Thurston County v. Cooper Point Ass'n
- Reporters:
- Before:
- Alexander, Ireland, Bridge (en banc)
We have been asked to review a decision of the Court of Appeals in which that court affirmed a Western Washington Growth Management Hearings Board (Board) determination that a proposal by Thurston County (County) to extend a sewer line from an urban sewage system to the rural Cooper Point area of Thurston County violates a provision in this state’s Growth Management Act (GMA),
I.
In 1995, County adopted its first comprehensive plan for local development as it was required to do by a provision in the GMA.1 In its plan, County designated the northern portion of the Cooper Point area as “rural.” This area lies within a narrow peninsula that extends northward roughly from the city limits of Olympia and the northern boundary of The Evergreen State College into an unincorporated area of Thurston County. The peninsula separates Budd Inlet on the east from Eld Inlet on the west. The area contains a number of residences, most of which
The more densely populated Tamoshan and Beverly Beach subdivisions each possess their own sewage system. These systems collect the sewage from all homes within the subdivision and treat it at a plant that is located within the subdivision. The effluent from each plant is then discharged into Puget Sound. The Beverly Beach treatment plant is homeowner-managed whereas County operates the Tamoshan plant in conjunction with a committee of homeowners that advises County on its management. Although both of these sewage treatment plants have outlasted their projected life, they currently operate in compliance with federal and state environmental standards.
As far back as 1992, County began working with the Cooper Point community to address future wastewater management concerns on Cooper Point. This process culminated in 1999 when County amended its comprehensive plan to include the Cooper Point Wastewater Facilities General Plan (Plan). The Plan enumerated five wastewater management alternatives for Tamoshan and Beverly Beach, to wit: (1) do nothing; (2) rebuild the Tamoshan plant further inland with the capacity to accommodate sewage from Tamoshan and Beverly Beach and adopt an enhanced septic system operation; (3) separate sewer service areas and develop an enhanced on-site septic operation and maintenance program; (4) construct a new limited capacity sewer line connecting the Tamoshan and Beverly Beach subdivisions to the sewer system of the Lacey, Olympia, Tumwater, and Thurston County Wastewater Management Partnership (LOTT); or (5) construct an extensive sewer system that would service the entire Cooper Point area.
Over the objection of numerous Cooper Point residents, County adopted the fourth option as its “preferred” alternative. Consequently, it planned to construct a four-inch sewer line to connect the sewage systems at Tamoshan and Beverly Beach with the LOTT sewage treatment system. It also planned to provide up to 100 future sewer hook-ups for existing outlying single-family homes in the event of individual septic system failures.
In February 2000, the Cooper Point Association, the League of Women Voters of Thurston County, and several individuals (Respondents) filed a petition with the Board claiming that the proposed sewer line violated the State Environmental Policy Act (
We granted County’s petition to review the decision of the Court of Appeals and thereafter extended amicus curiae status to 1000 Friends of Washington and the Washington Environmental Council, and the Building Industry Association of Washington and Washington Association of Realtors (BIAW).3
II.
When reviewing a decision of the Board, we apply the standards of
III.
RCW 36.70A.110(4) provides as follows:In general, cities are the units of local government most appropriate to provide urban governmental services. In general, it is not appropriate that urban governmental services be extended to or expanded in rural areas except in those limited circumstances shown to be necessary to protect basic public health and safety and the environment and when such services are financially supportable at rural densities and do not permit urban development.
(Emphasis added.) We must first determine if, as County contends, the Board erred in determining that
A. Is County’s proposed sewer line an extension or expansion of an urban governmental service?
As noted above, County asserts that its proposed sewer line to the Cooper Point peninsula is not prohibited by
After reviewing the record, we find that we agree with the Respondents that the evidence does not support a conclusion that what County proposes to do is not an extension or expansion of the urban governmental service. We say this because LOTT is an existing urban governmental service4 which
B. Is the Cooper Point peninsula a “rural” area for the purpose of
County contends, additionally, that
As we have observed above, County, in accord with the GMA’s rural designation provision,
The record is sufficient, in sum, to show that the proposed sewer line constitutes an extension or an expansion of an urban governmental service into a rural area.
IV.
Having concluded that
Generally, the first step a court takes when reviewing the meaning of a statute is to look to the plain meaning of its terms. State v. Fjermestad, 114 Wash.2d 828, 835, 791 P.2d 897 (1990). Under this approach, it is appropriate for a court to give, as did the Court of Appeals, a nontechnical statutory term its dictionary meaning. We have, however, recently indicated that the plain meaning of a statute may be “discerned from all that the Legislature has said in the statute and related statutes which disclose legislative intent about the provision in question.” Dep’t of Ecology v. Campbell & Gwinn, L.L.C., 146 Wash.2d 1, 11, 43 P.3d 4 (2002). Under this approach, we construe the act as a whole giving effect to all of the language used. We stated that this “formulation of the plain meaning rule provides the better approach because it is more likely to carry out legislative intent.” Id. at 11-12, 43 P.3d 4. County and amicus curiae, BIAW, urge us to review the meaning of the term “necessary” under the latter formulation of the plain meaning rule whereas the Respondents contend that it is sufficient to look to the dictionary to ascertain the meaning of the term.
Regardless of which formulation of the plain meaning rule we choose to apply, in this case it seems clear that a less restrictive interpretation of “necessary” is not sustainable. We say this because a more restrictive definition of “necessary” is consistent with the legislature’s intent in enacting the GMA to protect the rural character of an area. See
Despite the concerns expressed by the legislature in the GMA to protect rural areas, County asks us to consider two statutory provisions which it asserts support a less restrictive definition of “necessary.” It points out in this regard that “the legislature allows a county to designate areas of more intensive rural development and to provide the necessary /needed public facilities and services.” Pet. for Review at 16 (emphasis added) (citing
Thus, we are not persuaded by County that the GMA, when read as a whole, supports a less restrictive definition of the term “necessary.” As indicated above, County has not designated any of the area at issue in this case an area appropriate for more intense rural development. Similarly, we will not defer to County’s interpretation of “necessary” since its proposal is inconsistent with the GMA. To the contrary, the Board concluded that the strict definition of “necessary” is required to carry out the legislature’s intent. See AR at 952. Although we review questions of law de novo, we give substantial weight to the Board’s interpretation of the statute that it administers. See Redmond, 136 Wash.2d at 46, 959 P.2d 1091. Indeed, “`[i]t is well settled that deference is appropriate where an administrative agency’s construction of statutes is within the agency’s field of expertise.’” Redmond, 136 Wash.2d at 61, 959 P.2d 1091 (Sanders, J., concurring) (quoting Chrysler Motors Corp. v. Flowers, 116 Wash.2d 208, 216, 803 P.2d 314 (1991); Green River Cmty. Coll. v. Higher Educ. Pers. Bd., 107 Wash.2d 427, 438, 730 P.2d 653 (1986)). Because the Board’s determination is consistent with the legislative policy of the GMA to protect rural areas, we hold that the Board correctly interpreted the term “necessary” in a more restrictive fashion. Furthermore, as the Court of Appeals indicated, its interpretation of the term is consistent with the dictionary definition of that term. For those reasons, we will not disturb the Board’s determination.
V.
Finally, we must determine whether the Respondents, other than the Board, are entitled to attorney fees pursuant to
costs shall be awarded to the prevailing party or substantially prevailing party on appeal before . . . the supreme court of a decision by a county . . . to issue, condition, or deny a development permit involving a site-specific rezone, zoning, plat, conditional use, variance, shoreline permit, building permit, site plan, or similar land use approval or decision.
VI.
For reasons stated above, we are satisfied with the Board’s determination that County’s proposal to extend a sewer line from an urban treatment plant to rural Cooper Point is subject to and violates the development restrictions imposed by
SMITH, JOHNSON, MADSEN, CHAMBERS and OWENS, JJ., concur.
SANDERS, J., dissenting.
In general, cities are the units of local government most appropriate to provide urban governmental services. In general, it is not appropriate that urban governmental services be extended to or expanded in rural areas except in those limited circumstances shown to be necessary to protect basic public health and safety and the environment and when such services are financially supportable at rural densities and do not permit urban development.
Assuming the proposal involves urban governmental services to be extended or expanded in rural areas, the majority reads the term “necessary” to mean extending a sewer line, i.e., extension of a government service, would be permitted only if it were absolutely required, i.e., the only possible means of addressing a particular threat. Not surprisingly this reading dooms the proposed sewer. One can almost always imagine an alternative solution that would not involve expansion or extension of government services if considerations such as cost, other planning goals, and the interests of the community are deemed irrelevant by this court.
The majority claims its conclusion is required under the Growth Management Act (GMA) because the legislature’s intent was to protect the rural character of an area and because its reading is required by the common dictionary definition. Majority at 1163-1164. But the majority’s analysis is incomplete because it ignores the overall structure of the GMA, and it is wrong because it looks to 1 GMA planning goal while ignoring 12 others, failing to account for the GMA’s clear mandate that cities and counties are to make planning decisions—not the boards (in this case the Western Washington Growth Management Hearings Board).
To properly apply
Although “necessary” may sometimes mean “absolutely required” this is not the only meaning recognized by the law. As Black’s explains: necessary
must be considered in the connection in which it is used, as it is a word susceptible of various meanings. It may import absolute physical necessity or inevitability, or it may import that which is only convenient, useful, appropriate, suitable, proper, or conducive to the end sought . . . its force and meaning must be determined with relation to the particular object sought.
BLACK’S LAW DICTIONARY 1029 (6th ed.1990).
The majority’s approach tells cities and counties that extension or expansion of government services into a rural area may never occur unless there is absolutely no other way to protect public health, safety, and the environment. This is not consistent with the GMA. The GMA is structured as a complex mélange of planning goals, 13 in all, which must be balanced and harmonized with one another. The balancing and harmonizing is left not to the growth management hearings boards but to cities and counties.
The GMA recognizes 13 planning goals which are not ranked in priority, are not meant to be exclusive, and are permitted to be given varying degrees of emphasis by local planners.
Reasonable people could certainly argue over which planning goals should be given priority in any given situation, but the legislature did not choose to prioritize the goals, and clearly there will be times when furthering one goal will conflict with furthering another goal. See Richard L. Settle, Washington’s Growth Management Revolution Goes to Court, 23 Seattle U.L.Rev. 5, 11 (1999). The legislature could have given responsibility for balancing these goals to the growth management hearings boards, but it clearly assigned responsibility for balancing priorities and harmonizing planning goals to the counties and cities:
In recognition of the broad range of discretion that may be exercised by counties and cities consistent with the requirements of this chapter, the legislature intends for the boards to grant deference to counties and cities in how they plan for growth, consistent with the requirements and goals of this chapter. Local comprehensive plans and development regulations require counties and cities to balance priorities and options for action in full consideration of local circumstances. The legislature finds that while this chapter requires local planning to take place within a framework of state goals and requirements, the ultimate burden and responsibility for planning, harmonizing the planning goals of this chapter, and implementing a county’s or city’s future rests with that community.
This statement of intent is further fortified by several other provisions of the GMA. Plans, regulations and amendments adopted under the GMA are presumed valid upon adoption.
Thus, the GMA informs us that the legislature intended cities and counties to be the primary decision makers, to balance and harmonize the planning goals established under the GMA, and that the growth management hearings boards are to defer to these decisions unless they are clearly erroneous. “Clearly erroneous” means that after reviewing the record as a whole, the court is left with the definite and firm conviction that a mistake has been made. Wenatchee Sportsmen Ass’n v. Chelan County, 141 Wash.2d 169, 176, 4 P.3d 123 (2000). An absolutist meaning for “necessary” is not consistent with these mandates. A reading which more nearly effectuates the structure of the GMA is one which defines “necessary” to denote “convenient, useful, appropriate, suitable, proper, or conducive to the end sought” rather than “absolutely required.” Such a reading gives cities and counties a freer hand to perform their balancing and harmonizing roles under the GMA, allowing them to best judge how to protect the public health, safety, and the environment, while leaving unchanged the board’s role to ensure compliance with the overall goals and requirements of the GMA. The majority’s decision erroneously shifts power from cities and counties to the growth management hearings boards. It handcuffs local governments that attempt to discharge their planning responsibility to manage growth and address the pressing needs of their communities.
I dissent.
IRELAND and BRIDGE, JJ., concur.