28 F. Cas. 345 | U.S. Circuit Court for the District of Iowa | 1875
In a controversy-which has excited intense local feeling, and one involving such large interests, and to-which so much attention has been drawn on the part of the public and of congress, and’ which has been so fully argued at the bar, the court would be justified in stating with more than usual fullness the grounds of its-judgment, but as its determination is not final, and as it is understood that the unsuccessful, party, whichever it may be, will carry the order here made for revision to the supreme court, it is not our purpose to discuss the case with that degree of elaboration we should' otherwise do, and which its intrinsic importance would well warrant.
We now proceed to notice the material questions involved in the application for the peremptory writ. If the road which the respondent is bound to operate, has its terminus on. the western shore of the Missouri river, as its counsel have contended—in other words, if, under the acts of congress applicable to the respondent, it was not authorized to build the-road it is required to operate, to the Iowa shore-of the river—it may be conceded that the result would be that the relators would not be entitled to the writ they seek. What point, therefore, does the charter of the company fix as the commencement of what is therein termed the “Iowa Branch?” This question is answered by the following language in the act of 1862: “The said Unión Pacific Railroad Company is hereby authorized and required to construct a single line of railroad and telegraph from a point- on the western boundary of the-state of Iowa, to be fixed by the president of the United States.” In the executive orders of November 17, 1863, and March 4, 1864, President Lincoln did not undertake to change-this provision, but carefully conformed to it. Accordingly, those orders named “the western boundary of the state of Iowa” as “the point
If it be granted that c.ongress, by the use of the words “point on the western boundary of the state of Iowa as descriptive of the ‘point of commencement’ of the ‘Iowa Branch,’ ” meant to refer to the legal boundary of the state as declared in 1846 (9 Stat. 52), the views of counsel would be sound. And if there is nothing to show that congress meant some other than the legal boundary, there would be a strong presumption that the legal boundary was the one here intended. There is, however, in various provisions of the charter of the company, evidence of a very satisfactory character that congress, in the language under consideration, referred to the boundary of the state on the river rather than on the ideal line in the middle of its channel. It had no question of territorial jurisdiction before it, and hence its attention was, probably, not drawn to the act of 1846, fixing the legal boundary. Congress, in the charters of the Union Pacific Company, as respects all of the branches, decisively meant to secure a close and immediate connection with the Iowa and Missouri railroads—leaving no hiatus or break in the line. What reason is there, then, for supposing that the central Iowa-branch was intended to be exceptional in this respect? The Iowa lines of railway had not then been completed to the Missouri river, and hence could not be mentioned by name, but it is not readily to be supposed that congress, in granting the powers and furnishing the means to construct a great national highway, intended to make no provision for crossing a broad and swift stream like the Missouri, known to be at the western end of the Iowa roads, whose completion so as to connect with the Union Pacific road was then contemplated and relied on. Therefore, when the original charter of the company authorised and required it to construct its railway from a point on the western boundary of the state of Iowa, it authorized its construction from the Iowa shore, and if a bridge was necessary to meet the requirement, then the power to build the bridge was given. Inhabitants of Springfield v. Connecticut River R. Co., 4 Cush. 63; City of Clinton v. Cedar Rapids & M. R. Co., 24 Iowa, 455, 479; People v. Rensselaer & S. R. Co., 15 Wend. 113, 130. Indeed, it might well be urged that not only was authority conferred to build the bridge, but that the duty was imposed to build it as a nart of its “line of railroad” necessaiy to reach the prescribed point of commencement. The company did not need, so far as relates to bridges, the power given to it by the 9th section of the amended charter (1864), “to establish ferries across the Missouri river, and other rivers which its road may pass in its course,” and “to construct bridges over said Missouri river, and all other rivers, for the convenience of its road,” and “to enable it to make convenient and necessary connections wi*h other roads.” A bridge built under authority of the acts of 1862 or 1864, would be part of the road of the company; or, in the language of the original charter (section 14), part of its “line of railroad constructed from a point on the western boundary of the state of Iowa;” just as a bridge in a highway has often been held to be part of the highway itself. Dill. Mun. Corp. § 579. If there was doubt as to the right of the company to pass beyond the middle of the river, and go to the Iowa shore, under the original charter of 1862, that doubt is set at rest by the aforementioned 9th section of the amended charter of 1864, which, in terms, authorizes the company to construct a bridge over the Missouri river, which presupposes that the eastern end of it shall rest upon the Iowa shore; and this is done, so congress declares, “to enable the Union Pacific Railway to make convenient and necessary connections with other roads.” The bridge was to be built by the Union Pacific Railroad Company. No provision was'made for a bridge company, or for stock or capital for bridge purposes, and if the structure had been built under authority thus conferred, and no other, there could be no doubt .that it would have been a part of the road of the company in such a sense that the company would have been bound to operate it, as much as it was bound to operate any other part of its line.
It appears, from the return to the alternative writ, that the company, under .the authority thus given, and not otherwise, commenced the construction of the bridge here in question in 1889. It is proved to be a
Notwithstanding the rule of law that authority to levy and collect tolls must be plainly conferred, and the able argument of the relators’ counsel on this point, it is clear to our minds that congress gave, by this act, to the company the right' to “levy and collect tolls and charges for the use of the bridge,” reserving, in the second proviso, the “power at all times to regulate said bridge, and the rates for the transportation of freight and passengers over the same, and the local travel hereinafter provided for.” It is manifest, from this language, that tolls and charges, other than those for local travel, were contemplated as being within the competency of the company to levy and collect for-the use of the bridge. Besides, the chief value of the bridge as a security would be the tolls, and the authority to make a mortgage for $2,500,000 on the mere bridge structure and approaches, without the right to levy tolls, and pledge the same to the lender, would, doubtless, have proved a barren power, since it would be quite imposible to negotiate such a security. It is evident, from the tenor of the bridge mortgage, that all the parties to that instrument thus understood the act of 1871. The act contains, also, the important provision that it shall not “change the eastern terminus of the Union Pacific Railroad from the place where it is now fixed under the existing laws, nor release said company from its obligations under existing laws.” It also contains a clause adopting, as far as applicable to the bridge in question, the provisions of the bridge act of July 25, 1866 (14 Stat. 244). The act also contains a clause authorizing the bridge to be “so constructed as to provide for the passage of ordinary vehicles,” but the privilege was not used, and so need not be considered. The bridge act of 1871, it is to be observed, does not profess to repeal the previous authority, express or implied, on the part of the company to bridge the Missouri river, but only to confer additional powers and make additional provisions. All the provisions of the several acts are to be read together; and thus viewed the respondent would have, inter alia, the following rights and powers in respect to the bridge in question: (1) To build it under the original and amended charter as part of its road, and from a point on the Iowa shore. (2) Under the act of 1871 it was so far disconnected' from the road as to authorize it to be separately mortgaged as a bridge, and this act empowered the company to levy and collect tolls and charges for the use of the same as= a bridge, or compensation for the use of itr by other railroads constructed to the Missouri river at or near Council Bluffs and Omaha, congress reserving the power to regulate the bridge and the rates for transportation of freight and passengers over the same. But it was expressly provided that this act should not change the then existing eastern-terminus of the company’s road, nor release* the company from its obligations under existing laws. By this last provision it was doubtless intended to declare that the eastern terminus of the road should remain where it had before been established, and then existed, namely, on the Iowa shore, and' the existing obligations of the company springing from that fact should remain in full force. One of these obligations is that while the bridge mortgage remains unfore-closed, and the bridge is in possession of the company, the company must operate it as-part of its road, which it has never ceased to to be, although it may, under the act of 1871, charge special rates for its use, subject to the control of congress. Three several times, first in the act of 1S62 (section 12),. then in the act of 1864 (section 15), and lastly, as late as June 20, 1874, has congress required the respondent “to operate and use-its road for all purposes of communication, travel, and transportation, so far as the-public and government are concerned,” as one continuous line. This last act even goes-so far as to make it criminal on the part of the controlling officers or agents of the companies, or either of the companies, to refuse thus to operate the roads or either of them— thus demonstrating that congress intended' that each road, singly, as well‘as all the-roads constituting part of the system of Pacific roads contemplated by the acts of 1862 and 1864, should be operated without breaks-- or unnecessary delay, as a continuous line,, without favor or discrimination towards either persons or localities.
If we are right in the position that the-eastern terminus of the road of the respondent is on the Iowa shore, then, inasmuch as-the bridge act of 1871, upon which the respondent so strongly relies, declares that such terminus remains unchanged, notwithstanding that act, the conclusion necessarily follows that the respondent must operate its trains over the bridge under its control as part of a continuous line of road, and operate them over its entire line of road from terminus to terminus. Such a duty has been-enforced by a mandamus without such specific legislation as congress has provided in
A point is made by the respondent against the writ on the ground that the bridge structure is not opposite section 10. as' fixed by the president, but some two miles down the liver. In point of fact, after getting bonds and lands by reason of that location, the company has abandoned the track through section 10, and instead of crossing the river opposite that section, has constructed its road so as to connect with the present bridge. If this change in the location of the bridge from section 10 was authorized as an implied effect of the act of 1871, applied to the subject matter, the objection under consideration fails. Originally, under the order of President Lincoln, the bridge should have been constructed so as to reach the Iowa shore east of and opposite section 10. Instead of this, the company commenced a bridge at the site of the present bridge, two miles south. Congress, in 1871, authorized that bridge to be completed and mortgaged, thereby legalizing the change, and doubtless relieving the company of the duty of bridging the stream opposite section 10. And, therefore, when congress also said that the act of 1871, in relation to the bridge, should not “change the eastern terminus of the road from the place where it is now fixed under the existing laws,” it did not mean that the company should still be under an obligation to build a bridge opposite section 10, but that the Iowa shore should, notwithstanding the bridge act, remain the eastern terminus of the road, and the company’s obligation in this regard should continue. But if the change in the location of the bridge was not authorized by the act of 1871, still the company ought to be estopped to say we have reached our eastern terminus at the wrong place, and hence cannot be compelled to operate the whole length of our actual' line of road.
Again, it is suggested by the respondent’s counsel that this view, if sound, necessarily has the effect to subordinate the bridge mortgage for $2,500,000, which was intended to be a first lien upon the bridge as well as its tolls, to the prior mortgage of the company upon its entire line of road.
These respective mortgagees are not before us, and their rights cannot be touched by anything here decided. We content ourselves, therefore, with the remark that, observing the terms of the two instruments, we do not see that the result suggested necessarily follows from the positions we have attempted to maintain. It were premature at this time to anticipate that there will be a sale under the bridge mortgage, and to consider the rights of the purchaser, of the company, of the public, or of the government after that event.
Two technical points are made by the respondent. The first is that no demand is averred. Under the circumstances of this ease, this objection, being made at the hearing on the merits, and the duty being a public one, which the respondent has all the time denied to exist, comes too late. The object of a demand is to give the option to do or refuse that which is demanded, and it is evident that a demand by the relators would not have obviated the necessity for this proceeding to determine the contested question of public right and duty here involved. Dill. Mun. Corp. § 696. The other point is more substantial, and, indeed, fatal, to the application in its present form for the peremptory writ, unless the objection can be avoided by amendment. The proceedings by mandamus at common law are characterized by unreasonable strictness; and an established rule of practice in the queen’s bench is that the mandate of the peremptory writ cannot be moulded by the court after hearing upon the return of the alternative writ, but the peremptory writ must be denied altogether unless the sphere of its mandate is exactly coincident to the mandate of the alternative writ. Queen v. East & West India Docks & B. J. Ry. Co., 2 El. &. Bl; 466; 3 Adol. & E. 534; 14 Adol. & E. (N. S.) 59.
If the propositions heretofore advanced are correct, the mandate of the alternative writ was too broad in that it commanded the defendant to operate the bridge under a uniform tariff of freights and fares with the residue of the road.'
We hold that the defendant may, under the act of 1874, exact special tolls and charges for the use of its bridge. Anticipating that this might be the view of the court, the relators' counsel have, in that event, asked leave to amend by striking oat of the mandate of the alternative writ the words, “and freight and passenger tariff,” and that the peremptory-
Guided by these considerations, why should the relators be denied the power to amend to conform to the views of the court, and compelled to commence anew. The defendant, it is to be supposed, has and* feels no other interest in this controversy than to have its public duty authoritatively settled, and this can be as well done in this proceeding by allowing the amendment, as by forcing the relators to retrace all their steps, by commencing de novo.
Let an order be entered allowing the proposed amendment to the alternative writ, and thereupon directing the peremptory writ to issue, conformed to the alternative writ as amended. Ordered accordingly.