does little to bolster its argument. Section 52.215– 222 of FAR requires subcontractors to disclose any additional fees charged for the use of second-tier subcontractors provided that the subcontractor intends to transfer at least 70% of the work awarded to it to a second-tier subcontractor. CSC argues that this provision proves that the government is fully aware that second-tier subcontracting occurs and that it often includes additional expenses. (CSC Br. at 13.) But the clause CSC points to is a general contracting provision that is unrelated to any small business requirements and has no application to the charges Relator brings against CSC.
Insisting that this Court read a regulation that appears to countenance general second-
tier subcontracting to authorize a practice that arguably undermines the clear goals
Congress announced in the Small Business Act is a bridge too far under the
circumstances presented here.
Cf. SEC v. C.M. Joiner Leasing Corp.
,
This Court concludes, then, that nothing in CSC’s motion to dismiss establishes that the challenged pass-through scheme is unquestionably proper such that Relator’s complaint, which alleges that the pass-through scheme improperly facilitated the submission of false claims to the government, must necessarily be dismissed.
2. Relator Has Adequately Alleged Presentment And Material False Statements Counts Against CSC And Modis, But Not Against Sagent
Relator’s Presentment and Material False Statements counts (Counts I and III of the complaint) are subject to similar legal standards, and therefore, the Court will consider them together in its analysis of whether these counts have been adequately alleged. These counts are alleged against all three Defendants, and while the factual basis of the counts (that is, the allegedly fraudulent submission of invoices or reports to the government) is the same for each Defendant, there are significant differences in the roles that each Defendant played with respect to the various submissions. As the party that had actual contractual commitments to the government and the corresponding obligation to certify its compliance with the Small Business Subcontracting Plan, CSC is the primary defendant in this case, and the defendant that was directly responsible for the submissions that form the basis of the Presentment and Material False Statements counts. Modis and Sagent, by contrast, are, according to the complaint, liable only for “causing” the submission of these allegedly false documents through their exceedingly different levels of involvement with the pass-through scheme. The Court has considered Relator’s Presentment and Material False Statements counts against each of these Defendants separately, and, for the reasons explained below, it concludes that the counts against CSC and Modis survive, but the counts against Sagent must be dismissed.
a. The Presentment And Material False Statements Counts Against CSC
i. Presentment
Relator’s Presentment count against CSC (Count I) is grounded in Relator’s
allegations that, under the IT contracts at issue here, CSC regularly presented claims for
payment to the government that were knowingly false insofar as CSC was implicitly
representing that it had complied with the terms of the Small Business Subcontracting
Plan when, due to the nature of the pass-through scheme, CSC had not in fact done so.
(Compl. ¶¶ 194-95.) The presentment provision of the FCA forbids any person from
“knowingly present[ing], or caus[ing] to be presented, a false or fraudulent claim for
payment or approval” to the federal government.
Presentment claims under the FCA “take a variety of forms” and do not
necessarily require any affirmatively false statement.
United States v. Sci. Applications
Int’l Corp.
,
On their face, Relator’s presentment allegations contain all of the elements of a presentment claim based on a theory of implied false certification. First, the complaint clearly and adequately identifies the specific claims that were submitted to the government and states why those claims are alleged to be false. In particular, the complaint states that “CSC submitted claims for payment to the United States periodically” pursuant to the September 2008 Task Order “from November 1, 2008 onward,” and that “[e]ach such invoice as submitted by CSC was a false claim” due to the fact that CSC had failed to adhere to a contractual term— i.e. , the requirement that a certain percentage of its contracting be parceled out to small businesses. (Compl.
¶¶ 190, 194.) Moreover, the Complaint clearly alleges that CSC “ knowingly concealed its failure to comply” with the Subcontracting Plan. ( Id. ¶ 192 (emphasis added).) Finally, Relator has sufficiently alleged that the false certifications were material to the Government’s decision to pay the claims. ( See, e.g. , Compl. ¶ 197 (alleging that the pass-through scheme caused the Government to pay claims it “would not otherwise have paid”).)
Relator has also alleged the details of its presentment claim with enough
specificity to satisfy
To be sure, the complaint does not relate the specific
dates
on which CSC
submitted each of the invoices, but
2003) (noting that, while “some information on the false claims must be included[,]”
ii. Material False Statements
The same analysis that compels the Court to conclude that the Presentment count
is adequately alleged is also applicable to the Material False Statements count against
CSC (Count III), and that count survives CSC’s motion to dismiss for the same reasons.
In order to state a claim under FCA
Relator’s Material False Statements count survives CSC’s motion to dismiss
because the complaint alleges, with adequate specificity, that CSC made material false
statements to the government in the form of its submission of semi-annual reports (ISRs
and SSRs) pursuant to
CSC’s arguments to the contrary are unavailing. CSC argues that Relator’s
Presentment and Material False Statements counts must fail because Relator has not
alleged that any particular false claim or statement was actually made, and that the best
Relator can do regarding the specifics that
(CSC Br. at 14 (“The Relator does not specifically allege that Sagent, or any other small business subcontractor, subcontracted 50% or more of its services from large businesses.”).) In CSC’s view, without such an allegation, Relator has failed to allege that any claim or statement submitted to the government was actually false, because nothing in the complaint establishes that CSC misrepresented the extent of its compliance with the terms of the Small Business Subcontracting Plan. Of course, this argument fails for the exact same reason that CSC’s primary argument fails—that is, the 50% threshold that CSC invokes is not relevant to the contract at issue here because the September 2008 Task Order is not a “set-aside” contract under the terms of the Small Business Act. See supra Part III.A.1. In other words, because non-compliance with the 50% requirement is not necessarily the harbinger of wrongful conduct that CSC makes it out to be, this Court concludes that Relator was not specifically required to allege that CSC passed-through more than 50% of the work it assigned to small business subcontractors under the September 2008 Task Order in order to allege a false claim or false statement adequately.
CSC’s argument that Relator’s “information and belief” allegations are
insufficient to satisfy the
CSC also argues that Relator fails to allege adequately the “materiality” aspect
of its Presentment and Material False Statements counts, because its “materiality
allegations are nothing but conclusions that merely parrot the FCA materiality
requirement” and lack any “specific factual basis to support those contentions.” (CSC
*32
Br. at 30.) But this assertion ignores the language of
In the end, this Court is convinced that the specificity with which Relator has
identified the allegedly false claims and statements at issue and the scheme that
underlies them is sufficient to “ensure that defendants have adequate notice of the
charges against them to prepare a defense.”
McCready
,
b. The Presentment and Material False Statements Counts Against Modis
Although Relator has sufficiently stated valid Presentment and Material False
Statements counts against CSC, the same is not necessarily true for these counts as
brought against Modis because Modis played a substantially different role with respect
to the allegedly fraudulent activity at issue here. Relator’s presentment and false
statement claims against Modis are premised on the allegation that Modis was generally
involved in devising and maintaining the pass -through scheme along with CSC, and
*34
therefore Modis is liable for having “cause[d CSC’s false claims] to be presented” as
well as for having “cause[d CSC’s false statements] to be made.”
knowingly caused the submission of these false statements in order that CSC get paid for false claims under the USCIS Contract.”).)
“For a plaintiff to allege a cause of action under
Courts have addressed the question of whether or not a party that did not actually
submit false claims or make false statements to the government can be held liable on a
“causes to be presented” theory in a variety of contexts. The paradigmatic case occurs
when the non-submitting party takes advantage of an unwitting intermediary , thereby
*35
causing that party to submit a false claim. For example, a subcontractor may be liable
for causing false claims to be submitted under the FCA “if the subcontractor submits a
false statement to the prime contractor intending for the statement to be used by the
prime contractor to get the government to pay its claim.”
United States v. Honeywell
Intern. Inc.
,
Hutcheson v. Blackstone Med., Inc.
,
Schmidt v. Zimmer, Inc.
,
Moreover, even where the non-submitting entity was not the prime mover of the
alleged fraud, courts have found such entities potentially liable on the theory that they
caused the presentation of false claims where they had agreed to take certain critical
actions in furtherance of the fraud.
See, e.g.
,
U.S. ex rel. Sikkenga v. Regence
*36
Bluecross Blueshield of Utah
,
U.S. ex rel. Long v. SCS Bus. & Technical Inst., Inc.
,
In the instant case, while the allegations in the complaint indicate that it was CSC, not Modis, that was the primary architect and beneficiary of the pass-through scheme, it is abundantly clear that Modis’s participation in the scheme was sufficient to constitute a “substantial factor in causing” CSC’s submission of the false claims.
Toyobo
,
Indeed, Modis offers no argument to the contrary; instead, it retreats to the
contention that Relator has failed to state a claim against Modis with the requisite
particularity required by
c. The Presentment and Material False Statements Counts Against Sagent Relator has alleged his Presentment and Material False Statements counts against Sagent as well as against CSC and Modis, but the complaint contains only a few allegations of fact that relate to Sagent specifically. In particular, the complaint quotes emails between Modis and CSC indicating that Sagent played the role of a conduit under the pass-through scheme (Compl. ¶ 89), as well as internal CSC emails to the same effect ( id. ¶ 91). The complaint also alleges that four employees of a different large business called Compuware were funneled through Sagent to CSC ( id. ¶¶ 92-99), and that, in total, approximately 15 employees were funneled to CSC through Sagent *39 from various large businesses ( id. ¶ 101). This is the sum total of the allegations involving Sagent.
These allegations are insufficient to state a claim against Sagent for causing false
claims to be presented or causing material false statements to be made. In particular,
the complaint is devoid of any allegations concerning Sagent’s knowledge of the small
business requirements under the September 2008 Task Order and the Small Business
Subcontracting Plan imposed on CSC, nor are there any allegations of fact that would
support any inference that Sagent knew there was a link between those contract
requirements and the pass-through dynamic. Such knowledge is the linchpin of
establishing fraud under the circumstances presented, and thus it is a necessary element
of Relator’s allegation that Sagent wrongfully participated in a pass-through scheme
that was designed and administered to enable CSC to certify falsely that it was in
compliance with its Small Business Contracting Plan.
See
The FCA provides a specific definition for the requisite knowledge element of a viable FCA claim:
(1) the terms “knowing” and “knowingly”—
(A) mean that a person, with respect to information— (i) has actual knowledge of the information; (ii) acts in deliberate ignorance of the truth or falsity of the information; or
(iii) acts in reckless disregard of the truth or falsity of the information . . . .
Relator contends that such allegations are not needed, because otherwise Sagent
would be permitted to escape liability on the basis that it was a “uniquely obtuse ostrich
with its head in the sand[,]” and that such “deliberate ignorance” is specifically covered
under the definition set forth in
3. Relator Has Adequately Alleged Fraudulent Inducement
Against CSC
Relator’s Fraudulent Inducement count (Count II)—which is styled as “Making
Material False Statements to Obtain the September 2008 Task Order” (Compl. at 48)—
is alleged against CSC only, and is the only count in the complaint that arises wholly
under a version of the FCA that has since been amended.
See supra
n. 9. Relator
alleges a violation of the former
The viability of an allegation of fraudulent inducement in violation of the FCA is
well-established. Indeed, “[e]ven in the absence of allegations that the claims [for
payment] themselves were false, . . . [payment] claims alleged to have been submitted
under a contract procured by fraud can be actionable.”
Toyobo
,
It is clear on the face of the complaint that Relator has adequately alleged a fraudulent inducement claim. Specifically, the complaint alleges that “[o]n or about May 16, 2008, CSC submitted a bid to the United States” for the September 2008 Task Order, and that “[a]long with its bid, CSC presented a ‘Small Business Subcontracting Plan’ in which it represented that a minimum of forty percent (40%) of its subcontractor spending” would go to small business subcontractors. (Compl. ¶ 3.) The complaint further alleges that “[t]his representation was false, as CSC never had any intention of complying with its subcontracting plan.” ( Id. ; see also id. ¶ 66 (“CSC had no intention *43 of actually utilizing Small Businesses. Instead, CSC” used small businesses merely as fronts “to pass through [work to] its Large Business” employees.)) And to support this allegation, the complaint provides myriad details of exactly how CSC adopted a pass - through scheme to shroud its allegedly willful misrepresentations regarding its intention to comply with the terms of the Small Business Subcontracting Plan. For example, the complaint alleges that, on October 10, 2008—less than one month after the September 2008 Task Order was awarded to CSC—Jim Pizzola, CSC’s Applications Program Manager for that contract, told his boss, CSC Program Manager Ken Harvey, in writing that Pizzola had “talked to [Modis’s sales director] Tim Martin this afternoon,” and
told Tim that our small sub, large sub mix needed adjusting and MODIS must work-thru small subs for future candidates. Tim said you talked to him about it and Tim would work- thru Infotran. . . . Finally, I told him we needed to start thinking about running existing MODIS personnel thru Infotran.
(Compl. ¶ 130.) Similarly, according to the complaint, Tim Martin made sure that Tran was aware of the pass-through arrangement and emphasized that implementing the pass- through scheme was the reason why Modis agreed to the changed business relationships that occurred after the September 2008 Task Order was awarded to CSC. ( See id .
¶ 150.) [11] The complaint also maintains that Martin testified in prior litigation that *44 [CSC’s] Ken Harvey was aware of the agreement to allow Infotran to act as a conduit for Modis to support CSC’s needs to grow its small business spend[ing] from day one. It was he who suggested that additional subcontract small business spend[ing] was necessary and that -- and applauded my suggestion that Infotran be allowed to act as a pass- through, an administrator, a conduit for Modis in the provision of services to CSC for the purpose of expanding its small business spend[ing] from day one.
( Id. ¶ 128; see also id. ¶ 129 (“Mr. Harvey confirmed his knowledge of the pass- through agreement at his own deposition, testifying on October 27, 2010 that he understood that Modis would place personnel on the USCIS Contract ‘through Infotran.’”) These allegations are more than sufficient to raise an inference that the September 2008 Task Order was fraudulently induced because CSC had intended to utilize a pass-through scheme “from day one” ( id. ¶ 128), despite the fact that CSC represented to the government that it would engage in 40% small business subcontracting pursuant to its Small Business Subcontracting Plan.
CSC nevertheless argues that the complaint fails to state a fraudulent inducement
claim because it contains no allegations that CSC’s allegedly fraudulent and intentional
noncompliance with its own Small Business Subcontracting Plan constituted “prompt,
substantial nonperformance.” (CSC Br. at 18 (quoting
U.S. ex rel. Wilson v. Kellogg
Brown & Root, Inc.
,
Even if the requirement of “prompt” and “substantial” non-compliance for the purpose of sustaining a fraudulent inducement allegation applies, this Court is satisfied that the instant complaint alleges sufficient facts to meet that standard. Specifically, Relator alleges that “CSC relied heavily on subcontracts with Modis and other Large Businesses for the human resources it needed to perform” its obligations under the task order “[f]rom the beginning[.]” (Compl. ¶ 56; see also id. (quoting CSC’s program manager as testifying that 99% of CSC’s subcontracting was with large businesses).) Moreover, the complaint makes numerous allegations regarding Defendants’ actions with respect to their obligations under the Small Business Subcontracting Plan and events that occurred mere months after the September 2008 Task Order went into effect ( see, e.g. , id. ¶¶ 130, 132, 167-68), and it repeatedly maintains that the nonperformance *46 was a material breach of the task order contract ( see, e.g. , id. ¶¶ 42, 61, 64, 135). When viewed in light of Relator’s contention that CSC and Modis devised the pass-through scheme for the purpose of being able to make the (fraudulent) representation that CSC would rely on small businesses as necessary to win the September 2008 Task Order bid, the complaint’s allegations regarding the early steps that were taken to implement that scheme are sufficient to show that CSC’s alleged fraudulent failure to comply with its own Small Business Contracting Plan was both prompt and substantial. [12]
B. Relator’s Conspiracy Count
Relator’s Conspiracy count alleges that CSC and Modis engaged in a conspiracy
to present false claims in violation of FCA
States suffered damages as a result of the claim.” United States v. Bouchey , 860 F.
Supp. 890, 893 (D.D.C. 1994);
see also Exec. Sandwich Shoppe, Inc. v. Carr Realty
Corp.
,
Given the complaint’s description of the relationship between CSC and Modis that has already been described at length (and in particular, in the prior discussion of Relator’s fraudulent inducement claim, see supra Part III.A.3), this Court concludes that Relator’s conspiracy claim is adequately pled. In short, the complaint contains numerous allegations regarding the agreement between CSC and Modis as it relates to the development and maintenance of the pass-through scheme. CSC executives were in frequent contact with at least one Modis representative who allegedly agreed that Modis “must work-thru small subs” to assist CSC in fulfilling its obligations under the September 2008 Task Order because CSC’s “small sub, large sub mix needed adjusting[.]” (Compl. ¶ 223.) Moreover, the complaint is replete with allegations concerning actions that these two parties took in furtherance of that agreement. ( See, e.g. , id. ¶ 78 (describing Modis’s proposal that Infotran become a direct subcontractor to CSC); ¶ 150 (describing Modis’s admonishment of Infotran for placing its own people with CSC, rather than Modis’s).) What is more, according to the complaint, the agreement between CSC and Modis to implement the pass-through scheme resulted in “the creation and submission to the United States of false statements consistent with the *48 fraudulent nature of the pass-through scheme” ( id. ¶ 224), which caused harm to the government because the government allegedly would not have paid the allegedly fraudulent claims had it known of the pass-through scheme ( id. ¶¶ 174-176). Thus, the established elements of an FCA conspiracy claim—that there was an agreement between two or more actors to have a false claim paid; that the conspirators committed at least one act in furtherance of that aim; and that the United States suffered damages as a result—are easily satisfied.
CSC and Modis offer two arguments to the contrary. First, these Defendants contend that they cannot be held liable for engaging in an illegal conspiracy because there has been no illegal action alleged. ( See CSC Br. at 20-21); see also Exec.
Sandwich Shoppe
,
These Defendants’ second retort is that the complaint fails to allege specific facts
supporting an inference that there was an actual agreement and that the agreement was
for the purpose of accomplishing an unlawful act—here, the submission of false claims.
But it is well-established that a plaintiff need not allege that an express or formal
agreement was entered into in order to establish that the parties were in agreement for
the purpose of a conspiracy claim.
Cf. Halberstam v. Welch
,
C. Relator’s Retaliation Count
The complaint’s final count (Count V) is brought against CSC and Modis on the
grounds that these Defendants allegedly retaliated against Relator in violation of the
anti-retaliation provision of the FCA,
[a]ny employee, contractor, or agent shall be entitled to all relief necessary to make that employee, contractor, or agent whole, if that employee, contractor, or agent is discharged, demoted, suspended, threatened, harassed, or in any other manner discriminated against in the terms and conditions of employment because of lawful acts done by the employee, contractor, agent or associated others in furtherance of an action under this section or other efforts to stop 1 or more violations of this subchapter.
The retaliation provision of the FCA “was designed to protect persons who assist the
discovery and prosecution of fraud and thus to improve the federal government’s
prospects of deterring and redressing crime.”
U.S. ex rel. Schweizer v. Oce N.V.
, 677
F.3d 1228, 1237 (D.C. Cir. 2012) (internal quotation marks and citation omitted). In
order to state a claim for retaliation, a relator “must demonstrate that: (1) he engaged in
protected activity, that is, ‘acts done . . . in furtherance of an action under this section’;
*51
and (2) he was discriminated against ‘because of’ that activity.”
U.S. ex rel. Yesudian
v. Howard Univ.
,
1. The Complaint Contains No Allegations Of “Protected Activity”
To satisfy the first requirement of a retaliation claim, Relator primarily relies on
the fact that he allegedly refused to participate in the pass-through scheme, which he
argues qualifies as “protected activity” to the extent that it evidences his “attempt[] to
prevent CSC from making false statements and presenting false claims to the United
States.” (Compl. ¶¶ 157, 237.) Relator argues that his refusal to participate constitutes
an “effort[] to stop [one] or more violations” of the FCA within the meaning of
( See CSC Br. at 24 (acknowledging based on a reading of the legislative history that “refusals to participate” constitute protected activity under the FERA amendments).
Prior to the enactment of FERA, the retaliation provision of the FCA specifically
listed the “lawful acts” for which an employee was entitled to protection, and this list
“include[d] investigation for, initiation of, testimony for, or assistance in an action to
be filed” under the FCA.
As reasonable as this reading of the history of the FCA might seem, it is well-
established that legislative history cannot be used to demonstrate that a statute means
something that is manifestly inconsistent with its text,
see, e.g.
,
United States v. Fisher
,
Supp. 2d at 87 (relator complained to supervisors and questioned alleged unethical
activity in face-to-face meetings and e-mails);
Sharma v. District of Columbia
, 791 F.
Supp. 2d 207, 218-19 (D.D.C. 2011) (relator repeatedly complained about fraud and
corruption);
Elkharwily v. Mayo Holding Co.
,
2013) (relator reported violations to supervisors and took notes of observations);
Bechtel v. St. Joseph Medical Ctr., Inc.
, 10-cv-3381,
Perhaps sensing the weakness of his argument that a mere refusal to participate is “protected activity” for the purpose of the FCA’s retaliation provision, Relator here also suggests that his discovery efforts in support of his counterclaim in the Modis v.
Infotran action constitute “protected activity.” ( See Compl. ¶ 158 (“By pursuing its claims against Modis, [Relator] investigated the fraudulent pass-through scheme, which led to the filing of this action.”).) But this argument fares no better because Relator has not shown that he initiated any “act” or “effort” with respect to that litigation. In contrast to the many cases in which a plaintiff states a separate retaliation claim for having initiated a lawsuit, Relator cites no authority for the proposition that bringing a counterclaim in a lawsuit that was filed against him falls within the scope of “lawful acts” protected by the FCA’s retaliation provision. And when one considers that unlawful retaliation typically occurs in reaction to activity that has been undertaken for the purpose of exposing or halting illegal conduct, the conclusion that a counterclaim qualifies as protected activity is implausible on its face.
2. The Complaint Does Not Contain Facts That Establish The Requisite
Causal Connection
Even if Relator was correct that his refusal to participate in the allegedly illegal
pass-through scheme and/or his counterclaim against Modis constitutes protected
activity, his retaliation claim would
still
fail because the allegations of the complaint do
not compel the conclusion that CSC terminated Infotran because of the prior lawsuit or
in retaliation for Relator’s allegedly righteous refusal to participate in the pass-through
*55
scheme. The “causation” element of a retaliation claim requires a relator to show both
that “(a) ‘the employer had knowledge the employee was engaged in protected activity’;
and (b) ‘the retaliation was motivated, at least in part, by the employee’s engaging in
[that] protected activity.’”
Yesudian
,
Here, the complaint leaves no doubt that CSC was aware that Infotran had refused to serve as a conduit for Modis and that the two companies were engaged in a legal dispute about that situation. ( See Compl. ¶¶ 144-45.) In order to establish the requisite causation, Relator relies mainly on a March 20, 2009, email from Tim Martin of Modis to Tran, in which Martin asserts that “Modis has elected to allow Infotransys to obtain a subcontract with CSC for the sole purpose of acting as a small business conduit for Modis to continue to provide resources to CSC,” and that Modis did not “agree to waive its non-compete to allow Infotran[] to provide direct staffing services to CSC at USCIS without Modis participation.” (Compl. ¶ 150.) Relator contends that this email amounts to clear evidence that CSC terminated its relationship with Infotran because of the dispute over Tran’s refusal to participate in the pass-through scheme. (Relator Opp’n at 43.) But this email demonstrates no such thing; indeed, it suggests precisely the opposite: that CSC’s direct business relationship with Infotran was established originally “for the sole purpose” of facilitating the allegedly fraudulent scheme, such that once Infotran refused to do the job for which it was hired, CSC’s motivation for terminating the relationship was likely futility, rather than retaliation. In other words, rather than improperly ending a business relationship that had previously existed for legitimate purposes in retaliation for Infotran’s refusal to participate in the *56 fraud, the allegations of the complaint indicate that CSC’s termination of the direct supplier relationship between CSC and Infotran was the reasoned result of Infotran’s dogged refusal to fulfill the very function that the business relationship was created to achieve. Relator provides no other allegations that connect his refusal to participate with his company’s termination by CSC; consequently, Relator has failed to allege adequately facts from which an inference of retaliation could properly be drawn.
3. The Complaint Does Not Contain Facts To Support The Contention
That Modis Committed A Retaliatory Act
Finally, Relator’s contention that Modis violated the FCA’s retaliation provision
because it filed a breach of contract lawsuit against him in direct response to his refusal
to participate in the pass-through scheme (Compl. ¶¶ 236-238) also fails. The
complaint alleges that, in October of 2008, “Martin telephoned Relator Tran and
threatened him and Infotran with legal action if Infotran attempted to place any future
resources” with CSC under the September 2008 Task Order “without the involvement of
Modis.” (
Id.
¶ 117;
see also id.
¶ 150 (Modis allegedly warned that “[a]ny further
violation of the Modis Independent Contractor Agreement with Infotransys has a clear
and indesputable [sic] recourse”);
id.
¶ 152 (“[W]hen it was clear that Modis would be
unable to force Infotran to participate in the pass-through scheme, Modis retaliated by
filing a single count breach of contract Complaint” against Relator).) Even if it is
assumed that refusal to participate in the pass-through scheme was “protected activity”
and thus a sufficient trigger for a retaliation claim under the FCA (it is not,
see supra
Part III.C.1), an allegedly retaliatory lawsuit does not meet the statutory requirement
that a relator alleging retaliation must have been “discharged, demoted, suspended,
threatened, harassed, or in any other manner discriminated against
in the terms and
*57
conditions of employment
[.]”
Accordingly, Relator has failed to allege a plausible claim that either CSC or Modis retaliated against him in violation of the FCA, and Count V must be dismissed.
IV. CONCLUSION
For the reasons explained above, Relator has pled plausible claims against CSC
for the presentation of false claims, fraudulent inducement, and the making of material
false statements, and has plead each of these counts with the particularity
It may well be that, once discovery in this case proceeds, all of Relator’s claims will be proven unfounded, either because the pass-through scheme did not operate in the way Relator has alleged, or was immaterial to the payment of CSC’s claims, or for *58 some other reason. But based on the facts alleged in the complaint, and taking all of the allegations therein at face value, Relator has stated certain plausible claims against CSC and Modis based on their alleged agreement to implement a pass-through scheme in order to sidestep the promised small business requirements in a manner that rendered false CSC’s submissions and representations to the government regarding its fulfillment of those requirements. Consequently, this Court will GRANT IN PART and DENY IN PART CSC’s Motion to Dismiss; GRANT IN PART and DENY IN PART Modis’s Motion to Dismiss; and GRANT in full Sagent’s Motion to Dismiss, as set forth in the accompanying order. Ketanji Brown Jackson
Date: July 3, 2014 KETANJI BROWN JACKSON
United States District Judge
Notes
[1] The complaint does not contain any allegations regarding Defendant Sagent’s relationship with CSC, Modis, or Infotran prior to the events described infra .
[2] The Small Business Act defines a “small business concern” as “one which is independently owned and
operated and which is not dominant in its field of operation[.]”
[3] That action was actively litigated for over 3 years and settled in early 2013. Tran relies in large part on the discovery record from Modis v. Infotran (including extensive deposition testimony from the key players at CSC and Modis) to support his claims in the instant case.
[4] Infotran filed a counterclaim in
Modis v. Infotran
for tortious interference with business or contractual
relations, alleging that Modis had improperly pressured CSC to stop working with Infotran. The Court
granted summary judgment for Modis on the counterclaim, on the grounds that Infotran had adduced no
evidence that any statements made by Modis to CSC were “slander, libel, knowingly false, or even
untrue” as required to prove the tortious interference claim.
See Modis, Inc. v. InfoTran Systems ,
Inc.
,
[5] Relator’s fraudulent inducement claim arises under the pre-2009 version of the FCA. The relevant
section in the current version of the statute is
[6] The motions were fully briefed on February 7, 2013, and this Court held a motions hearing on July 16, 2013, and subsequently took the motion under advisement.
[7] The bulk of Title 48 of the Code of Federal Regulations (also known as the Federal Acquisition Regulation or “FAR”), which is found in Part 52, codifies specific contractual clauses that must be included in various circumstances in government procurement contracts. Section 52.219-9 of Title 48 of the CFR provides the required contractual language regarding Small Business Subcontracting P lans.
[8] As defined in the FCA, the term “claim”
(A) means any request or demand, whether under a contract or otherwise, for money or property . . .
that—
(i) is presented to an officer, employee, or agent of the United States; or
(ii) is made to a contractor, grantee, or other recipient, if the money or property is to be spent or
used on the Government’s behalf or to advance a Government program or interest, and if the United
States Government—
(I) provides or has provided any portion of the money or property requested or demanded; or
(II) will reimburse such contractor, grantee, or other recipient for any portion of the money or
property which is requested or demanded[.]
[9] Notably, due to the timing of the relevant allegations of fact in this case, three of the five counts in
Relator’s complaint arise wholly or in part under the pre-FERA version of the FCA. The Fraudulent
Inducement count (Count II) alleges that CSC made material false statements in May of 2008 in
connection with its submission of the Small Business Subcontracting Plan required to obtain the
September 2008 Task Order. (
See
Compl. ¶¶ 201-209.) This count therefore arises under a version of
the statute that was in effect prior to May 20, 2009, and that established liability for “any person who .
. . knowingly makes, uses, or causes to be made or used, a false record or statement to get a false or
fraudulent claim paid or approved.”
[10] CSC also urges the Court to find that compliance with the Small Business Subcontracting Plan was
not material to the government’s decision to pay the claims because “small business subcontracting
plans are a nearly universal ancillary element of large U.S. Government procurement contracts” and
constitute only “minor contractual provisions” in those contracts. (CSC Br. at 31.) That may be so, b ut
the applicable statutes make clear that having a Small Busi ness Subcontracting Plan was a significant
requirement of bidding on the government contracts at issue,
see
[11] Indeed, the complaint states that Martin sent an email to Tran at Infotran on March 20, 2009, that stated, in relevant part: Let me be perfectly clear. Infotransys is a subcontractor to Modis on the CSC USCIS EAGLE contract. Modis has elected to allow Infotransys to obtain a subcontract [directly] with CSC for the sole purpose of acting as a small business conduit for Modis to continue to provide resources to CSC while helping them meet their small business quota and at the same time creating additional (pass-through) revenues for Infotransys for its services. ( Id. ¶ 150 (emphasis added).)
[13] Among the additional arguments that CSC puts forward is its assertion that, in an email quoted in the complaint, Tim Martin specifically asked Tran to “[p]lease refrain from discussing [the pass -through scheme] with our client (CSC) as that would breach confidentiality agreements, and likely cause future damage to all parties[,]” which according to CSC, proves that there was no agreement between CSC and Modis. (CSC Br. at 22 (citing Compl. ¶ 150).) But the allegations in the complaint must be viewed in the light most favorable to Plaintiff. Given Tran’s alleged resistance to the pass-through proposal, this email statement could just as easily be viewed as evidence of Modis’s attempt to limit Tran’s discussions relating to what he apparently believed was unlawful conspiracy, rather than evidence that no such conspiracy existed.