Tomlinson v. Clem (In re Clem)Tomlinson v. Clem (In re Clem)
CAME ON FOR TRIAL оn August 23, 2017 and October 11, 2017 (the "Trial"), the above-referenced Adversary Proceeding (herein so called) filed by LaDainian and LaTorsha Tomlinson (collectively, the "Plaintiffs-Creditors" or the "Tomlinsons"), in which the Plaintiffs-Creditors objected to the dischargeability of a debt owed to them by the Defendant-Chapter 7 Debtor, Steven Andrew Clem (the "Defendant-Debtor"), pursuant to section 523(a)(2)(A) of the Bankruptcy Code. The court has determined that the Plaintiffs-Creditors have established a nondischargeable debt, pursuant to section 523(a)(2)(A) of the Bankruptcy Code, as further set forth herein. The court issues these Findings of Fact and Conclusions of Law in support of this decision, pursuant to
I. INTRODUCTION.
The Adversary Proceeding is a nondischargeability action in which section 523(a)(2)(A) of the Bankruptcy Code is at issue. It involves a contract (the "Contract") entered into on April 30, 2015, between the Tomlinsons and Bella Vita Custom Homes, LLC ("Bella Vita"), for a $4,483,185.72 luxury, custom-built home (the "Home") in North Texas. The Defendant-Debtor was the "chief executive officer" of the homebuilder, Bella Vita, and was also the approximately 50% owner of Bella Vita (with his father and father-in-law collectively owning the remaining 50% of Bella Vita).
Things went significantly awry with the early construction efforts on the Home. Among other things, Bella Vita admittedly undertook undisclosed/unapproved construction changes. Specifically, Bella Vita made the decision to utilize helical steel piers on the large Home-something atypical and that the Defendant-Debtor and Bella Vita had no experience using in the past-instead of the concrete piers that were specified in the Contract's original design plans. Bella Vita made this decision after encountering subsurface water when drilling holes for the contemplated concrete piers (something that should have been foreseeable because of available reports), and after further realizing that the concrete piers would have to be "cased" because of instability in the holes Bella Vita had drilled. The Contract provided that any change in the building plans required written approval of the Plaintiffs-Creditors. Not only did Bella Vita not obtain written approval from the Plaintiffs-Creditors for the switch to helical piers (or disclose initially that helical piers were being substituted) but, while drilling for installation of the helical piers, Bella Vita and/or its subcontractors failed to locate and punctured a water line-causing extensive flooding on the building pad and adjacent land. The Tomlinsons learned (rather belatedly) about the flooding from a neighbor. In addition to these construction issues, the Tomlinsons grew frustrated with Bella Vita for its alleged failure to account for usages of the Tomlinsons' 10% initial deposit and subsequent draw requests. On August 7, 2015, after the Plaintiffs-Creditors had paid $655,318.57 toward the purchase price of the Home, they terminated the Contract. From there, the disputes between the Plaintiffs-Creditors and Defendant-Debtor escalated and evolved into many stаges.
Stage One: Prepetition Arbitration . On September 8, 2015, the Plaintiffs-Creditors filed a lawsuit against both Bella Vita and the Defendant-Debtor in the 153rd Judicial District Court of Tarrant County, Texas (the "State Court"). That court ordered the parties to participate in arbitration with the American Arbitration Association (the "Prepetition Arbitration"). The Plaintiffs-Creditors asserted numerous causes of action in the Prepetition Arbitration including at least the following: breach of contract/breach of warranty (Count A); negligence and malice/gross negligence
The Arbitration Award is somewhat confusing. It recited various instances in which Bella Vita and the Defendant-Debtor failed to comply with the Contract. More importantly (for purposes of this section 523(a)(2)(A) Adversary Proceeding), the Arbitration Award also recited various examples of false representations made by Defendant-Debtor (for example, the Defendant-Debtor falsely represented that he would put a full-time superintendent, full-time project manager, and full-time project liaison on the Plaintiffs-Creditors' job and he did not; and he represented that a builder's risk insurance policy had been purchased when, in fact, it had not ). The Arbitration Award stated that the evidence presented supported "both a breach of contract cause of action and a DTPA cause of action against Bella Vita ." Although the Plaintiffs-Creditors had cited in their "Statement of Claims" filed with the Arbitration Panel
Stage Two: The Bankruptcy Case and Questions About the Preclusive Effect of the Tomlinsons' Arbitration Award. The Defendant-Debtor filed a Chapter 7 bankruptcy case on December 14, 2016. Soon thereafter, the Plaintiffs-Creditors filed the above-referenced Adversary Proceeding. On May 25, 2017, the Plaintiffs-Creditors filed an Amended Complaint in this Adversary Proceeding,
The Defendant-Debtor soon thereafter filed a "Motion for Summary Judgment Based on Res Judicata Affirmative Defense,"
The Inapplicability of the Res Judicata Doctrine. Under res judicata, a final judgment on the merits of an action precludes the parties or their privies from relitigating claims that were or could have been raised in that action.
In Brown v. Felsen , a guarantor of the debtor's debt had obtained an agreed judgment against the debtor in a prepetition state court collection suit that had been brought by a lender against both the debtor and guarantor. The agreed judgment did not specify the cause of action on which the agreed liability was based (contribution and indemnity? fraud? something else?). When the judgment debtor later filed bankruptcy, the guarantor sought to have the debt declared nondischargeable on the basis that the debtor had engaged in fraud, deceit, and malicious conversion in connection with underlying indebtedness that the guarantor had guaranteed. The bankruptcy court held that res judicata precluded the guarantor from relitigating the nature of the debt and from offering further evidence beyond that offered in the state court. The Supreme Court disagreed, holding that the bankruptcy court was not confined to a review of the judgment and record in the prior state-court proceedings when considering the dischargeability of respondent's debt. The Supreme Court first noted the general proposition that res judicata prevents litigation of all grounds for, or defenses to, recovery that were previously available to the parties, regardless of whether they were asserted or determined in the prior proceeding and, thus, encourages reliance on judicial decisions, bars vexatious litigation, and frees the courts to resolve other disputes. But here, the litigants were not in the typical situation in which res judicata is raised-where a litigant might go into a new court and assert a new ground for recovery, nor was this the case of a litigant attacking the validity of a prior judgment. Rather, the guarantor was, essentially, attempting to meet the new "defense" of bankruptcy-which the debtor had interposed between the guarantor and the sum earlier determined to be due him. In summary, Brown v. Felsen made clear that a creditor who obtains a prepetition judgment that is not based on fraud is not barred by res judicata from objecting to the dischargeability of his judgment, pursuant to section 523 (and, thus, from alleging fraud in the section 523 context). Significantly, the Supreme Court noted that the Brown v. Felsen case concerned res judicata only, and not the narrower principle of collateral estoppel.
The Tougher Question of Applicability of the Collateral Estoppel Doctrine. As with the doctrine of res judicata, case law holds that findings in an arbitration award can have collateral estoppel effects.
Twelve years after Brown v. Felsen , the Supreme Court elaborated upon what it had merely hinted at in Brown v. Felsen , regarding the possible applicability of collateral estoppel in nondischargeability proceedings, in the case of Grogan v. Garner.
It should be noted, as a general principle, that, to determine whether a prior judicial fact finding from a state court or tribunal should be given collateral estoppel effect, a federal court must look to state law to determine the collateral estoppel effect (same as with res judicata).
The Fifth Circuit elaboratеd upon the applicability of the doctrine of collateral estoppel in dischargeability actions significantly in the case of Dennis v. Dennis .
Hence, in only limited circumstances may bankruptcy courts defer to the doctrine of collateral estoppel and thereby ignore Congress' mandate to provide plenary review of dischargeability issues. Collateral estoppel applies in bankruptcy courts only if, inter alia, the first court has made specific, subordinate, factual findings on the identical dischargeability issue in question-that is, an issue which encompasses the same prima facie elements as the bankruptcy issue-and the facts supporting the court's findings are discernible from that court's record. In re Davis ,, 115 (5th Cir.1993) ; In re Shuler , 3 F.3d 113 722 F.2d at 1256 . See In re Comer ,(9th Cir.1984) (ruling that bankruptcy courts should not rely solely on state court judgments when determining the true nature of a debt for dischargeability purposes if so doing would prevent the bankruptcy courts from exercising their exclusive jurisdiction to determine whether the debt is dischargeable); see also Browning v. Navarro , 723 F.2d 737 , 561 (5th Cir.1989) (providing that although the doctrine of res judicata is generally applicable to bankruptcy courts, the contours of the doctrine are "different for bankruptcy courts ... because tasks which have been delegated to [bankruptcy courts] by Congress may not be interfered with by the decisions of other courts ....[B]ankruptcy courts have a job to do and sometimes they must ignore res judicata in order to carry out Congress' mandate"). 887 F.2d 553 36
After applying this law, the Fifth Circuit held that the bankruptcy court was not precluded from going behind the state court and making its own finding, in the nondischargeability context, and that the bankruptcy court did not err in determining that the obligation of the debtor-husband to the ex-wife was in the nature of support (not a community property division) and was therefore nondischargeable under section 523(a)(5) of the Bankruptcy Code.
The Fifth Circuit has reiterated multiple times that issue preclusion will only prevent a bankruptcy court from determining dischargeability issues for itself if "the first court has made specific, subordinate, factual findings on the identical dischargeability issue in question ... and the facts supporting the court's findings are discernible from that court's record ."
The Fifth Circuit case of King is further instructive on these issues. In King , the plaintiffs in a nondischargeability action had obtained a state court judgment and the issue before the Fifth Circuit was whether its terms precluded the plaintiffs' section 523(a)(2)(A) claim. The details were that a jury had first returned a verdict
In exercising this court's "broad discretion" as to whether to apply collateral estoppel to the arbitral findings in the case at bar,
One problem with arbitration proceedings generally is that they are not courts of record. This is perhaps why courts of appeal have opined that courts have broad discretion in determining whether to give arbitral findings collateral estoppel effect.
In summary, this court denied both parties' motions for summary judgment
Stage Three: The Big Reveal; Bella Vita Had Some Insurance Coverage. Soon after the motions for summary judgment were denied, the court set this Adversary Proceeding for an evidentiary Trial.
To put this into full context, one of the many assertions of "false representations" that the Tomlinsons have asserted against Bella Vita and the Defendant-Debtor in this Adversary Proceeding is that they knowingly and falsely represented that both builder's risk and general liability insurance policies "would be purchased for the construction of the [Tomlinsons'] home"; that Bella Vita "did not obtain any insurance policies"; and that, as a result, the Tomlinsons were "unable to collect their judgment from" Bella Vita or the Defendant-Debtor.
Builder shall provide and maintain at all times, Builder's Risk Insurance as protection against fire, storm, theft or vandalism during the course of construction of the Home in an amount equal to or greater than the Contract Sales Price. Builder shall include Owner as additional insured.71
This requirement of a Builder's Risk Insurance policy was reiterated at paragraph 19 of the Contract with slightly broader terms as to what needed to be covered-i.e., insurance to cover the cost of construction of the house in the event of "destruction of the improvements by fire, earthquake, explosion, hail, windstorm, or any other casualty prior to completion and Owner's occupancy.
Builder shall, at its own expense, during the entire period of Work, carry ... commercial general liability insurance (including contractual liability coverage) necessary for the full protection of Builder and Owner from injury to persons or property arising from the acts of the Builder or its subcontractors during the progress of the Work with limits of at least $1,000,000 per occurrence.73
Such paragraph went on to provide that "Certificates of insurance shall be delivered to Owner ... prior to the Initial Closing Date [not a defined term] and that each policy shall provide "for Owner to be named as an additional insured on the commercial general liability insurance policy."
To be clear, both the Contract and the Plaintiffs-Creditors, in this Adversary Proceeding, made the topic of insurance a very significant issue. It was not just that it appeared that the Tomlinsons had been charged for a builder's risk policy that had never been purchased for their Home, but the Tomlinsons started Trial believing there was apparently no insurance of any kind to potentially cover their contractual and property damage claims (such as the significant water damage that ended up occurring). And the Plaintiffs-Creditors and their counsel had good reason to believe that there was no insurance. Why? The Plaintiffs-Creditors' counsel had served written discovery on Bella Vita and the Defendant-Debtor prepetition, inquiring about the topic of insurance.
REQUEST FOR PRODUCTION NO. 3
To identify and produce a copy of any and all insurance policies, certificates ofinsurance, declaration pages and contracts that relate to insurance, worker's compensation insurance that relate to this lawsuit and any document or memorandum evidencing the existence of insurance in effect on the date of the occurrence made the basis of this lawsuit.
RESPONSE:
Respondent objects to this Request because it and the other 178 Requests propounded by Claimants are unduly burdensome, are not proportional to the needs of the case, and were served solely for the purpose of harassment. Respondent objects to this Request because it is overbroad, harassing, not reasonably limited in time or scope, and not reasonably calculated to lead to discoverable evidence. Respondent further objects to this Request because it seeks information and documents that are irrelevant to the claims and defenses to this lawsuit. Subject to and without waiving the foregoing objections, Respondent identified no responsive documents .76
REQUEST FOR PRODUCTION NO. 4
To identify and produce any and all excess or umbrella insurance policies or documents or memorandum evidencing the existence of insurance in effect on the date of the occurrence made the basis of this lawsuit.
RESPONSE:
Respondent objects to this Request because it and the other 178 Requests propounded by Claimants are unduly burdensome, are not proportional to the needs of the case, and were served solely for the purpose of harassment. Respondent objects to this Request as vague and confusing insofar as it seeks documents and information "in effect on the date of the occurrence [that] made the basis of this lawsuit" because there is not one occurrence that made the basis of this lawsuit and this Request fails to identify the information sought with reasonable particularity. Respondent further objects to this Request because it is overbroad, unduly burdensome, harassing, not reasonably limited in time or scope, and not reasonably calculated to lead to discoverable evidence. Respondent further objects to this Request because it seeks information and documents that are irrelevant to the claims and defenses to this lawsuit. Subject to and without waiving the foregoing objections, Respondent identified no responsive documents.77
In addition to Requests for Production 3 and 4 set forth above, there were four other Requests for Production aimed at obtaining information regarding insurance coverage.
When the Defendant-Debtor attempted to introduce evidence that Bella Vita had commercial liability and excess umbrella liability insurance policies, as required by the Contract, on the first day of Trial, the Plaintiffs-Creditors' counsel immediately pulled out these discovery responses and objected-crying foul that the Defendant-Debtor had never before disclosed them. The Defendant-Debtor and his counsel reacted with all sorts of plausible deniability. First, the Defendant-Debtor stated that he thought that insurance policies had, in fact, been produced in prior depositions handled by his prior lawyers at the law
Moreover, the court expressed that the Defendant-Debtor and his counsel could not skirt the issue by simply blaming the prepetition nondisclosure of insurance on the Defendant-Debtor's prior counsel-because the nondisclosure had persisted post petition. Rule 26(a) of the Federal Rules of Civil Procedure applies in this Adversary Proceeding. It states that:
(a) Required Disclosures .
(1) Initial Disclosure.
(A) In General . Except as exempted by Rule 26(a)(1)(B) [not applicable] or as otherwise stipulated or ordered by the court, a party must without awaiting a discovery request, provide to the other parties: ... (iv) for inspection and copying as under Rule 34, any insurance agreement under which an insurance business may be liable to satisfy all or part of a possible judgment in the action or to indemnify or reimburse fоr payments made to satisfy the judgment (emphasis added).82
It is clear from the record that the parties and counsel never stipulated (and this court never ordered) that this provision of Rule 26(a) would not apply. In this Adversary Proceeding (as with all adversary proceedings in this District), an "Order Regarding Adversary Proceedings Trial Setting and Alternative Scheduling Order" (hereinafter, the "Alternative Scheduling Order") was issued immediately following the filing of the Adversary Proceeding.
So, in summary, Rule 26(a), the Alternative Scheduling Order and the Joint Discovery Plan collectively required that all insurance policies that might be applicable to the claims in this Adversary Proceeding had to be exchanged with the Tomlinsons by May 24, 2017. This did not happen. Moreover, exhibits that might be used at trial had to be exchanged 14 days prior to the August 2017 trial docket call. This did not happen. The Witness and Exhibit List timely filed by the Defendant-Debtor on July 31, 2017
After this all came out the first day of Trial, the court pressed further for information on why the insurance policies that Bella Vita did have apparently had never been disclosed to the Tomlinsons or their counsel until now. Besides the explanations earlier mentioned, the Defendant-Debtor suggested that he did not think it really mattered-as far as he knew commercial general liability insurance would not cover any of the Tomlinsons' damages.
The court ultimately adjourned and continued the Trial two months to October 11, 2017, to allow the parties timе to investigate the scope of the insurance policies. The court also later held a status conference with the Chapter 7 bankruptcy trustees of both the Defendant-Debtor and Bella Vita bankruptcy estates-to make sure they knew there was insurance that may or may not cover the Tomlinsons' and other creditors' claims. The court expressed that the false statements in the past concerning the insurance-and failure to comply with Rule 26(a) and orders of this court-might impact the damages in
Stage Four: The Second Day of Trial in the Section 523 Adversary Proceeding.
After a bankruptcy case status conference was held on September 29, 2017, to address with the bankruptcy trustees the insurance policies-and the prospect that such policies might provide coverage for some of the Tomlinsons' claims and the claims of others who had problems with their homes that Bella Vita had contracted to build-the court resumed the Trial in this matter on October 11, 2017. To be clear, the sole scope of this second day of Trial would be to hear evidence regarding Bella Vita's insurance policies that had never-in almost two years of litigation with the Tomlinsons-been disclosed to them. On October 11, 2017, the Defendant-Debtor continued with his theme of plausible deniability on the subject of the nondisclosure of the insurance. While his deniability at times seemed potentially plausible, the court was not convinced that the Defendant-Debtor was being wholly candid on the subject.
At the beginning of the second day of Trial, the court received evidence that reflected that, as early as January 2016, the Tomlinsons' legal counsel was asking Bella Vita's and the Defendant-Debtor's legal counsel (the Bell Nunnally law firm) for a list of Bella Vita's insurance policies, and Bell Nunnally was passing along this and other requests by email to the Defendant-Debtor and his father, Mike Clem.
The court also heard reports that the Tomlinsons' lawyer has now made a claim on Bella Vita's insurance but, as of the second day of Trial, had not heard back regarding whether coverage will be granted. The court conducted a follow up status conference on December 18, 2017. At that hearing, it was reported that the insurance company had subsequently responded with three reasons for denial of coverage on any of the Tomlinsons' claims, one of which was that the request for coverage was "untimely." The bankruptcy trustee and Tomlinsons are continuing to pursue this matter with the insurance company.
On balance, the court does not accept as credible the Defendant-Debtor's position that he really was never aware that the Tomlinsons' wanted to know about insurance or that insurance had any significance in this whole litigation. For one thing, the Defendant-Debtor's reactions on the subject changed slightly from the first day of Trial to the second day of Trial. On the first day of Trial, the Defendant-Debtor stated that the subject of insurance came up at a prepetition deposition and that the Tomlinsons' counsel was given copies of the insurance then (which was not corroborated and, in fact, was credibly denied by the Tomlinsons' counsel). Then on the second day of Trial, the Defendant-Debtor was quietly adamant that he never knew that the Tomlinsons' were inquiring about insurance and it never occurred to him that it was in any way relevant to their lawsuit. The court cannot believe that lawyers at Bell Nunnally completed and submitted answers to the Requests for Admission with no input or awareness from the Defendant-Debtor. The court cannot believe that the Defendant-Debtor never realized until a day or so before the first day of Trial in this Adversary Proceeding that the Tomlinsons had complained that the Defendant-Debtor and Bella Vita had fraudulently misrepresented that there would be insurance for their Home project-including general liability that covered contractual liability and an umbrella policy. The court has no way of knowing what the Defendant-Debtor's exact motivation might have been to conceal the insurance. Was he worried about claims being made on his insurance policies and the ramifications to him and his business if that happened? The court can only speculate. But the court believes, based on the totality of the evidence and the unconvincing answers provided by the Defendant-Debtor, that the late-revealed insurance in this Adversary Proceeding is just one more example of a pattern of concealment engaged in by this Defendant-Debtor vis-à-vis the Tomlinsons. The court believes the Defendant-Debtor kept silent about the insurance when it seemed convenient and advantageous to him to do so.
The court discussed with counsel and the parties after the second day of Trial that it felt compelled to consider sanctions-likely in the form of attorney's fee shifting-for the prolonged nondisclosure of insurance. This court believed that the Tomlinsons might have focused their efforts on insurance-collection issues ear
This court has reviewed these fees. The court concludes that all of the fees and expenses incurred between May 25, 2017 (the date Plaintiffs first asserted their section 523 claim in this Adversary Proceeding) and August 23, 2017 (the date they learned about the insurance) should be reimbursed by Defendant-Debtor. Other fees and expenses submitted appeared to be related to the bankruptcy case more generally. The fees and expenses during this time frame totaled $29,440.51. However, it appears that one of the timekeepers (associate-attorney Beau Powell) was billed at a $450 per hour rate during that time frame when his actual billing rate was represented to be $275 per hour.
Stage Five: Rule 15(b)(2) Motion for Leave to Amend Complaint.
Finally, at the end of the second day of Trial, the court observed that a couple of issues and theories had evolved over the course of Trial (and/or had developed in the evidence) that had not specifically been articulated in the Plaintiffs-Creditors' live complaint or other pre-trial pleadings. First, the issue with regard to the insurance. Specifically, the Plаintiffs-Creditors originally pleaded that the Defendant-Debtor and Bella Vita had misrepresented that they had insurance when they did not .
Rule 7015 of the Federal Rules of Bankruptcy Procedure adopts Rule 15 of the Federal Rules of Civil Procedure to adversary proceedings. Rule 15(b)(2) provides:
When an issue not raised by the pleadings is tried by the parties' express or implied consent, it must be treated in all respects as if raised in the pleadings. A party may move-at any time, even after judgment-to amend the pleadings to conform them to the evidence and to raise an unpleaded issue. But failure to amend does not affect the result of the trial of that issue.
While this court acknowledges that implied consent is not to be lightly inferred,
Additionally, even if Rule 15(b)(2) does not permit an amendment here, the court notes that, under Rule 15(b)(1), "If, at trial, a party objects that evidence is not within the issues raised in the pleadings, the court may permit the pleadings to be amended. The court should freely permit an amendment when doing so will aid in presenting the merits and the objecting party fails to satisfy the court that evidence would prejudice that party's action or defense on the merits." The Defendant-Debtor wholly failed to satisfy the court in his various arguments that any evolving theories or evidence presented at Trial by the Plaintiffs-Creditors prejudiced the Defendant-Debtor's defense on the merits. And the court believed that permitting the amended pleadings aided in the overall presentation of the merits in this Adversary Proceeding.
Based on the foregoing, the court permitted the post-Trial amendment of Plaintiffs-Creditors' complaint.
Having presented above the procedural background and various issues the court had to address before ruling on the merits, the court now renders its findings of fact and conclusions of law based on the evidence.
II. FINDINGS OF FACT.
A. The Two-Year Courtship of the Plaintiffs-Creditors by the Defendant-Debtor.
1. The Plaintiffs-Creditors
2. The Defendant-Debtor is a gentleman in his thirties and attended Baylor University. During college, he interned for Pulte Homes in Austin, Texas (focusing on homes ranging between $400,000 to $800,000) and later at a company called Jacobs Custom Homes in Georgetown, Texas (working 25% on custom homes and 75% on retirement "active adult homes"). The Defendant-Debtor eventually moved to Dallas, Texas and helped manage his father-in-law's concrete plant for a couple of years. Then, in 2011, the Defendant-Debtor formed Bella Vita. Bella Vita started with only the Defendant-Debtor, his father, father-in-law, and one other individual. The Defendant-Debtor was the CEO and his father was CFO. Bella Vita eventually grew in size and according to the Defendant-Debtor, built 150 custom homes over its history.
3. Mr. Tomlinson is a well-known retired National Football League player and T.V. Network commentator. Mrs. Tomlinson, among other things, owns a business in California with 42 employees and is CEO of a charitable foundation. One of Bella Vita's sales associates, James Thokey, had a friend that was а friend of Mr. Tomlinson. James Thokey and the Defendant-Debtor discussed courting Mr. Tomlinson to let Bella Vita build a home for him, thinking it could be "a hallmark home for us" and "would be an expensive home," and Mr. Tomlinson was "a well-known person."
4. The Defendant-Debtor, during about a one-and-a-half year period, had continued follow up with the Tomlinsons, having meetings and dinners. He described Mr. Tomlinson as "an upstanding guy" and Mrs. Tomlinson as "a good person, too" although he would "disagree with a lot of her statements."
5. During his interactions with the Tomlinsons, the Defendant-Debtor made numerous representations to the Plaintiffs-Creditors (collectively, the "Defendant Representations") including that:
a. Bella Vita would obtain general liability and builder's risk insurance policies for the construction of the Home;
b. Bella Vita was highly qualified and fully able to design and construct the Home;
c. All work performed by Bella Vita on the Home would be performed in accordance with first-class custom home building practices;
d. All work performed by Bella Vita on the Home would be in compliance with design plans;
e. Bella Vita would use the highest quality materials on the Home;
f. Bella Vita would appoint a full-time superintendent and full-time project manager to the project; and
g. Bella Vita would assign James Thokey to serve as the Plaintiffs-Creditors' personal liaison to coordinate design selections
6. Of particular importance to the Plaintiffs-Creditors was where the money that would be paid for their home construction project would be spent. With regard to this point, Mrs. Tomlinson credibly testified that she had some prior experience with custom home building, as she had built multi-million dollar homes in both California and Austin, Texas.
7. In September 2014, the Plaintiffs-Creditors, in anticipation of signing a written contract with Bella Vita, made a payment to Bella Vita in the amount of $448,318.57 (the "Initial Deposit"). Their Home would be an 18,000 square foot home.
8. However, it was not until April 30, 2015 that the Plaintiffs-Creditors entered into a New Construction Build on Your Lot Agreement (the "Contract") with Bella Vita for the construction of the Home. The
B. Key Terms of the Contract.
9. Unfortunately, while a great deal of time and effort was spent by the Plaintiffs-Creditors and the Defendant-Debtor in negotiating the Contract, the Contract itself is not a model of clarity-to put it kindly. In addition to awkward wording and cumbersome numbering in places, capitalized terms are frequently used (suggesting significance) without actually being defined terms. In any event, the entire set of documentation that constituted the Contract between the Plaintiffs-Creditors and Bella Vita consisted of: (a) a 10-page written document entitled "Bella Vita Custom Homes New Construction Build on your Lot Home Agreement," signed April 30, 2015 by the Defendant-Debtor as the designated representative of Bella Vita; (b) a one-page attachment thereto dated September 18, 2014, entitled "Bella Vita Custom Homes: Estimated Budget & Draw Schedule"; (c) an 11-page Exhibit A thereto consisting of certain specifications, cost allocations and allowances for the Home project; (d) a complete set of construction plans and drawings (the "Final Plans")
10. The Contract does actually contain a few noteworthy defined terms in Paragraph 3. For example:
Change Order: Approved contractual document stating materials/items/allowances to be added to Home per Owner's request, which to be binding on Builder and Owner must be in writing and signed by Builder and Owner.
Allowances: Amounts set forth in Exhibit A covering materials for the Improvements that are specified as "Allowance" items.
Draw: Builder's ability to request dollars to be paid by Owner for work completed to date.
Selection Sheet: Builder's document stating all material that Owner selects and approves.
Work: All labor, materials, equipment and services necessary to construct the Improvements on the Property, including plans specified in the preceding subparagraph to be prepared by Builder subject to the final approval of the Owner.122
11. The "Contract Sales Price" is set forth in paragraph 5 of the Contract and is shown to be $4,483,185.72, as set forth in Exhibit A attached to the Contract, "and shall cover, regardless of the actual amounts incurred for the following, all of the expenses of Builder necessary, required, or actually incurred to complete the Work, including, without limitation, (i) the cost of all materials, supplies and equipment to be incorporated into the Work; (ii) payment by Builder to its subcontractors
12. The Contract provided, in a paragraph entitled "Escrows,"
13. The Defendant-Debtor repeatedly referred in testimony to the Contract as a "fixed-price contract" and seemed to suggest that the requirement of providing Draw Requests or other evidence of funds spent was not very significant (particularly with regard to the Initial Deposit).
14. The Contract at paragraph 7.A.3, last sentence, states that "Builder shall make no changes to the Improvements or alterations from the Construction Documents executed by Owner, unless agreed in writing by Owner, at Owner's sole and exclusive option ."
15. The Contract at paragraph 9.C. provides that the Defendant-Debtor agrees to build the Home "in accordance with first-class, custom home industry standard building practices ... and otherwise substantially in compliance with the Final Plans and the Construction Documents, including, without limitation, the customer selection sheet and customer change orders, if any. However, Owner agrees Builder may substitute materials of similar quality, but only with the prior written consent of Owner. "
16. Furthermore, the Contract at paragraph 9.J. provides that "Builder shall provide
17. Additionally, paragraph 26 of the Contract contains what has been referred to as an "entireties" clause. Specifically, it provides that the Contract and its attachments:
constitutes the entire agreement between the parties and all prior negotiations, promises and/or representations, whether oral or written, not expressly set forth herein, are of no force and effect and do not constitute a part of this Contract. Owner represents to Builder that Owner has not relied and is not relying upon any warranties, promises, guaranties, or representations made by Builder ... except as contained in this Contract.138
18. Finally, on the last page of Exhibit A, which is attached to the Contract, under "Bella Vita Custom Homes Additional Expenses," there is a line item for "On-Site Project Manager, Vendor, Budget and Accounting Management throughout 2-year build," with an associated expense of $118,087.14.
C. Construction Commenced on the Home and Problems Ensued
1. Failure to Provide Dedicated Personnel That Were Promised.
19. Once the Contract was finally signed and construction of the Home began, problems began to arise. First, the Plaintiffs-Creditors' full-time promised personal liaison, James Thokey (the individual who knew a friend of Mr. Tomlinson's and had initiated the original contacts with the Tomlinsons), relocated to Austin, shortly after the Contract was
2. Draw Requests Made Without Actual Cost Information, Invoices, or Other Required Documentation.
20. More problematic to the Tomlinsons, within almost a month of signing the Contract, the Plaintiffs-Creditors began receiving draw requests from Bella Vita for more funds: (a) even after paying Bella Vita the Initial Deposit of $448,318.57; and (b) without being presented an adequate accounting of how funds had been spent on their Home project thus far. As earlier noted, the Contract required significant financial documentation to be submitted in connection with draw requests.
21. However, just three weeks later on June 23, 2015, Mike Moss sent the Plaintiffs-Creditors a second draw request for $138,690, to complete all the draw requests for the "Site Prep."
3. The Subsurface Water, Helical Piers, and Water Main Puncturing Fiasco.
22. Meanwhile, sometime in early to mid-July 2015, while drilling for the installation of concrete piers (as provided for in the Contract and in the preliminary foundation plans for the Home, as designed by the engineer hired by Bella Vita, Eric Davis),
23. Upon discovering this problem, the Defendant-Debtor, without either notice to or the written consent of the Plaintiffs-Creditors, as required under the terms of the Contract, made the decision to install steel helical piers in place of the concrete piers after consulting with Bella Vita's engineer on the project, Eric Davis.
25. Upon learning of the flooding from their neighbor, the Plaintiffs-Creditors drove over to the Lots and they saw "things sticking out of the ground" (i.e. , the helical piers). The Plaintiffs-Creditors then had a meeting with Mike Moss (Bella Vita's vice president of construction) and Chase White (the Tomlinsons' dedicated full-time project superintendent) a few days later and it was at that point that they learned about the change in the pier type.
26. Importantly though, Mrs. Tomlinson credibly testified that, had the Plaintiffs-Creditors been approached about the change in pier type, they would not have approved their installation.
27. Mrs. Tomlinson credibly testified that, upon cancelling their contract with Bella Vita, they hired their own engineers (Tom Witherspoon and Sunjong Engineering), and they did not recommend the use of helical piers for the Lots, but rather steel-cased concrete piers, and, in fact, that is the type of pier that was installed by the new builder that was hired to construct the Home after Bella Vita was terminated.
4. More Failures to Provide Adequate Cost Information.
28. Around the same time the pier issue and the site flooding arose, the Plaintiffs-Creditors also began to send additional emails to the Defendant-Debtor and Bella Vita requesting further accountings of where the money tendered by the Plaintiffs-Creditors was being spent. To be clear, during the period that Bella Vita was constructing the Home, the Plaintiffs-Creditors had tendered to Bella Vita $655,318.57 (collectively, the $448,318.57 Initial Deposit plus the two draw requests of $68,310 and $138,690).
29. First, on August 5, 2015, Mrs. Tomlinson sent the Defendant-Debtor a rather lengthy email asking, among other things, "where is my initial 10% deposit?"
[r]emember the draw scheduled does not precisely coordinate with the costs of the home... it is impossible especially with a fixed price contract. After reviewing the attachments, I believe you will have a clearer understanding. I am happy to speak with your CPA and familiarize him as well. Per your statement in red, this is accurately complying. So you can see your deposit has been heavily utilized and until we receive the next draw, we are at complete depletion and will be underfunded on the geothermal, cables, and soon more concrete in the next few days.174
In closely examining the attached "reconciliation," however, there appears to have been a lack of full disclosure on, at least, where the Initial Deposit had been spent. Specifically, adding up amounts on this
5. No Builder's Risk Insurance Policy.
30. As noted a couple of times herein, the Tomlinsons received certain documents during the course of dealing with Bella Vita indicating that a Builder's Risk Insurance Policy had been purchased with their Initial Deposit.
31. The court was not presented with any expert evidence regarding when a Builder's Risk Insurance Policy is typically purchased by builders or whether it might cover damage from flooding caused by a contractor striking a water main. However, the court knows a misrepresentation when it sees one, and the court finds that the Plaintiffs-Creditоrs' Exhibit 5, Plaintiffs-Creditors' Exhibit 13-109, and the Defendant-Debtor's Exhibit 6 falsely implied that Bella Vita spent $22,415.93 of the Tomlinsons' Initial Deposit on a Builder's Risk Insurance Policy.
D. Termination of the Contract by the Plaintiffs-Creditors, the Prepetition Arbitration and Resulting Arbitration Award, and the Filing of the Adversary Proceeding.
32. On or around August 7, 2015, the Plaintiffs-Creditors sent a letter through their then attorney, Bill Miller, terminating the Contract with Bella Vita. Then, on September 8, 2015, the Plaintiffs-Creditors, through their new attorney, Van Shaw, sent two more letters to Bella Vita demanding $1,310,637.14 in compensation based upon Bella Vita's violations of the terms of the Contract, the DTPA, and Chapter 27 of the Texas Property Code.
33. On September 8, 2015, the Tomlinsons filed their Original Petition and Jury Demand in the 153rd Judicial District Court against Steven Clem and Bella Vita in Tarrant County District Court (the "State Court Action").
34. On November 12, 2015, the 153rd Judicial District Court granted the Defendant-Debtor's Motion to Compel Arbitration and Dismiss. Thereafter, the Tomlinsons submitted their claims (as set forth in the Plaintiffs' Second Amended Statement of Claims) to arbitration with the American Arbitration Association (the "Prepetition Arbitration").
35. On September 26, 2016, the Plaintiffs-Creditors were awarded damages by the arbitration panel (the "Arbitration Panel") against both the Defendant-Debtor and Bella Vita, jointly and severally, in the amount of $744,711-which was later adopted into a Final Judgment Confirming Arbitration Award on September 30, 2016 (the "Arbitration Award").
36. The Defendant-Debtor filed a chapter 7 bankruptcy on December 14, 2016. On that same date, Bella Vita also filed a chapter 7 bankruptcy.
37. On April 3, 2017, the Plaintiffs-Creditors filed the Adversary Proceeding against the Defendant-Debtor objecting to the Debtor's discharge pursuant to section 727(a)(4) of the Bankruptcy Code.
38. On May 25, 2017, the Plaintiffs-Creditors filed their First Amended Complaint, which in addition to the section 727(a)(4) claim, asserted that the Arbitration Award was nondischargeable pursuant to section 523(a)(2)(A) of the Bankruptcy Code.
39. At trial docket call on August 14, 2017, the parties indicated that the Plaintiffs-Creditors would not be going forward on their section 727 claim, but would only be asserting their section 523(a)(2)(A) cause of action at trial.
1. Bankruptcy subject matter jurisdiction exists in this Adversary Proceeding pursuant to
2. The Plaintiffs-Creditors have brought a claim against the Defendant-Debtor under section 523(a)(2)(A) of the Bankruptcy Code. The standard of proof in any action under section 523(a) of the Bankruptcy Code is preponderance of the evidence.
3. " Section 523(a)(2)(A) is not designed to protect debtors; rather it is designed to protect the victims of fraud."
4. Section 523(a)(2)(A) of the Bankruptcy Code provides that:
A discharge under section 727... of this title does not discharge an individual debtor from any debt for money, property, services, or an extension, renewal, or refinancing of credit, to the extent obtained by false pretenses, a false representation , or actual fraud , other than a statement respecting the debtor's or an insider's financial condition.185
Here, the Plaintiffs-Creditors have argued that the Defendant-Debtor made numerous "false representations" to the Plaintiffs-Creditors both before and after the Contract was signed.
5. As a preliminary matter-before the court even gets to the issue of whether there is a nondischargeable debt in this case, pursuant to section 523(a)(2)(A) of the Bankruptcy Code -the court must address whether there is actually a "debt" of the Defendant-Debtor -in other words, a basis to impose personal liability upon the Defendant-Debtor, when it was Bella Vita, a Texas limited liability company ("LLC"), that actually contracted with the Plaintiffs-Creditors. To be clear, if there is no debt to begin with, as to the Defendant-Debtor , then there is no debt to discharge-much less a debt to except from discharge.
A. Must the Plaintiffs-Creditors-as a Prerequisite to this Section 523(a) Nondischargeability Action-Establish Grounds to Pierce Bella Vita's Entity-Veil, Pursuant to Sections 21.223, 101.002 and 101.114 of the Texas Business Organizations Code ? Or is the Joint and Several Liability Set Forth in the Arbitration Award-Based Upon Unspecified DTPA Violations-Dispositive of There Being a "Debt" of the Defendant-Debtor, for Purposes of Section 523(a)(2)(A) of the Bankruptcy Code ?
6. Here, of course, the Defendant-Debtor was the manager and majority member of Bella Vita, an LLC. Again, it was Bella Vita that contracted with the Plaintiffs-Creditors, not the Defendant-Debtor personally. Pursuant to the Texas Business Organizations Code, managers and members of an LLC are generally not individually liable for the contractual debts of the LLC (nor those debts relating to contractual debts), unless there is a finding that the manager/member used the LLC to perpetrate an actual fraud on a creditor, primarily for the direct personal benefit of the member/manager.
7. The knee-jerk answer to the above-posed questions may seem to be an obvious "yes" there is a "debt" as to the Defendant-Debtor, and there is no need to engage in a veil-piercing analysis-simply because of: (a) the terms of the Arbitration Award, and (b) its underlying basis (i.e., the DTPA-which is an "other applicable statute" as contemplated by
8. To understand why the Defendant-Debtor was imposed with personal liability under the Arbitration Award-and why this court believes there is a question here as to the pertinence of the veil-piercing provisions of the Texas Business Organizations Code-onе must dissect a bit both the DTPA and the Arbitration Award. The relevant provisions of the DTPA are sections 17.46(b) (under the heading "Deceptive Trade Practices Unlawful") and section 17.50 (under the heading "Relief for Consumers"). First, under section 17.50(a) of the DTPA only a "consumer" has standing to maintain a private cause of action under these provisions of the DTPA. The Plaintiffs-Creditors were undeniably "consumers."
9. As noted earlier in the discussion of collateral estoppel, the Arbitration Award is not a model of clarity (and very little in the way of a record from the Prepetition Arbitration was submitted into evidence). However, we know that the Plaintiffs-Creditors alleged, in their Second Amended Statement of Claims submitted to the Arbitration Panel, more than a half-dozen common law and statutory causes of action including at least the following: breach of contract/breach of warranty; negligence and malice/gross negligence; negligent misrepresentation; violations of approximately ten provisions of the DTPA-of which eight constituted False, Misleading, or Deceptive Acts and two constituted Alternative DTPA Acts; fraud and fraud in the inducement or by nondisclosure; fraud in a real estate transaction; unconscionable, knowing, or intentional course of action; conversion; and various other doctrines or remedies were pleaded (estoppel, alter ego, and joint enterprise). The Arbitration Award ultimately determined that there was evidence to sustain just a breach of contract cause of action and unspecified DTPA violations and the Arbitration Panel awarded economic damages jointly and severally against Bella Vita and the Defendant-Debtor for the DTPA violations. The Arbitration Award states that the actions of Bella Vita and the Defendant-Debtor did "not constitute a knowing
10. In summary, all that is clear is that the Arbitration Panel believed that: (a) certain false statements and certain actions taken without the Plaintiffs-Creditors' written consent constituted unspecified DTPA violations-for which both Bella Vita and the Defendant-Debtor should be held jointly and severally liable; and (b) only economic damages should be awarded-not mental anguish damages-because the Arbitration Panel was not persuaded that "knowing" violations of the DTPA had occurred.
11. With this backdrop, the court struggles somewhat in determining whether the Plaintiffs-Creditors should be required to pierce the entity-veil of Bella Vita here, pursuant to Texas Business Organizations Code section 21.223, in order for this court to find a "debt" owing by the Defendant-Debtor to the Plaintiffs-Creditors that may, in turn, be nondischargeable. On the one hand, section 21.225 explicitly recognizes that, if there is a statutory basis to hold a member/manager liable for an LLC obligation to a creditor, then section 21.223 does not apply . The DTPA may just be that statutory basis here.
12. On balance, the court believes that the Arbitration Award, imposing personal liability on the Defendant-Debtor pursuant to some provision of the DTPA-albeit an unspecified provision-makes the situation at bar fall within the ambit of section 21.225 of the Texas Business Organizations Code and, thus, there is an "applicable statute" that makes the Defendant-Debtor liable on a "debt" of the LLC. Thus, the court simply needs to analyze: (1) whether some portion of the "debt" owed by the Defendant-Debtor (pursuant to the Arbitration Award) constitutes a debt for money obtained by false pretenses, a false representation, or actual fraud; and (2) whether such debt is, therefore, nondischargeable pursuant to section 523(a)(2)(A)'s legal standards.
B. What are the False Pretenses, False Representations, or Actual Fraud That Occurred?
1. The Plaintiffs-Creditors' Fraud Claim.
13. In their First Amended Complaint, the Plaintiffs-Creditors have
14. Additionally, to the extent there is not an actual material misrepresentation at issue, but rather silence or concealment by a party, fraud may, nonetheless, still be present under a fraud by nondisclosure cause of action. Fraud by non-disclosure is a subcategory of fraud because, where a party has a duty to disclose, the non-disclosure may be as misleading as a positive misrepresentatiоn of the facts.
15. In order to prove fraud by nondisclosure, the Plaintiffs-Creditors must show that the Defendant-Debtor: (1) concealed or failed to disclose a material fact within his knowledge; (2) knew that the Plaintiffs-Creditors were ignorant of the fact and did not have an equal opportunity to discover the truth; (3) intended to induce the Plaintiffs-Creditors to take some action by concealing or failing to disclose the fact, and (4) the Plaintiffs-Creditors suffered injury as a result of acting without knowledge of the undisclosed fact.
16. The Plaintiffs-Creditors assert that the Defendant-Debtor made numerous material false representations with the intent of deceiving the Plaintiffs-Creditors. Specifically, the Plaintiffs-Creditors allege that the Defendant-Debtor's misrepresentations include, but are not limited to:
a. Misrepresenting that the Defendant-Debtor's company was qualified to perform the work under the contract with the Plaintiffs-Creditors;
b. Misrepresenting that the work would be performed in a good and workmanlike manner;
c. Misrepresenting that the work would be performed in accordance with first-class custom home building practices;
d. Misrepresenting that the work would be in compliance with design plans;
e. Misrepresenting the source of the design plans;
f. Misrepresenting that a Builder's Risk Policy was in place on the Plaintiffs-Creditors' project, and charging the Plaintiffs-Creditors for the same;
g. Misrepresenting that the Plaintiffs-Creditors' upfront payment of ten percent (10%) of the total contract price would go only towards the Plaintiffs-Creditors' project;
h. Misrepresenting the quality of materials that would be used on the Plaintiffs-Creditors' project;
i. Misrepresenting that a full-time superintendent and full-time project manager would be on the project;
j. Misrepresenting that the Plaintiffs-Creditors would have a personal liaison to coordinate design selections;
k. Misrepresenting that subcontractors working on the Plaintiffs-Creditors' project were being paid; and
l. Misrepresenting that the Plaintiffs-Creditors would receive lien releases for work performed by subcontractors.
17. Parsing through these misrepresentations individually, the court first believes that there was no evidence presented by the Plaintiffs-Creditors regarding misrepresentations (e), (k) and (l), so these representations are not actionable.
18. Next, misrepresentations (a), (b), (c), and (h) are also not actionable here. Most of these alleged misrepresentations address the Defendant-Debtor's qualifications as a custom home builder and his obligation to perform the work in a good and workmanlike manner, in accordance with first class custom home building practices and using quality materials. Specifically, the court does not believe that the evidence shows that these representations were "false" or a promise of some future performance made with the intent not to perform , both of which are requirements to prove common law fraud.
19. Next, the court finds that representation (j) (that the Plaintiffs-Creditors would have a personal liaison to coordinate design selections) is also not actionable due to the presence of the "entireties clause" in the Contract. First, to be clear, representation (j), while indeed promised by the Defendant-Debtor to the Plaintiffs-Creditors prior to the Contract being signed, never was actually incorporated into the Contract and related documents. Paragraph 26 of the Contract provides that
This Contract and the attached addenda, constitutes the entire agreement between the parties and all prior negotiations, promises and/or representations whether oral or written, not expressly set forth herein, are of no force and effect and do not constitute part of this Contract. Owner represents to Builder that Owner has not relied and is notrelying upon any warranties, promises, guaranties, or representations made by Builder, any agent of Builder, or any third party or anyone else acting or claiming to act on behalf of Builder with respect to the purchase of the Property, except as contained in this Contract....
This was quite clearly an entireties clause. Under Texas law, the presence of an entireties clause can have the effect of disclaiming any reliance a contract party may have had on any representations made by a counter-party to the contract prior to the contract being signed, as long as the disclaimer in the contract language is "clear and unequivocal" in its expression of the parties' intent to disclaim reliance.
20. Here, the court finds that a plain reading of the language above from the Contract аlso shows a clear and unequivocal disclaimer of reliance.
21. In summation, the only alleged misrepresentations that now remain are that: (1) "the work would be in compliance with the design plans;" (2) "that Plaintiffs-Creditors' upfront payment of ten percent (10%) of the total contract price would go only towards Plaintiffs-Creditors' project;" (3) "that a full-time superintendent and full-time project manager would be on the project;" and (4) that "a Builder's Risk Policy was in place on the Plaintiffs-Creditors' property, and charging the Plaintiffs-Creditors for the same."
22. Turning now to the evidence before the court, and keeping in mind the required elements to prove fraud under Texas law outlined above, the court believes that three of the four alleged misrepresentations above form the basis for an ultimate finding of fraud or fraud by nondisclosure committed by the Defendant-Debtor.
a. Representation 1: "the work would be in compliance with the design plans."
23. First, as to the representation that "the work would be in compliance with the design plans," the evidence showed that the initial design plans submitted to the Plaintiffs-Creditors contemplated the installation of concrete piers and, in fact, that was the pier type that Bella Vita first attempted to install. However, upon discovering subsurface water, Bella Vita decided to change the pier type to steel helical piers, without timely disclosing this to the Plaintiffs-Creditors or obtaining their consent to the change, as required under the terms of the Contract. Clearly, this amounted to a breach of the Contract. Specifically, the Contract at paragraph 7.A.3, last sentence, stated that "Builder shall make no changes to the Improvements or alterations from the Construction Documents executed by Owner, unless agreed in writing by Owner, at Owner's sole and exclusive option ."
24. While the Defendant-Debtor has argued that his actions merely amounted to a breach of the Contract by Bella Vita (mainly breach of the requirement to obtain the approval of the Plaintiffs-Creditors of any changes to the Home design), the court concludes that the evidence presented demonstrates something more-specifically a fraud by nondisclosure during the performance of the Contract that induced the Tomlinsons to continue on with the Contract longer than they would have, had they known the truth. Specifically, there was a significant gap in time between: (a) when the subsurface water was discovered on the Lots, (b) followed by the unilateral decision to change the pier type, (c) followed by the puncturing of the water line with the unapproved piers, which seriously flooded the Tomlinsons' building pad, and (d) ultimately confirming to the Plaintiffs-Creditors all these events (after the Tomlinsons learned from a neighbor that something seemed amiss). There was no credible testimony offered by the Defendant-Debtor to adequately explain why he chose not to inform the Plaintiffs-Creditors about the discovery of subsurface water; the decision to change piers; and the puncturing of a water line causing massive damages.
25. Applying the specific requirements for a fraud by nondisclosure to the evidence above, the court finds that (1) the Defendant-Debtor concealed or failed to disclose the change in pier type to the Plaintiffs-Creditors (as well as the significant events preceding and following pier installation), which was a material fact within the Defendant-Debtor's knowledge; (2) the Defendant-Debtor knew that the Plaintiffs-Creditors were ignorant of the change in pier type (and surrounding events) and did not have an equal opportunity to discover the change; (3) by failing to disclose the change in pier type (and surrounding events), the Defendant-Debtor intended to induce the Plaintiffs-Creditors to stay in the Contract and continue paying for subsequent draw requests; and (4) the Plaintiffs-Creditors suffered injury as a result of the concealment of the change in pier type, mainly in having to remove and repair the damage from the unapproved helical piers (more on this below).
26. As stated above, fraud by nondisclosure also requires a duty to disclose. Here, the court finds that a duty to disclose arose from the fact that there had been previous representations by the Defendant-Debtor to the Plaintiffs-Creditors that a spеcific pier type (i.e. , concrete piers) would be used in the construction of the Home. Bella Vita proceeded to expend the Tomlinsons' Initial Deposit and requested additional funds from the Plaintiffs-Creditors in order to (among other things) purchase these concrete piers.
27. To be clear, the court is not finding that there was a fraudulent misrepresentation at the time the Contract was entered into-as to the contractual provisions that the "work would be in compliance with design plans" or as to the provisions that written consent would be obtained for changes. The court is not concluding that the Defendant-Debtor intended not to comply with these Contract representations when they were made. Rather, the court is concluding that the Defendant-Debtor, during the performance of the Contract, intentionally concealed material facts from the Tomlinsons, knowing they were unaware, with the intention of inducing the Tomlinsons to stay in the Contract. The Defendant-Debtor does not refute that he was personally involved (as CEO) in the entire pier switch and water puncturing fiasco. The court believes that the Defendant-Debtor cared mightily about not losing a $4.5 million contract with a famous NFL star on the biggest home that he had ever contracted to build. This project would be the biggest accomplishment of his young career.
28. As far as the damages for this fraud by nondisclosure, the court notes that the Plaintiffs-Creditors relied solely upon the damages set forth in the Arbitration Award as proof of their damages, and the Defendant-Debtor did not present any evidence to refute such amounts.
b. Representation 2: "that Plaintiffs-Creditors' upfront payment of ten percent (10%) of the total contract price would go only towards the Plaintiffs-Creditors' project."
29. Second, as to the alleged representation made by the Defendant-Debtor "that the Plaintiffs-Creditors' upfront payment of ten percent (10%) of the total contract price would go only towards the Plaintiffs-Creditors' project," the court concludes that there was an utter failure to disclose how the upfront payment was spent. This was material, and within the Defendant-Debtor's knowledge. The Defendant-Debtor knew the Tomlinsons were unaware of and did not have an opportunity to otherwise discover it. And by failing to disclose, the Defendant-Debtor intended to induce the Tomlinsons to stay in the Contract. This caused harm to the Tomlinsons.
30. The Contract clearly stated that draw requests with copies of invoices (among other documentation) were required-plain and simple. Second, paragraph 6 dealing with the "escrow" of the initial 10% deposit clearly contemplated that Bella Vita would retain it and "apply it against the first approved Draw Request." However, after the Contract was signed, Bella Vita repeatedly failed to fully account for the Initial Deposit, even after repeated requests from Mrs. Tomlinson. Specifically, the court makes note of at least two or three cost-reconciliations that were sent to the Plaintiffs-Creditors, in which there was a failure to fully account for where the Initial Deposit was actually spent (despite previously representing to the Plaintiffs-Creditors in prior draw requests that the entire Initial Deposit had been expended on "soft costs").
31. The argument made vociferously by the Defendant-Debtor is that the Contract was a "fixed price" contract-as though nothing he sent or did not send to the Plaintiffs-Creditors-as far as how their deposit and subsequent draw money was spent-really mattered. However, this defense does not adequately take into account the true nature of the Contract for at least two reasons. First, the Contract did have some mechanisms for cost adjustments-upward or conceivably downward. Second, while no "trust fund" mechanisms/protections were put in place, there were oversight and approval mechanisms that were clearly intended to ensure that the Plaintiffs-Creditors could monitor where their money was being spent and make sure it did not go toward any of the Defendant-Debtor's other projects. This would be a rational concern for any consumer building a house, and Mrs. Tomlinson credibly testified that bad experiences with prior house-building projects were what made her retain a lawyer (Mr. Miller) to negotiate special oversight mechanisms into the Contract. Moreover, the Defendant-Debtor also testified that the Plaintiffs-Creditors "had been burned" by other builders in the past and that he knew the Plaintiffs-Creditors "wanted transparency in the visibility of the cost."
32. The failure to comply with the Contract's requirements to provide invoices and other documentation to the Plaintiffs-Creditors regarding expenditures on their Home project was not only a breach of contract but also, in this court's view,
33. The Plaintiffs-Creditors must show, of course, that there was a duty to disclose in order for this to be an actionable fraud by nondisclosure against the Defendant-Debtor. As noted above, Texas courts have held that there is a duty to disclose "when one makes a partial disclosure and conveys a false impression." Here, such a duty clearly existed in light of the fact that the first two draw requests showed that the Initial Deposit had been completely utilized on "soft costs," creating a false impression that the Initial Deposit had actually been spent on the Plaintiffs-Creditors' home. Yet, in the subsequent reconciliations produced by the Defendant-Debtor, it became clear that the Defendant-Debtor was unable to account for a significant portion of the Initial Deposit. Thus, the Defendant-Debtor was clearly under a duty to disclose to the Plaintiffs-Creditors how he had or had not spent the Initial Deposit.
34. What would be the resulting actual damages owed to the Plaintiffs-Creditors for this nondisclosure? In looking at the various cost breakdowns that were submitted into evidence at the Trial, as well as the testimony of the Defendant-Debtor, Mrs. Tomlinson, and the Defendant-Debtor's father, the most logical amount this court can derive is $207,000. This represents the amount of the subsequent draw requests ($68,310 plus $138,690) that the Plaintiffs-Creditors paid, based on a belief that their Initial Deposit had all been expended. In fact, there was a failure to disclose how as much as $215,418 of the Initial Deposit was even spent.
c. Representation 3: "that a full-time superintendent and full-time project manager would be on the project."
35. As to the third representation "that a full-time superintendent and full-time project manager would be on the project," the evidence showed that there was not a Bella Vita representative (i.e. , a manager or superintendent) on site full-time after the Contract was signed. Specifiсally, Mrs. Tomlinson credibly testified that on the day the water line was punctured at the Lots, Chase White, who was supposed to be the full-time superintendent on the project, was not at the Lots because he was at another home around
d. Representation 4: "a Builder's Risk Policy was in place on the Plaintiffs-Creditors' property, and charging the Plaintiffs-Creditors for the same."
36. Finally with regard to the representation that "a Builder's Risk Policy was in place on the Plaintiffs-Creditors' property, and charging the Plaintiffs-Creditors' for the same," the court believes that a fraudulent misrepresentation occurred. Once again, the court is not concluding that the Defendant-Debtor misrepresented at the time of contracting that Bella Vita would purchase the Builder's Risk Policy, while secretly intending not to do it. Rather, the Defendant-Debtor personally supervised reports going out to the Tomlinsons during the performance of the Contract that created the false impression that $22,415.93 of the Tomlinsons' money had been used to acquire a Builder's Risk Policy.
37. The Defendant-Debtor testified that a builder's risk policy was a policy that would originate and be paid for once the "lumber dropped" on the home and, since the Plaintiffs-Creditors' construction project never got to that stage, the Defendant-Debtor testified that the builder's risk policy was never purchased. However, to be clear, there is documentary evidence in the record showing that the Defendant-Debtor did represent to the Plaintiffs-Creditors on multiple occasions that Bella Vita had, in fact, purchased the builder's risk insurance policy and paid for the builder's risk insurance policy . Specifically, the evidence showed that there were cost-reconciliations sent to Mrs. Tomlinson on June 4, 2015 and August 6, 2015, and that both cost-reconciliations represented that $22,415.93 had been spent on a builder's risk policy for the Home, when, in fact, one had not been purchased.
38. In sum, the court finds that the Plaintiffs-Creditors are entitled to damages in the amount of $664,590.93 ($435,175 plus $207,000 plus $22,415.93) for the various fraudulent misrepresentations and nondisclosures made to the Plaintiffs-Creditors in this case and that the Defendant-Debtor
2. Is the Plaintiffs-Creditors' Debt as to the Defendant-Debtor Nondischargeable Pursuant to Section 523(a)(2)(A) of the Bankruptcy Code ?
39. In order to prove that a debt is nondischargeable, because it was obtained through "a false representation, " pursuant to section 523(a)(2)(A) of the Bankruptcy Code, a creditor must show that: (1) the debtor made representations other than a statement concerning his financial condition, (2) at the time the debtor made the representations, he knew they were false, (3) the debtor made the representations with the intention and purpose to deceive the creditor, (4) the creditor justifiably relied on such representations,
40. A debt may also be nondischargeable under section 523(a)(2)(A) on the basis of "false pretenses." Often times, courts use the terms "fraudulent representation" and "false pretenses" interchangeably. However, the Supreme Court in Husky clearly recognized a distinction between the various types of fraud set forth in section 523(a)(2)(A) (namely "false representations" and "actual fraud"), and several courts have clearly recognized a distinction between a "false representation" and "false pretenses." For purposes of interpreting
41. Turning now to the credible evidence, the court ultimately concludes that the Plaintiffs-Creditors' fraud claims against the Defendant-Debtor (in some cases actual misrepresentations and in some cases nondisclosures) clearly fall within the ambits of section 523(a)(2)(A) of the Bankruptcy Code and are nondischargeable. The court, in its analysis above, found multiple, material misrepresentations and nondisclosures by the Defendant-Debtor with the intent and purpose of deceiving the Plaintiffs-Creditors (on the most significant home project he had ever undertaken). The Plaintiffs-Creditors justifiably relied upon these material misrepresentations and nondisclosures. The Plaintiffs-Creditors sustained losses as a proximate result of the material misrepresentations and nondisclosures. Moreover, the court believes that the material misrepresentations and nondisclosures found above would also fall into the category of "false pretenses" under section 523(a)(2)(A) of the Bankruptcy Code, since when considered collectively, the Defendant-Debtor's actions created a contrived and misleading understanding that the Contract was being complied with-specifically with regards to what piers were being used (and the subsequent striking of the water pipe)-and that the Initial Deposit was being properly and fully spent on the Tomlinsons' Home. This all ultimately induced the Plaintiffs-Creditors to continue paying draw requests to the Defendant-Debtor. The court believes that the Defendant-Debtor's conduct and omissions created an overall false impression that induced the Tomlinsons to stay in the Contract longer-ultimately causing them harm.
42. Accordingly, the court finds and concludes that the $664,590.93 debt owed by the Defendant-Debtor is nondischargeable pursuant to section 523(a)(2)(A) of the Bankruptcy Code.
IV. CONCLUSION.
Based on the foregoing, the court will issue a separate Judgment based on these Findings of Fact and Conclusions of Law. Plaintiffs-Creditors' counsel is directed to
Notes
More specifically, Bella Vita's Amended Statement of Financial Affairs filed in its bankruptcy case (Case No. 16-34790-bjh-7), which this court may take judicial notice of, shows that Steven A. Clem owned 48.6% of Bella Vita, Michael Clem, Steven Clem's father, owned 34.7%, and Fred Treffinger, Steven Clem's father-in-law, owned 16.7%. See DE # 42 in In re Bella Vita Custom Homes, LLC (Case No. 16-34790-bjh-7).
See Plaintiffs-Creditors' Second Amended Statement of Claims, pp. 7-23 [DE # 15 in the AP]. Note that references to "DE # ___ in the AP" throughout these Findings of Fact and Conclusions of Law refers to the docket entry number at which a pleading appears in the docket maintained by the Bankruptcy Clerk in this Adversary Proceeding.
See Plaintiffs-Creditors' Exhibit 12.
See Plaintiffs-Creditors' Second Amended Statement of Claims, pp. 13-17 [DE # 15 in the AP].
Miller v. Keyser ,
Weitzel v. Barnes ,
See Plaintiffs-Creditors' Exhibit 12, ¶ 17. "Knowing" violations of DTPA enable a plaintiff to obtain mental anguish damages.
See Plaintiffs-Creditors' Exhibit 12, p. 4 (emphasis added).
The document was entitled "First Amended Objection to Discharge." See DE # 12 in the AP. The original complaint commencing this Adversary Proceeding was entitled "Objection to Discharge," filed April 3, 2017, and only alleged section 727 grounds for denial of the Debtor's overall discharge in his bankruptcy case. See DE # 1 in the AP. The First Amended Objection to Discharge alleged both grounds for denying the discharge of the Plaintiffs-Creditors' individual debt, pursuant to section 523(a)(2) of the Bankruptcy Code, as well as section 727 grounds for denial of overall discharge. The Plaintiffs-Creditors announced at the beginning of the Trial that they were no longer pursuing their section 727 objection to overall discharge. The court notes that the deadline for either section 523 or 727 objections in this case was June 19, 2017. Thus, there was no timeliness issue with regard to the newly added section 523 objections asserted in the First Amended Objection to Discharge.
See DE # 15 in the AP.
Amstadt ,
The Plaintiffs-Creditors also filed a motion for summary judgment arguing that they were also entitled to judgment on their section 523(a)(2)(A) claim as a matter of law-based on the record from the Prepetition Arbitration. See DE ## 17-19 in the AP. The court easily denied this motion-as the record certainly did not support an unrefuted finding of fraud. The Plaintiffs-Creditors' motion for summary judgment is not addressed herein. Rather, the much more vexing questions that were presented in the Defendant-Debtor's motion for summary judgment are addressed herein.
Cromwell v. County of Sac. ,
See Amstadt ,
See Milliken v. Grigson ,
See Brown v. Felsen,
Brown ,
See Universal Am. Barge Corp. v. J-Chem, Inc. ,
Universal Am. Barge ,
Parklane Hosiery Co., Inc. v. Shore ,
Grogan v. Garner ,
Marrese v. Am. Academy of Orthopaedic Surgeons ,
Pancake v. Reliance Ins. Co. (In re Pancake) ,
Universal Am. Barge Corp. ,
Dennis v. Dennis (In re Dennis),
Now all "domestic support obligations" (whether or not in the nature of "alimony, maintenance, or support") are excepted from discharge pursuant to section 523(a)(5) of the Bankruptcy Code -and such term is broadly defined in section 101(14A) of the Bankruptcy Code.
Dennis ,
Fielder v. King (In re King),
King,
Id. at n. 1.
Id. at 19.
Parklane Hosiery Co., Inc. v. Shore ,
Dennis ,
King,
See Plaintiffs-Creditors' Exhibit 12, ¶¶ 12 & 5.
Id. at ¶ 20.
RecoverEdge ,
This court hastens to add that failure to introduce a trial record from earlier court proceedings does not absolutely bar the use of issue preclusion. Sheerin v. Davis (In re Davis) ,
The DTPA simply requires that the consumer show that a misrepresentation was false and that the false misrepresentation was the producing cause of the consumer's damages.
Baldwin ,
Eagle Props., Ltd. ,
See Brown ,
For other examples of cases in which bankruptcy courts have struggled with application of collateral estoppel in section 523 litigation, where prior DTPA litigation was involved, see the following: Dang v. Gilbert (In re Dang) ,
See Brown ,
As mentioned earlier, the Plaintiffs-Creditors also filed a motion for summary judgment arguing that it was also entitled to judgment on its section 523(a)(2)(A) claim as a matter of law-based on the record from the Prepetition Arbitration. See DE ## 17-19 in the AP. The court easily denied this motion-as the record did not support an unrefuted finding of fraud.
The first day of Trial began August 23, 2017.
See Transcript, p. 70 (lines 9-11). References to the "Transcript, p. _" herein refer to the Transcript of the first day of the Trial held on August 23, 2017 and is located at DE # 59 in the AP.
See Defendant-Debtor's Exhibit 5.
See Joint Pre-Trial Order, p. 6 [DE # 40 in the AP], filed August 22, 2017.
See Tomlinson's First Amended Objection to Discharge and Dischargeability, p. 6 (¶ 13f) [DE # 12 in the AP], filed May 25, 2017.
See Plaintiffs-Creditors' Exhibit 5 (p. 0000050), provided June 4, 2017 to Mrs. Tomlinson; Defendant-Debtor's Exhibit 6; & Plaintiffs-Creditors' Exhibit. 13.109 (p. 000031).
See Plaintiffs-Creditors' Exhibit 1.
See Plaintiffs-Creditors' Exhibit. 11.
See Transcript, pp. 73-74.
See Transcript, pp. 75-84; 90-91.
See Transcript, pp. 242-49, 280-86.
Fed. R. Civ. P. 26.
See DE # 4 in the AP, dated April 4, 2017.
Id. at ¶ 1.
Id. at ¶ 3.
See DE # 11 in the AP, filed May 24, 2017.
See DE # 28 in the AP.
See DE # 16, Schedule B in In re Bella Vita Custom Homes, LLC (Case No. 16-34790-bjh-7).
See DE # 44, Schedule B in In re Bella Vita Custom Homes, LLC (Case No. 16-34790-bjh-7).
See Transcript, pp. 71-74.
Id. at p. 90.
See Defendant-Debtor's Exhibit 13.
See Plaintiffs-Creditors' Exhibit 11.
10/11/17 FTR audio at 10:01:45.
See DE # 55 in the AP.
See DE # 62 in the AP.
Plaintiffs-Creditors' counsel acknowledged this error.
See Joint Pretrial Order, DE # 40 in the AP, p. 4 (¶ C.a.(a) ) and p. 5 (¶ (a)(i) and (ii) ).
See DE # 12 in the AP, Amended Complaint, p. 6 (¶ 13(b), (c), (d), (f), & (g).
See Joint Pretrial Order, p. 5 (¶ (d)(i) ) and p. 6 (¶ e (i) and (ii) ).
See DE # 54 in the AP.
See DE # 60 in the AP.
Jimenez v. Tuna Vessel "Granada" ,
Morgan & Culpepper, Inc. v. Occupational Safety & Health Review Comm'n ,
Thrift v. Hubbard ,
Individually, the court will refer to LaDainian Tomlinson as "Mr. Tomlinson" and his wife, LaTorsha Tomlinson, as "Mrs. Tomlinson."
See Transcript, pp. 13-16.
See Transcript, pp. 17-18.
See Transcript, pp. 19-20.
See Transcript, pp. 19 & 132.
See Transcript, pp. 136-37.
See Transcript, p. 99.
See Transcript, p. 108.
See Plaintiffs-Creditors' Exhibit 1, ¶ 3.f.
Id. at ¶ 4.
Id. at ¶ 3
Id. at ¶ 5 (emphasis added).
Id. at ¶ 6.
There is another sentence near the end of this paragraph 6 that states in all capital letters, "OWNER ACKNOWLEDGES AND AGREES THAT THE INDEPENDENT CONSIDERATION IS NONREFUNDABLE FOR ANY REASON." "Independent consideration" is not defined, and it is not entirely clear if this meant that the Initial Deposit was intended to be nonrefundable for any reason or not. If the intention of the parties was to make the $448,318.57 Initial Deposit a nonrefundable deposit, then it would appear that this would be an unenforceable forfeiture penalty. See, e.g. , Stewart v. Basey ,
It is noteworthy that the Plaintiffs-Creditors were paying all cash for the Home-no bank loan was involved. This court believes (based on the Defendant-Debtor's testimony and actions) that the Defendant-Debtor thought he could be more relaxed about the draw request process with the Plaintiffs-Creditors than he might otherwise be in a situation in which a bank lender is involved. But the Contract clearly required him to provide documentation in order to be entitled to "draw" money from the Plaintiffs-Creditors (even in the case of the Initial Deposit).
See Plaintiffs-Creditors' Exhibit 1, ¶¶ 3(h), 5 (last sentence), 6 (second sentence), and 8. More specifically, Paragraph 8 of the Contract actually stated that the Plaintiffs-Creditors' approval of a Draw Request was subject to receiving Draw Requests with copies of invoices covered by the Drаw Request as well as various other items including a "comparison budget, showing overages/underages of actual versus original Contract Sales Price budget, for the items covered by the draw request and on an aggregate basis for the entire Project budget"; lien waivers; a "certification that the Work covered by the draw request has been completed according to Contract, executed by the chief executive officer or chief financial officer of the Builder"; and a builder certification "certifying that all suppliers and subcontractors covered by the draw request have been paid, or will be paid from disbursement of the proceeds of the draw request."
Id. at ¶ 6.
Id. at ¶ 5.
Id. at ¶ 7.A.3. (emphasis added).
Id. at ¶ 7.A.5 (emphasis added).
Id. at ¶ 9.C. (emphasis added).
Id. at ¶ 9.E. (emphasis added).
See Transcript, p. 137.
See Plaintiffs-Creditors' Exhibit 1, ¶ 9.J. This requirement of a Builder's Risk Insurance policy was reiterated at paragraph 19 of the Contract with slightly broader terms as to what needed to be covered-i.e., insurance to cover the cost of construction of the house in the event of "destruction of the improvements by fire, earthquake, explosion, hail, windstorm, or any other casualty prior to completion and Owner's occupancy." Id. at ¶ 19.
Id. at ¶ 9.J. (emphasis added).
Id. at ¶ 26.
See Transcript, p. 172.
See Plaintiffs-Creditors' Exhibit 4.
See Plaintiffs-Creditors' Exhibit 1, ¶¶ 3(h), 5, 6 and 8.
See Transcript, pp. 59 (lines 16-24); 60 (lines 8-14); 61 (lines 8-9 & 19-25); and 62 (lines 6-18).
See Transcript, p. 62 (lines 11-15).
Mike Moss, the vice president of construction, appeared to be the other individual at Bella Vita (other than the Defendant-Debtor) who worked directly with the Plaintiffs-Creditors.
See Plaintiffs-Creditors' Exhibits 13-40 & 13-50.
See Plaintiffs-Creditors' Exhibit 13-101, p. 285. There was also reference to an Excel document that the Defendant-Debtor had sent further breaking down the $135,000 that had been spent and Mrs. Tomlinson had said "Everything looked good!" However, the Excel document was never provided to the court as part of the evidentiary record.
See Plaintiffs-Creditors Exhibit 13-50.
See Plaintiffs-Creditors Exhibit 5.
See Plaintiffs-Creditors' Exhibits 13-40 & 13-101.
See Plaintiffs-Creditors' Exhibit 5.
See Plaintiffs-Creditors' Exhibit 13-40.
See Plaintiffs-Creditors' Exhibit 13-101.
See Plaintiffs-Creditors Exhibit 1, Exhibit A. p. 3; Plaintiffs-Creditors Exhibit 3 (Henley Johnston Report dated June 17, 2014 with attached Foundation Plan with Original Drawing Date of October 6, 2014); Plaintiffs-Creditors' Exhibit 13.7 (Foundation Plan with Original Drawing Date of October 6, 2014); and Plaintiffs-Creditors' Exhibit 13.29 (April 17, 2015 bid proposal for the concrete piers from Pennington Construction). Exhibit A to the Contract provides for "Post Tension on Piers Foundation per Engineer Design and soils report." The June 17, 2014 Henley Johnston Report seemed to contemplate concrete piers if piers were used and the Foundation Plan contemplates concrete piers. While it is somewhat unclear when the Plaintiffs-Creditors actually received and reviewed copies of the Foundation Plan or the June 17, 2014 Henley Johnston Report, Mrs. Tomlinson credibly testified that "the concrete piers were spelled out in our contract," and, thus, the court believes that they must have been reviewed by the Plaintiffs-Creditors either prior to or around the same time that the Contract was signed. See Transcript, p. 153.
Subsurface water was not an unforeseen condition in that it was identified in the Henley Johnson Report (an engineering report) dated June 17, 2014. See Plaintiffs-Creditors' Exhibit 3, pp. 27-41. However, the Defendant-Debtor testified that the water levels encountered in July 2015 were much higher then what was initially addressed in the Henley Johnson Report. See Transcript, p. 42.
The record is unclear as to when exactly the subsurface water was encountered. It appears that it happened in early-to-mid July 2015. The court concludes it must have been prior to July 20, 2015, which is the date on a bid proposal for the new 304 helical piers-as further addressed below. See Plaintiffs-Creditors' Exhibit 13.74.
See Transcript, pp. 42-43, 102-104.
Specifically, the court notes that there was a bid proposal submitted to Bella Vita by a company called Hargrave & Hargrave dated July 20, 2015 for the 304 helical piers for $112,838.72 that was sent to both Mike Moss and Chase White on the morning of July 20, 2015 that said "attached is new revised pier layout. 304 piers." Yet in an email to the Plaintiffs-Creditors from Mike Moss (copying Chase White) with the subject "Delayed update" that very same day, there was no mention at all of the discovery of subsurface water nor the change to helical piers, but rather Mike Moss stated: "Last Week: started drilling piers, started drilling wells for geothermal, form board survey was approved. This Week: finish drilling piers, finish drilling wells for geothermal." See Plaintiffs-Creditors' Exhibit 13.74. This seems very suspect and provides further support to Mrs. Tomlinson's credible testimony that they were never informed about the intention to change the pier type.
See Plaintiffs-Creditors' Exhibit 13.98. Mrs. Tomlinson credibly testified that she was orally told about the change to helical piers at a meeting with Mike Moss sometime in late July 2015. See Transcript, pp. 161-62. This is consistent with an August 5, 2015 email from Mrs. Tomlinson that states "... I didn't receive so much as a call, text, or email regarding changing the whole foundation support structure of my home. Again, it seems like the guidelines and rules change on a whim. And this whole switching my foundation support without my knowledge is also costing me even more money ...." See Plaintiffs-Creditors' Exhibit 13.101.
See Transcript, p. 164.
Again, it is unclear from the evidence on what exact day this happened or whether Bella Vita was at fault for the puncture. Specifically, the court notes an email dated August 21, 2015 from Chase White referencing an invoice from the City of Westlake for the broken water line and noting that there is a disagreement on who was responsible and that "[w]e need to have a meeting with them and hash this out." See Plaintiffs-Creditors' Exhibit 13.110; Transcript, p. 225-26.
See Plaintiffs-Creditors' Exhibit 14.
The neighbor was identified as current Dallas Cowboys tight end, Jason Witten. See Transcript, pp. 153-155.
The court would especially note that, when being questioned directly by the court, the Defendant-Debtor actually testified that the discovery of the subsurface water and the striking of the water line all happened within the same day or two and he notified the Plaintiffs-Creditors the very day it happened. Not only did Mrs. Tomlinson credibly refute such testimony, but the court finds that the additional documentary evidence at the Trial supports the notion that the discovery of the subsurface water and the striking of the waterline by Hargrave and Hargrave when installing the helical piers were two separate and distinct events which occurred over a multiple week span of time. See Transcript, pp. 225-27.
See Transcript, pp. 105-106, 153-155.
See Transcript, pp. 164, 226-27.
See Transcript, p. 172.
See Transcript, pp. 166-67 & 173-74.
See Transcript, p. 166.
See Transcript, p. 164.
See Plaintiffs-Creditors' Exhibit 13.101.
See Defendant-Debtor's Exhibit 6.
Defendant-Debtor's Exhibit 6 showed overhead of approximately $14,000. At the Trial, the Defendant-Debtor's father testified that this number should have been closer to $57,000, but did not provide any further documentary evidence to support this calculation.
See Plaintiffs-Creditors' Exhibit 13.107.
At the Trial, there was a significant discussion about the Plaintiffs-Creditors' Exhibit 13.109 (a so-called "final reconciliation"). While it is unclear (based on the testimony of the Defendant-Debtor and Mrs. Tomlinson) when the Plaintiffs-Creditors actually received Exhibit 13.109, the Defendant-Debtor testified that the document represented the final reconciliation of where the aggregate $655,318.57 of funds provided by the Plaintiffs-Creditors to Bella Vita had been spent through August 18, 2015. Again, even though the final reconciliation purports to itemize where the Plaintiffs-Creditors' funds had been spent, there still appears to be a "gap" in the accounting. More specifically, the court is adding $72,556 for permits/fees, $110,016.92 for architectural/eng/ins/surveys (including $22,415.93 for a builder's risk policy, which according to the Defendant-Debtor's testimony was never purchased), $1,239.64 for interior decoration, $17,914.30 for BVCH overhead, and $46,549.33 for BVCH profit for a total of $248,276.19 in what the Defendant-Debtor has characterized as "soft cost" expenses. Subtracting that from the Initial Deposit, there is still a failure to account for $200,042.38 of the Initial Deposit. This is so despite the fact that the Defendant-Debtor had previously represented to the Plaintiffs-Creditors that the Initial Deposit had been fully spent on "soft costs" in both draw request # 1 dated May 25, 2015 and draw request # 2 dated June 23, 2015. See Plaintiffs-Creditors' Exhibit 13.40.
See Plaintiffs-Creditors' Exhibits 5 & 13-109 & Defendant-Debtor's Exhibit 6.
See Plaintiffs-Creditors' Exhibits 7 & 8.
See Plaintiffs-Creditors' Exhibit 12.
Grogan v. Garner ,
Tummel & Carroll v. Quinlivan (In re Quinlivan) ,
FNFS, Ltd. v. Harwood (In re Harwood) ,
See generally Husky Int'l Elec., Inc. v. Ritz (In re Ritz) ,
See collectively
See generally discussion in Ward Family Found. v. Arnette (In re Arnette) ,
See Plaintiffs-Creditors' Exhibit 12, pp. 3 & 4 (¶ 18 and "Award" paragraph).
See, collectively ,
See Miller v. Keyser ,
Although the Arbitration Award does not elaborate at all on the basis for this finding, Texas jurisprudence has articulated that "knowingly" means actual awareness, at the time of the act or practice complained of, of the falsity, deception, or unfairness of the act or practice giving rise to the consumer's claim ... but actual awareness may be inferred where objective manifestations indicate that a person acted with actual awareness."
See TecLogistics, Inc. v. Dresser-Rand Group, Inc. ,
Amouri v. S.W. Toyota, Inc. ,
New Process Steel Corp., Inc. v. Steel Corp. of Tex., Inc. ,
Metz v. Bentley (In re Bentley) ,
Rawhide Mesa-Partners, Ltd. v. Brown McCarroll, L.L.P. ,
Ins. Co. of N. Am. v. Morris ,
SmithKline Beecham Corp. v. Doe ,
Ralston Purina Co. v. McKendrick ,
Hamilton v. Segue Software, Inc. ,
As to representations (k) and (l), while there were two exhibits admitted into evidence that alluded to the fact that there may have been unpaid subcontractors on the project, there was no testimony regarding these exhibits, and the court cannot discern by just examining the exhibits whether that was dispositive of the issue. See Plaintiffs-Creditors' Exhibit 6 (Text Messages between Mrs. Tomlinson & Paul Holland) & Plaintiffs-Creditors' Exhibit 13.110 (Email from Chase White to Josh Van, regarding invoice from the City of Westlake).
Eagle Props., Ltd. v. Scharbauer ,
See Italian Cowboy Partners, Ltd. v. Prudential Ins. Co. of Am ,
Italian Cowboy ,
The Texas Supreme Court also noted in Forest Oil (which was decided prior to Italian Cowboy ) that courts should not only examine the contract itself, but also the totality of the surrounding circumstances when determining if a waiver-of-reliance provision is binding. Those factors include: (1) whether the terms of the contract were negotiated, rather than boilerplate, and during negotiations the parties specifically disсussed the issue which has become the topic of the subsequent dispute; (2) whether the complaining party was represented by counsel; (3) whether the parties dealt with each other in an arm's length transaction; (4) whether the parties were knowledgeable in business matters; and (5) whether the release language was clear. Forest Oil ,
See Plaintiffs-Creditors' Exhibit 1, ¶ 7.A.3. (emphasis added).
See Plaintiffs-Creditors' Exhibit 1, ¶ 7.A.5 (emphasis added).
See Plaintiffs-Creditors' Exhibit 1, ¶ 9.C. (emphasis added).
See Plaintiffs-Creditors' Exhibit 1, ¶ 9.E. (emphasis added).
See Transcript, p. 137.
See Plaintiffs-Creditors' Exhibit 40 & Defendant-Debtor's Exhibit 6.
The court also notes an email that was sent from Mike Moss to the Plaintiffs-Creditors on July 20, 2015 that referenced installation of the "piers", without referencing that the concrete piers originally required by the Contract's design plans were being changed to helical piers. The court believes that this also amounted to "a partial disclosure conveying a false impression" (see Lewis ,
See Plaintiffs-Creditors' Exhibit 12.
See Plaintiffs-Creditors' Exhibit 5, 13-109 & Defendant-Debtor's Exhibit 6.
See Transcript, pp. 62-63.
See Defendant-Debtor's Exhibit 6. While Plaintiffs-Creditors' Exhibit 13-109 fails to account for a lesser amount ($200,042), there was not enough credible evidence presented by the Defendant-Debtor to show that Mrs. Tomlinson actually received this "final" reconciliation.
See Transcript, p. 172.
See Plaintiffs-Creditors Exhibit 5 & Defendant-Debtor's Exhibit 6. The court also notes this same charge also appears on a subsequent cost-reconciliation provided by the Defendant-Debtor, however, the evidence is unclear whether or not Mrs. Tomlinson actually received this cost-reconciliation. See Plaintiffs-Creditors' Exhibit 13-109.
In evaluating a cause of action under section 523(a)(2)(A) of the Bankruptcy Code, the court must determine that the plaintiff justifiably relied upon the representations made by the defendant. Mullen v. Jones (In re Jones) ,
In re Acosta ,
AT & T Universal Card Servs. v. Mercer (In re Mercer) ,
Provident Bank v. Merrick (In re Merrick) ,
Acosta ,
See, e.g. , Cordell v. Sturgeon (In re Sturgeon) ,
Sturgeon ,