61 Wis. 401 | Wis. | 1884
In October, 1859, the town of Waupun, in the county of Fond du Lac, and the town of Chester, in the county of Dodge, by the joint action of their boards of supervisors, attempted to lay out what was called in the petitions and orders a “ joint highway ” on or near the line
The highway was in many places, widely variant from the town line, but must be presumed to have been laid out “ as near thereto as the situation of the ground” admitted, and that the variation “ was deemed necessary ” according to the above statute. On this highway a bridge across the Rock river was necessary to be built and maintained, and if the highway was such, on the town line, as we hold it was, or a town line highway, then it follows that such bridge was a town line bridge, to be built and maintained jointly by the towns, the same as the highway. The language in sec. 1320, R. S. 1878, “or aiding in maintaining a bridge across such stream,” and the section in ivhich it occurs, were not then in force as statutory law. The provisions of said section, and subsequent sections relating to towns, cities, and villages bordering upon navigable or meandered streams, and building and maintaining bridges over the same, were first enacted as ch. 229, Laws of 1874. But the main body of that chapter relates to providing means by taxation and issuing bonds for the building and maintaining or aiding therein of such bridges. It does not in terms authorize towns to build and maintain jointly such bridges, or aid therein, but only for raising the necessary means for such purpose, implying that such right and duty existed without the statute. The statute only recognizes such right and duty, and provides the means for the same. A bridge across Rock
It follows that they were also authorized to determine what part of such bridge should be made and kept in repair by each town. Such part of the bridge could not be determined in any other way than by an apportionment of the expense incurred in building and maintaining it. At the same time when the highway was laid out, the supervisors of the two towns determined, by an order or agreement, the part of the highway to be made and kept in repair by each town, and apportioned the expense of building and repairing the bridge between the two towns. Said order or agreement was as follows: “At a meeting of the supervisors of the towns of Chester, in Dodge county, and Waupun, in Eond du Lac county, it was agreed by the said supervisors that the expense of building and repairing the bridge known as the county line bridge be apportioned to each of the said towns as follows: to the town of Waupun three fifths, and the town of Chester two fifths, of said expense; and the road laid out bearing even date herewith be divided as follows to keep in repair: the town of Waupun to take the west part to the second angle post, where it angles from the road known as the Clark road; the town of Chester the balance after it angles from said road.”
There had been a bridge at that point which had been destroyed, and so the bridge had to be built or rebuilt at considerable expense. To carry out this agreement, such expense for building the bridge was borne by the two towns according to the apportionment therein made. Several times since it has been repaired by the two towns according to such apportionment. Both towns in this way have practically construed the agreement just as its language so clearly expresses. At one time, the town of Waupun made the necessary repairs of the bridge, and presented to the town of Chester a bill for two fifths of the expense thereof, and said town allowed and paid it. .The agreement was not only thus practically construed and ratified, but the town of Chester is thereby estopped from questioning the agreement, or denying its liability under it. Kneeland v. Gilman, 24 Wis. 39; Houfe v. Fulton, 34 Wis. 608; Colby v. Beaver Dam, id. 285. But we have seen that it was the right or duty of these two towns to do just what they did do as to this bridge. The bridge finally became again out of repair. The town of Wav/pun notified the town of Chester of it, and to unite in repairing it. The town of Chester refused. The town of Waupun thereupon made the necessary repairs, and paid for
It is contended by the learned counsel of the respondent that the “ repairing ” mentioned in the agreement was only for the time being, or for the building and repairing of the old bridge, which had been destroyed when the agreement was made. Such a construction would fail to provide for maintaining the bridge in the future, and leave either one or both of said towns liable for not repairing it. The duty to keep the highway in repair is no more a continuing duty in this agreement than to repair the bridge. The question is too plain for discussion.
The only remaining question is the liability of the town of Chester in this action. There is no other remedy. Mandamus will not lie. State ex rel. Winslow v. Supervisors, 16 Wis. 613. The statute makes • no provision for an appeal to the county board in such a case. There is abundant authority and reason for maintaining such an action. It was the clear legal duty of the town of Chester to have joined with the town of Waupun in repairing the bridge without delay as soon as notified of its condition. The refusal to do so left the town of Waujrnn no alternative but to make the repairs at once, in the interest of the public and to avoid liability, and to pay the expense for the joint benefit. If Chester exercised no judgment or discretion in the repairs necessary to be made and the cost thereof, it was the solé fault of Chester. That town left the whole matter to the judgment and discretion of Waupun, and it cannot now complain1 unless such judgment or discretion was abused or fraudulently exercised. The town of Waupun has paid two fifths of the expenses for repairing the bridge to the use and for the benefit of the town of Chester, and there is an implied
The principles upon which the appellant’s cause of action depends were very recently recognized and established by this court in President and Trustees of West Bend v. Mann, 59 Wis. 69. In that case the owner of the land over which the highway passes cut a race-way across the road. It whs held that it was his duty to bridge it over, and, at the same time it was the duty of the village to keep it bridged for the use and safety of the public. The owner, on notice, refused to discharge this duty, and the village caused the raceway to be bridged at considerable expense. The action was by the village to recover this expense, and it was held that there was a right of recovery; and it was also held that inasmuch as the highway had been opened and worked and used by the public as such before the race-way was dug, and the owner of the land had once bridged it over, all irregularities in laying out the highway had been cured by the statute of limitations. A similar implied liability was recognized in Rockwood v. Woodford, 25 Wis. 443, in Depere v. Bellevue, 31 Wis. 120, and in Reed v. Jones, 8 Wis. 421. See, also, other authorities cited in the able brief of the appellant’s counsel, such as Doane v. Badger, 12 Mass. 65; Mumford v. Brown, 6 Cow. 475; Stevens v. Thompson, 17 N. H. 109; Pennsylvania R. R. Co. v. Duquesne Borough, 46 Pa. St. 223; Pottsville Borough v. Norwegian Township, 14 Pa. St. 543; and Brookline v. Westminster, 4 Vt. 224. These two last cases are very much in point. But the authorities to the same effect are too numerous to be cited. We think the plaintiff town showed a clear right to recover.
At the close of the plaintiff’s evidence the circuit court granted a nonsuit in the case, and, as we think, erroneously.
By the Court.— The judgment of the circuit court is reversed, and'the cause remanded for a new trial.