delivered the opinion of the court:
In Moorman Manufacturing Co. v. National Tank Co.,
BACKGROUND
Plaintiff, Tolan & Son, Inc. (Tolan), is a residential contractor which developed and constructed a 13-building townhome complex called Meadow Mews in Tinley Park, Illinois. In October of 1989, Tolan entered into an oral agreement with KLLM Architects, Inc. (KLLM), for the preparation of plans and designs for the complex. KLLM is an architectural firm in the business of providing plans and specifications for residential and commercial developments. At the same time, Tolan entered into an oral agreement with Total Concept Land Design (Total Concept). Total Concept was responsible for land-planning services and preparing proposed layout designs, site plans, and landscaping plans. These designs were purportedly submitted to Intercon Engineering Corporation (Intercon), a civil engineer, which had provided Tolan with engineering drawings of the property. Inter-con was responsible for setting the final grades for the site to accommodate KLLM’s architectural designs.
In April of 1990, Tolan entered into an oral agreement with Terra Testing, Inc. (Terra), for soil engineering services, including an analysis of soil conditions for the purpose of confirming Total Concept’s proposed placement of each building. In May, a Terra representative indicated that the proposed sites for several of the buildings were over peat, which was highly compressible and not suitable for supporting the buildings’ foundations. Despite this information, the site plans were not revised and construction began. During July Tolan asked KLLM to recommend a geotechnical engineer to review excavation at one site. KLLM recommended Louis K. Walter, Jr. (Walter), whose business involved soil engineering and subsurface investigation services.
In the spring of 1991, Tolan, KLLM, and Total Concept discussed the idea of relocating buildings 10, 11, and 12 farther south. KLLM and Total Concept were aware that the new locations were over peat but redesigned the site plans notwithstanding. Neither KLLM nor Total Concept advised Tolan that relocation would create problems. Around the same time, Intercon had numerous contacts with KLLM and Total Concept concerning the movement of the buildings, indicating that relocation was not advisable because of the peat below. Apparently these concerns went unheeded and the plans were not revised to accommodate or eliminate them.
In July of 1991, Walter examined the soil and fill at building 9. He made certain recommendations pertaining to the fill and grade to be used in setting the foundations and the necessary support system. It was at this time that Walter first mentioned the use of caissons. KLLM revised the plans according to Walter’s recommendations but did not incorporate the caissons. Walter examined the soil beneath buildings 10, 11, and 12 in March of 1992, making the same recommendations he made with respect to building 9.
During construction in the spring of 1992, Tolan discovered cracks in some of the foundations and contacted KLLM. In May, an employee from KLLM visited building 10. Following this visit, KLLM forwarded a letter to Tolan stating that a structural engineer on its behalf, Lawrence Reiss (Reiss), recommended additional reinforcement bars in the foundation walls of buildings 11 and 12. In June KLLM, Reiss, and Walter inspected building 11 to observe cracks in its foundation. At this time, according to Tolan’s complaint, all three defendants stated the cracks were due to concrete being poured too wet and high stress areas in the intersections of the foundation walls. According to them, the cracks did not affect the structural integrity of the building. In July, Walter conducted soil boring tests at the proposed site of building 12 for the purpose of making recommendations regarding the design and construction of its foundation. Although Walter recommended the use of caissons, he did state that, alternatively, building 12 could be completed in the same manner as buildings 9, 10, and 11. The foundation in building 12 was not altered and caissons were not added. In December, Walter inspected cracks in building 12. He stated that some of the cracks were due to high stress areas and were typical. Other cracks were due to normal shrinkage. He stated these cracks did not impair the structural integrity. In March of 1993, Walter again inspected building 11. He stated that the cracks were due to insufficient frost protection.
According to Tolan, at no time did KLLM, Walter, or Reiss advise it that any of the cracks were the result of instability in the soil structure, although each of them knew of the peat underneath.
In April of 1993, Tolan contacted Dave Pate & Sons Construction, a concrete repair company, to evaluate the cracks. According to Pate, the cracks were the result of the inadequate bearing capacity of the soil below the foundations. Frank A. Guisinder, Jr., a structural engineer, confirmed this causation opinion, opining that the cracks were due to the instability of the supporting soil stratum. Thereafter, Tolan remediated the property at a cost in excess of $725,000.
Tolan then filed the instant suit. Counts I though IV are breach of contract claims against KLLM, Total Concept, Walter, and Terra Testing, respectively. These counts are not before this court. Counts V through VIII are negligent misrepresentation claims against Reiss, KLLM, KLLM as principal of Reiss, and Walter, alleging negligent misrepresentations in the evaluation and supplying of information regarding the foundational cracks. In these counts, Tolan seeks solely economic loss damages for remediation of the foundations. Defendants filed motions to dismiss pursuant to section 2 — 619 of the Code of Civil Procedure (735 ILCS 5/2 — 619 (West 1996)), which the trial court granted. We have jurisdictions pursuant to Supreme Court Rule 304(a) (155 Ill. 2d R. 304(a)).
ISSUE
The sole question on appeal is whether the trial court erred in granting each of the defendants’ motions to dismiss. The trial court granted the motions on the basis that Tolan seeks purely economic losses and, thus, the Moorman doctrine (Moorman Manufacturing Co. v. National Tank Co.,
STANDARD OF REVIEW
“The purpose of a motion to dismiss under section 2 — 619 *** is to afford litigants a means to dispose of issues of law and easily proved issues of fact at the outset of a case, reserving disputed questions of fact for a jury trial.” Zedella v. Gibson,
DISCUSSION
A. Moorman Doctrine—
Application to Architects and Engineers
In Moorman Manufacturing Co. v. National Tank Co.,
In 2314 Lincoln Park West Condominium Ass’n v. Mann, Gin, Ebel & Frazier, Ltd.,
“ ‘The rule acts as a shorthand means of determining whether a plaintiff is suing for injuries arising from the breach of a contractual duty to produce a product that conforms in terms of quality or performance to the parties [’] expectations or whether the plaintiff seeks to recover for injuries resulting from the breach of the duty arising independently of the contract to produce a nonhazardous product that does not pose an unreasonable risk of injury to person or property. The economic loss rule prevents recovery in tort when a defective product has resulted in the loss of the value or use of the thing sold, or the cost of repairing it. Under such circumstances, the duty breached is generally a contractual one and the plaintiff is merely suing for the benefit of his bargain.’ ” 2314 Lincoln Park West,136 Ill. 2d at 315-16 , quoting Flintkote Co. v. Bravo Corp.,678 F.2d 942 , 948 (11th Cir. 1982).
While admitting that an architect may supply information that will be relied upon by others, the court stated:
“[W]e do not believe that the character of that function should be overstated. ***
‘Obviously, a great many businesses involve an exchange of information as well as of tangible products — manufacturers provide operating or assembly instructions, and sellers provide warranty information of various kinds. But if we ask what the product is in each of the cases, it becomes clear that the product (a building, precipitator, roofing material, computer or software) is not itself information, and that the information provided is merely incidental.’ (Rankow v. First Chicago Corp. (7th Cir. 1989),870 F.2d 356 , 364.)
In the usual case, the information supplied by the architect is transformed into the building itself.” 2314 Lincoln Park West,
Although the court noted that the defendant 2314 Lincoln Park West dispensed information to plaintiff, the crux of plaintiffs complaint was the way in which the condominium was designed and constructed. Thus, the information provided was incidental to a tangible object and plaintiffs claim was to be resolved under contract law. 2314 Lincoln Park West,
In Fireman’s Fund Insurance Co. v. SEC Donohue, Inc.,
“ ‘Is a professional engineer who prepares plans and specifications for a construction project in the business of supplying information to others for the guidance of the recipient in its business dealings and liable in tort for negligent misrepresentation under Moorman ***[?]’ ” Fireman’s Fund Insurance,176 Ill. 2d at 166 .
In reaching its conclusion that the negligent misrepresentation exception to the Moorman doctrine did not apply to an engineer, the court relied extensively upon 2314 Lincoln Park West. It reasoned that there was no substantive difference between an architect and an engineer and, thus, the Moorman doctrine bars recovery in tort against either for purely economic losses. Even though defendant’s plans could never have been incorporated into the structure because they were defective, the focus is on the ultimate result of the professional’s work. The ultimate result of defendant’s work was a water supply system — a tangible object. Fireman’s Fund Insurance,
While all parties agree the supreme court’s decisions in 2314 Lincoln Park West and Fireman’s Fund Insurance are controlling, they disagree on the scope of the holdings. Tolan argues that these cases do not set forth an absolute rule that the negligent misrepresentation exception can never apply to architects and engineers. Instead, the cases indicate that the court must evaluate the particular circumstances of each case and determine whether defendant provided information for the guidance of others or whether defendant provided information that was ancillary to a tangible end product. Originally KLLM and Reiss argued that the cases set forth an absolute rule. However, they have abandoned that argument and instead now contend that the negligent misrepresentation exception does not apply in this case based on the facts present. In other words, they argue they were not hired to provide only information but rather were hired to build structures and provided information only ancillary thereto.
In its holding in 2314 Lincoln Park West, the Illinois Supreme Court stated an action “will not lie in the circumstances described.” (Emphasis added.) 2314 Lincoln Park West,
Similarly, the language in Fireman’s Fund Insurance supports a finding that the court was not casting an absolute rule. First, the certified question incorporates the fact that the engineer was “prepar[ing] plans and specifications for a construction project.” Fireman’s Fund Insurance,
Based on the foregoing, we conclude that neither 2314 Lincoln Park West nor Fireman’s Fund Insurance sets forth an absolute rule that architects and engineers may never be sued under the negligent misrepresentation exception to Moorman. Rather, the cases simply stand for the proposition that, in the usual course of events, architects and engineers provide information, plans, and specifications that are incorporated into a tangible product, building, or structure.
To state a claim based on the negligent misrepresentation, exception to Moorman, plaintiff must demonstrate that: (1) defendant is in the business of supplying information for the guidance of others in their business dealings; (2) defendant provided information that constitutes a misrepresentation; and (3) defendant supplied the information for guidance in the plaintiffs business dealings. Nicholas J. Murlas Trust v. Mobil Oil Corp., No. 93 C 6956, slip op. at_(N.D. Ill. August 18, 1995). In determining whether a particular enterprise is in the business of supplying information for the guidance of others in their business transactions, courts must undertake a “precise, case-specific inquiry.” Rankow v. First Chicago Corp.,
Obviously a great many businesses exchange information as well as products.
“The Illinois Supreme Court’s test for determining whether a defendant ‘is in the business of supplying information for the guidance of others in their business transactions’ is whether the end product of the relationship between plaintiff is a tangible object (i.e., a product) which could be readily described in a contract or whether it is intangible. [Citation.] In short, if the intended end result of the plaintiff-defendant relationship is for the defendant to create a product, a tangible thing, then the defendant will not fit into the ‘business of supplying information’ negligent misrepresentation exception.” MW Manufacturers, Inc. v. Friedman Corp., No. 97 C 8319, slip op. at_(N.D. Ill. July 21, 1998).
Where the information supplied is merely ancillary to the sale of a product or service or in connection with the sale, defendant will not be found to be in the business of supplying information for the guidance of others in their business dealings. Rosenstein,
“[0]ne may envision a continuum [of enterprises] with pure information providers at one end and pure tangible good providers at the other.” Allendale Mutual Insurance Co. v. Bull Data Systems, Inc., No. 91 C 6103, slip op. at_(N.D. Ill. December 7, 1994). At the pure information end are accountants and attorneys (Congregation of the Passion, Holy Cross Province v. Touche Ross & Co.,
The first category — pure information providers — includes businesses that provide a product that consists solely of information. The supplying of information need not encompass the enterprise’s entire undertaking but must be central to the business transaction between the parties. General Electrical Capital,
The second category — tangible goods providers — includes businesses that supply tangible goods and/or noninformational goods or services. While the entity may exchange information, the information relates only to the goods or services and, thus, is “supplied incidental to the sale of the product.” General Electric Capital,
The final category consists of businesses in between these two extremes: businesses that supply tangible goods (or noninformational goods or services) as well as information. Rankow,
Under the above rationale, if an architect or engineer is engaged solely to provide information based upon an evaluation and the value of the services lies in its analytical work rather than a tangible end product, it could be considered to be in the business of supplying information for the guidance of others. An analogous situation is presented in Tribune Co. There, plaintiff hired an environmental consulting firm that performed environment assessments and remediation activities to evaluate whether the property plaintiff was interested in acquiring contained any environmental concerns. The court found that plaintiff could maintain an action against the firm based on negligent misrepresentation. The court stated: “Unlike architectural or engineering plans, G&M’s report was not meant to result in any tangible structure, the characteristics of which could be easily embodied in contractual terms.” Tribune Co., slip op. at_. Rather, the purpose of the report was to assess the particular property at issue and “locate or identify any visible environmental concerns,” including the presence of asbestos-containing materials on the property. Tribune Co., slip op. at_. Thus, the ultimate result of the parties’ relationship was something intangible.
Undoubtedly, there may be circumstances where an architect or engineer is hired to perform services along the line of those in Tribune Co. and a negligent misrepresentation would be actionable in tort for purely economic losses. However, based on our resolution below, we need not precisely define what situations would warrant application of the exception.
B. Applicability of the Moorman Doctrine— Application to Facts of the Case
1. KLLM and Walter
Even if there are situations where the negligent misrepresentation exception to Moorman would apply, the question remains whether the exception applies in the instant case. Based on the facts present, we would be required, as urged by Tolan, to bifurcate defendants’ work into two distinct roles: one role encompassing the defendants’ design and construction activities and another role encompassing consultive services related to the cracks. This is so because there is no question that both KLLM and Walter were involved in the construction project on a continual or at least recurring basis from early on.
The facts present in the record do not support bifurcation. First, it is clear that each time an inspection was conducted and information imparted to Tolan, the project was ongoing. In fact, when Tolan sought information on building 10 it was for the purpose, inter alia, of modifying, if recommended, the foundations of buildings 11 and 12 to avoid similar problems. Ultimately, the design plans for buildings 11 and 12 were revised based upon the inspection of building 10 and the information provided thereto. Accordingly, the information was ancillary to defendants’ role in designing and constructing the buildings. The same is true regarding inspection of building 11. This too was, at least in part, for the purpose of modifying, if necessary, the remaining structures to be built. We do not have a situation, as in Tribune Co., where KLLM and Walter were hired to evaluate the structures, apply their analytical expertise, and produce a report imparting information that would be used by Tolan in its business dealings with others. The information defendants supplied was utilized to modify existing plans during the course of construction and was ancillary to the construction.
Based on the foregoing, we find that KLLM and Walter’s work cannot be bifurcated. They were not retained to provide an analytical end product. They were retained to design and construct the townhomes. The information supplied by them during the course of construction was incidental to the tangible object — the townhomes. Therefore, the circuit court properly granted their motions to dismiss.
2. Reiss
With regard to Reiss, we find there are insufficient facts in the record to ascertain the exact nature of his role in the project and whether he was retained to provide only information. Thus, we are unable to determine whether the trial court properly granted Reiss’ motion to dismiss.
According to Reiss, he was involved in the project anytime a structural engineering question arose. He supports this contention with excerpts from the deposition of Neil Schoof, KLLM’s project manager. However, that deposition transcript is not included in the record; only the quotations used by Reiss in his motion to dismiss and appellate court brief are available. Further, the supportive facts are not alleged in an affidavit. In ruling on a motion to dismiss pursuant to section 2 — 619, the trial court may consider pleadings, affidavits in support of the motion to dismiss, answers to interrogatories, depositions, and other proofs presented by the parties. Torcasso v. Standard Outdoor Sales, Inc.,
Nonetheless, according to the deposition excerpts, Reiss was contacted approximately 5 to 10 times during the construction of Meadow Mews for recommendations. In particular, he was asked to give his recommendations regarding the design of the foundations based on the soil conditions. Additionally, he apparently created a caisson layout because of the locations of buildings 10 through 12. Finally, there was testimony that he was called out to investigate the cracks. Moreover, Schoof referred to Reiss as a consultant and he was an outside contractor. Reiss was the structural engineer used by KLLM on its projects.
Based on the above, there is insufficient evidence for us to conclude whether Reiss was hired solely as a consultant on the project or whether, like KLLM and Walter, he was intimately involved with construction of the project and his ideas and information were incorporated into the structures. Accordingly, we remand to the circuit court to receive additional evidence on Reiss’ role and for further proceedings consistent with this opinion.
CONCLUSION
We conclude that the Moorman doctrine bars plaintiff’s claims against defendants KLLM and Walter. We further conclude that the negligent misrepresentation exception to the Moorman doctrine does not apply to these defendants. Accordingly, the trial court properly granted KLLM and Walter’s motions to dismiss. With regard to defendant Reiss, we vacate the trial court’s dismissal order and remand for proceedings consistent with this opinion.
Affirmed in part, and remanded in part, with instructions.
GORDON, EJ., and McNULTY, J., concur.