Bill in chancery to enforce the specific performance of an act supposed to be enjoined by statute. The bill was filed by the state against the Trustees of the Wabash and Erie Canal. An answer was filed; deposi-. tions were taken; the cause was submitted; and a decree for a specific performance was rendered.
The facts necessary to an understanding of the case, are few, and follow.
On the 19th of January, 1846, an act was passed by the legislature of this state, transferring to trustees, for the benefit of the creditors of the state, the Wabash omd Erie Canal. The act contains a great many provisions defining the terms, conditions, and objects of the transfer, with the various duties to be performed by the respective parties. The act was understood to be an arrangement or
"It shall be the duty of said trustees to take charge of said canal, with all its appurtenances, and canal lands and property, and adopt and put in execution such plans and measures as they shall deem most expedient for the prosecution and completion of said canal, with its necessary side-cuts and feeders, to JEvansville, within the period herein before prescribed.” And again, in the same section, it is said the trustees "shall do all the acts needful and proper in and about” "the completion of said canal to JEvcmsville, with necessary side-cuts and feeders, particularly the side-cuts and locks to the Wabash river, in sections 136 or 137, between Coal creek and Terre Haute, and on sections 33 or 34, and 46, as heretofore surveyed, between Coal creek and Lafayette, heretofore contemplated.”
On the 27th day of January, 1847, an act supplementary to the foregoing was approved, which contained this section:
“ And be it further enacted, that the said trustees shall, and it is hereby made their duty, to construct and complete all the feeders, feeder dams, side-cuts and reservoirs contemplated in this act and the act to which this is a supplement, contemporaneously with the construction and completion of the main canal: provided however, that where said canal has already been so constructed beyond any point where such feeders or side-cuts are located and intended to be constructed, as specified in the act to which this is a supplement, it shall be the duty of said trustees to construct and complete all such feeders and side-cuts within eighteen months from and after the acceptance of this act, by our bond-holders: "And be it further provided, that said side-cuts shall be constructed of the same capacity with 4he main canal.”
The canal was designed to be, and since constructed, is, a great commercial highway between the northern lakes and the Ohio river, a long link in the chain of internal water communication between the great southern and
Side-cuts consistent with, and promotive of the main design, were contemplated; and some supposed favorable locations for them indicated, before the main line of the canal was put in operation, and the question as to the sufficiency of the supply of water for purposes of navigation tested, and before the canal was transferred to its present owners.
As has been intimated, the canal was transferred by the state, upon a liberal consideration, to her creditors, who received it in the confidence that it would be a sure source of revenue to a given amount.
The main line of the canal had been constructed and long enough in operation, before this bill was filed, to demonstrate the fact that there is an insufficiency of water to render it navigable to the extent the business upon it demands, and that to construct the side-cuts would greatly impair its too limited usefulness by exhausting a portion of the present insufficient supply of water, would create a useless expense, and diminish the already deficient revenues of the whole work; would, in short, be injurious to both parties to the sale of the canal—the state and her creditors. On this ground the trustees refused to make the side-cuts. But notwithstanding the construction of these cuts would be detrimental to the interests of the people of the state generally and her creditors, it was supposed that it might be beneficial to a few persons at the termination of the cuts respectively, and this bill was filed to compel the trustees to prosecute the work for their benefit, and the question is, should a Court of equity decree the work to be done? We shall not elaborate our answer to the question. Even were the language of the statute imperative upon the trustees to make the cuts, it would be doubtful, under the changed circumstances, rendering it inexpedient that the cuts should be constructed, whether
We are told that by enlarging the size of the canal beyond that adopted by the state, and reconstructing a portion of what the state had completed, a supply of water might be furnished; but there is no express or implied obligation on the part of the trustees to incur the expense of such undertakings.
Nor would the construction of the side-cuts in question be Useful, even if the trustees should, for the purpose of improving the navigation of the main line of the canal, undertake its enlargement; for the business furnished by the side-cuts would never pay expenses.
The decree is reversed with costs. Cause remanded, with instructions to the Circuit Court to dismiss the bill.