delivered the opinion of the court:
Plaintiffs, A1 Tierney, Cathy Tierney, Bernard J. Sarley, Jan Sarley and Carrol E. Siebold, brought this action for injunctive and declaratory relief to prevent the defendant, Village, of Schaumburg (the Village), from constructing a 50-foot-wide collector or secondary street, without sidewalks on either side, adjacent to their homes. Plaintiffs alleged that the construction of the collector or secondary-street would violate the Village’s own ordinance. The trial court denied plaintiffs’ request for a temporary restraining order to preserve the status quo. Plaintiffs appeal. We reverse and remand with directions.
On April 18, 1988, plaintiffs filed a verified complaint, seeking a temporary, preliminary and permanent injunction, as well as declaratory relief. The next day, plaintiffs filed a petition for a temporary restraining order and a preliminary injunction to maintain the status quo with regard to the construction of the 50-foot-wide collector or secondary street. The petition reincorporated and realleged the facts contained in the verified complaint which was attached to the petition. The Village filed an answer to the petition, but it did not file an answer to the verified complaint. The trial court, and the parties, treated the petition solely as a motion for a temporary restraining order.
Although there was a hearing on the petition, no evidence was presented. The trial court heard only the arguments of respective counsel. Since there was no evidentiary hearing, and the Village did not file an answer denying the allegations in the verified complaint, we consider as true all well-pled facts alleged in the complaint. (Opportunity Center of Southeastern Illinois, Inc. v. Bernardi (1986),
On July 26, 1977, the Village passed ordinance No. 1435 (0-1435). Ordinance 1435 approved a planned unit development known as King-sport Village East. Ordinance 1435 provides that the “developer will dedicate a 50-foót wide easement on the north property line for future roadway extension.” Ordinance 1435 does not provide for the inclusion of sidewalks on either side of the future roadway extension.
On October 24, 1978, the Village passed ordinance No. 1639 (0-1639), entitled “Subdivision Control Regulations of the Village of Schaumburg.” Ordinance 1639 provides for minimum right-of-way widths and the minimum design standards for particular street classifications. Ordinance 1639 states that streets classified as collector or secondary streets shall have a minimum right-of-way width of 80 feet. Ordinance 1639 also states, “Sidewalks are required along both sides of all streets.”
On April 12, 1988, the Village began construction of the Biesterfield Road Extension Project (Project). The purpose of the Project is to build a collector or secondary street as a roadway extension on the 50-foot-wide easement on the north property line that is referred to in 0-1435. Under the Project, there will not be a sidewalk on either side of the collector or secondary street.
On appeal, plaintiffs argue that construction of the Project would be dangerous and unsafe to their families because the Project provides for the construction of a collector or secondary street with a 50-foot right-of-way width, rather than the minimum 80-foot right-of-way width that is required by 0-1639, and because the Project does not provide or leave room for sidewalks on both sides of the street as required by 0-1639. The Village contends that the 50-foot-wide street does not violate the provision in 0-1639, which requires that the minimum width for collector or secondary streets be 80 feet. The Village relies upon the following provision in 0-1639: “The subdivision control regulations are applicable to planned unit developments as authorized in the zoning regulations of the Village of Schaumburg, except as specifically varied in the individual P.U.D. implementing ordinance.” The Village argues that since 0-1435 states that the “developer will dedicate a 50-foot wide easement on the north property line for future roadway extension,” 0-1435 has specifically varied the 80-foot width requirement for collector or secondary streets in 0-1435.
We disagree with the Village’s argument. Plainly, the language in 0-1435 does not provide for the construction of a collector or secondary street within the 50-foot-wide easement for future roadway extension. Thus, we believe that the language in 0-1435 does not purport to abolish or reduce the 0-1639 minimum "width requirement for collector or secondary streets. We therefore conclude that the minimum 80-foot requirement for collector or secondary streets in 0-1639 is not “specifically varied” by 0-1435.
The Village also contends that because 0-1435 does not provide for sidewalks in that part of the ordinance which states that the “developer will dedicate a 50-foot wide easement on the north property line for future roadway extension,” 0-1435 has specifically varied the requirement in 0-1639 that sidewalks are required along both sides of all streets. We disagree. Merely because sidewalks are not mentioned in the pertinent provision in 0-1435 does not mean that 0-1435 has specifically varied the requirement in 0-1639 that all streets have sidewalks on both sides. Actually, the opposite conclusion is true. Thus, we believe it is clear that 0-1435, which was adopted before 0-1639 was adopted, does not specifically vary the requirement in 0-1639 that sidewalks be constructed along both sides of all streets.
Since construction of the Project violates 0-1639, the Village is violating its own ordinance by going ahead with the Project. However, a municipality must follow its own ordinances. (People ex rel. J.C. Penney Properties, Inc. v. Village of Oak Lawn (1976),
Here, if the Village had wished to change 0-1639, which establishes that a collector or secondary street must have a minimum right-of-way width of 80 feet and that all streets must have sidewalks on both sides, the Village should have strictly complied with the legal requirements for amending or repealing the ordinance, including notice and hearing. Since the Village did not legally amend or repeal 0-1639, the Village’s action in constructing the Project is illegal, and the courts have jurisdiction to enjoin the Village’s illegal action.
Having concluded that the courts have jurisdiction to enjoin the Village’s illegal action, we next address whether the trial court abused its discretion in denying the request for a temporary restraining order. (See McRand v. Van Beelen (1985),
Here, the salient facts are that the Village’s illegal action will substantially interfere with plaintiffs’ right to the peaceful enjoyment of their homes because the violation will result in the creation of a hazardous and unsafe street abutting their property. We believe that these facts clearly demonstrate that plaintiffs have a protectable right in this matter.
Moreover, the transgression that is involved in this case is of a continuing nature. Where the transgression is of a continuing nature, irreparable injury is presumed to follow if the protectable right is not safeguarded. (See McRand v. Van Beelen,
We next examine whether plaintiffs have an adequate remedy at law to protect their right to the peaceful enjoyment of their real property. In order to have an adequate remedy at law which will preclude injunctive relief, the remedy must be clear, complete and as practical and efficient to the ends of justice and its prompt administration as the equitable remedy. (Bio-Medical Laboratories, Inc. v. Trainor (1977),
We shall next consider whether plaintiffs have established that they are likely to be successful on the merits. In this regard, a party is not required to make out a case which in all events will warrant relief on the merits. Rather, the moving party need only raise a fair question as to the existence of the right claimed and that he will be entitled to the relief prayed for if the proof should sustain his allegations. (See People ex rel. Hartigan v. National Anti-Drug Coalition (1984),
In reviewing this case, we appreciate that the decision to grant or deny injunctive relief is within the discretion of the trial court. However, if it appears upon review that the trial court abused its discretion in denying injunctive relief, a reviewing court will reverse the trial court. Here, for the reasons which we have stated, we conclude that the trial court abused its discretion in denying plaintiffs’ request for a temporary restraining order.
The trial court’s denial of plaintiffs’ request for a temporary restraining order is, therefore, reversed and the case is remanded with directions to conduct further proceedings for the determination of what, if any, equitable relief plaintiffs are entitled trader the circumstances that exist after remandment, consistent with what is stated in this opinion. In addition, the trial court shall permit the pleadings to be amended to take into account the circumstances that exist after remandment, and the trial court shall grant the relief in equity or at law to which plaintiffs are entitled on the amended pleadings or upon the evidence. See generally Ill. Rev. Stat. 1987, ch. 110, pars. 2 — 617, 11-107.
Reversed and remanded with directions.