THOMPSON STREET CAPITAL PARTNERS IV, L.P., in its CAPACITY аs MEMBERS’ REPRESENTATIVE v. SONOVA UNITED STATES HEARING INSTRUMENTS, LLC
No. 166, 2024
IN THE SUPREME COURT OF THE STATE OF DELAWARE
April 28, 2025
Submitted: February 19, 2025
VALIHURA, Justice:
Plaintiff Below, Appellant,
v.
Defendant Below, Appellee.
C.A. No. 2023-0922
Before VALIHURA, TRAYNOR, and GRIFFITHS, Justices.
Upon appeal from the Court of Chancery. REVERSED and REMANDED.
Steven T. Margolin, Esquire (argued), Bryan T. Reed, Esquire, GREENBERG TRAURIG, LLP, Wilmington, DE, for Appellant Thompson Street Capital Partners IV, L.P., in its Capacity As Members’ Representative.
D. McKinley Measley, Esquire, Alec F. Hoeschel, Esquire, MORRIS, NICHOLS, ARSHT & TUNNELL LLP, Wilmington, DE, for Appellee Sonova United States Hearing Instruments, LLC.
W. Brantley Phillips, Jr., Esquire (argued), Joseph B. Crace, Esquire, Margaret V. Dodson, Esquire, BASS, BERRY & SIMS PLC, Nashville, TN, Of Counsel for Appellee Sonova United States Hearing Instruments, LLC.
VALIHURA, Justice:
Delaware is a contractarian state, but our common law abhors a forfeiture. This case requires us to interpret a unitary contractual scheme composed of a merger agreement and escrow agreement entered into by Sonova and Thompson. The merger agreement required Sonova to meet timing and specificity requirements when filing a claim notice for indemnification. The final sentence of Section 9.3.2(a) (the “Final Sentence”) of the Merger Agreement‘s notice provision clearly and unambiguously conditioned Sonova‘s right to recover on submission of a claim notice. It reads: “[Sonova] shall have no right to recover any amounts pursuant to Section 9.2 unless the Purchaser notifies the Members’ Representative in writing of such Claim pursuant to Section 9.3 on or before the
We hold that the Final Sentence clearly embodies a condition precedent and potential for forfeiture because it states plainly that there is no right to indemnification unless the claim notice is provided. However, because our law abhors a forfeiture, Sonova‘s noncompliance may be excused if the timing and specificity requirements were not material to the agreement and the noncompliance would result in a disproportionate forfeiture. Because the facts relating to materiality and disproportionate forfeiture are not sufficiently developed in the record, we REVERSE the Court of Chancery‘s order granting dismissal of the complaint and REMAND for further development on these points consistent with this opinion.
I. RELEVANT BACKGROUND
A. The Parties
Plaintiff Below/Appellant, Thompson Street Capital Partners IV, L.P., (“Thompson”) is a “Delaware limited partnership acting in its capacity as the Members’ Representative (as defined in the parties’ Merger Agreement) for those former members of Alpaca Group Holdings, LLC, a Delaware limited liability company (‘Alpaca‘).”2 Defendant Below/Appellee, Sonova United States Hearing Instruments, LLC, (“Sonova”) is a Delaware limited liability company.
B. The Transactions
In 2022, the parties engaged in multiple transactions through which Sonova acquired certain audiology practices operated by Alpaca and its subsidiaries. These audiology practices – referred to in the Merger Agreement as “Practice Entities” – included entities domiciled in several states.3 On January 13, 2022, the Merger Agreement was entered into by Sonova, Wave Merger Sub 1, Inc., a Delaware corporation (‘Merger Sub 1‘), Waver Merger Sub 2, LLC, a Delaware limited liability company (‘Merger Sub 2‘), Alpaca Group Holdings, LLC, a Delaware limited liability company (‘Alpaca‘), Alpaca Blocker Corp., a Delaware business corporation (‘Blocker‘) and Plaintiff (who was referred to in the Merger Agreement as ‘Members’ Representative‘).
These transactions were governed by two integrated agreements: a Merger Agreement and an Escrow Agreemеnt. The agreements governed the process by which Sonova could submit claims to recover alleged damages from the Indemnity Escrow Fund in the event of alleged breach by Thompson. As part of this process, Sonova was required to comply with the notice requirements in the merger agreement, including, among others, specificity requirements in Section 9.3.2 of the merger agreement requiring Sonova to provide “all available material written evidence” of the claim.4 The parties agreed that the escrow funds were to be the sole recovery option for
Section 9.3.2 of the Merger Agreement is entitled “Claim Procedures.” It contains notice requirements for the submission of indemnification claims providing:
Any claim by a Purchaser Indemnified Party on account of Damages under this Article IX (a “Claim”), including those resulting from the assertion of a claim by any Person who is not a Party to this Agreement (a “Third-Party Claim”), will be asserted by giving the Members’ Representative reasonably prompt written notice thereof, but in any event not later than 30 days after the Purchaser Indemnified Party becomes actually aware of such Claim, provided that no delay on the part of the Purchaser Indemnified Party in notifying the Members Representative will relieve the Merger Parties from any obligation under this Article IX, except to the extent such delay actually and materially prejudices the Merger Party. Such notice by the Purchaser Indemnified Party will describe the Claim in reasonable detail, will include the justification for the demand under this Agreement with reasonable specificity, will include copies of all available material written evidence thereof, and will indicate the estimated amount, if reasonably practicable, of Damages that has been or may be sustained by the Purchaser Indemnified Party. The Purchasеr Indemnified Parties shall have no right to recover any amounts pursuant to Section 9.2 unless the Purchaser notifies the Members’ Representative in writing of such Claim pursuant to Section 9.3 on or before the Survival Date.6
We will refer to the above requirements for specificity and timing as the “Notice Requirements.”
The Final Sentence in Section 9.3.2(a) of the Merger Agreement – in bold above – is the focus of this appeal. The parties also highlighted two other provisions of the Merger Agreement.
The first is the Merger Agreement‘s No-Waiver Provision in Section 11.2.2, entitled “Amendments and Waivers,” which states:
No failure or delay by any Party in exercising any right, power, or privilege under this Agreement will operate as a waiver thereof nor will any single or partial exercise thereof preclude any other or further exercise thereof or the exercise of any other right, power, or privilege.7
The second is the Merger Agreement‘s Integration Clause in Section 11.13 which states that “[t]his Agreement (including the Schedules and Annexes) and the Ancillary Agreements (including any schedules and annexes to the Ancillary Agreements) constitute the complete, integrated agreement among the Parties with respect to the subject matter of this Agreement and such Ancillary Agreements.”8 The Merger Agreement defines “Ancillary Agreements” as “the Escrow Agreement” in the Definitions Annex.9 Thus, the Merger
Pursuant to the Escrow Agreement, the parties established the Escrow Fund “made up of two distinct dollar amounts, each maintained in a separate account with the Escrow Agent: (1) the Adjustment Escrow, in an amount equal to $750,000.00; and (2) the Indemnity Escrow, in an amount equal to $7,750,000.00.”11 “[T]he Adjustment Escrow was released in the Fall of 2022 following the parties’ resolution of alleged issues relatеd to the Preliminary Adjustment Statement delivered at the closing of the Merger Agreement[]” but “[t]he Indemnity Escrow Fund remained in place, pending its release as required by the Escrow Agreement.”12
The Escrow Agreement contains provisions for the release of the Indemnity Escrow Fund. One of these, Section 3(a)(i), provides as follows:
The Indemnity Escrow Fund shall be released from the Indemnity Escrow Account (i) on August 29, 2023 (the “Indemnity Escrow Expiration”) in accordance with a written notice from both Parties in the form of Exhibit A-1 (a “Joint Instruction”) to the extent that the balance of the Indemnity Escrow Account is greater than the aggregate amount of all Claim Reserves (as defined below) for all then Open Claims (if any), (ii) from time to time in accordance with a Joint Instruction delivered not less than two (2) Business Days prior to the requested disbursement date, or (iii) from time to time in accordance with a written instruction from either Party given to effectuate an attached copy of a final non-appealable binding order or judgment or award from a court or other arbiter of competent jurisdiction and authority; provided, that such award from a court or arbiter appointed by the Parties is accompanied by (A) a written certification from counsel for the applicable Party stating that such order, judgment or award is final and not subject to further proceedings or appeal and (B) the written payment instructions of the prevailing Party and executed by an Authorized Representative of the prevailing Party to effectuate such order, judgment or award (each of immediately preceding clauses (ii) and (iii), a “Final Indemnification Determination”). The prevailing Party shall simultaneously provide a copy of any Final Indemnification Determination, certification and written instruction to the other Party. Escrow Agent shall be entitled to conclusively rely upon any such certification and instruction and shall have no responsibility to review the Final Indemnification Determination to which such certification and instruction refers or to make any determination as to whether such Final Indemnification Determination is final.13
Section 3(a)(ii) of the Escrow Agreement establishes procedures governing the submission of a claim, including the submission of a Claim Notice. It provides as follows:
From time to time following execution of this Agreement and on or prior to 5:00 p.m. New York City time on the Indemnity Escrow Expiration, if Purchaser determines in good faith that it or any Purchaser Indemnified Person has a claim to a payment from the Indemnity
Escrow Fund pursuant to Article IX of the Merger Agreement (a “Claim”), then Purchaser may provide written notice of the Claim on behalf of itself or any Purchaser Indemnified Person, to the Escrow Agent with a copy sent contemporaneously to Representative (a “Claim Notice”). The Claim Notice shall specify in reasonable detail the nature and dollar amount of the Claim and certify that Purchaser has delivered a copy of such Claim Notice to Representative and the information set forth in such Claim Notice complies with the terms of the Merger Agreement, upon which certification the Escrow Agent shall conclusively rely. Except as otherwise provided herein, each Claim shall be deemed to be an “Open Claim” and the Escrow Agent shall reserve within the Indemnity Escrow Account an amount equal to the amount of such Open Claim (such reserved amount, the “Claim Reserve”).14
On February 28, 2022, following the merger, the Escrow Fund in an amount equal to $8,500,000, was deposited with the Escrow Agent pursuant to the terms of the Escrow Agreement.
C. Sonova Delivers an “Indemnification Claim Notice”
On August 25, 2023 – one business day before the Indemnity Escrow Expiration date – Sonova delivered what it referred tо as an “Indemnification Claim Notice” to Thompson and the Escrow Agent (the “Claim Notice“).15 The Claim Notice stated that it was being provided in accordance with the applicable terms of the Merger Agreement, and it included the following language:
In accordance with the terms of the Merger Agreement, including Section 9.3.2, Purchaser hereby provides written notice to Members’ Representative of a Claim for indemnification pursuant to the terms of the Merger Agreement. This letter is also a Claim Notice to the Members’ Representative and the Escrow Agent in accordance with the terms of the Escrow Agreement, including Section 3(a)(ii). This Claim Notice complies with the applicable terms of the Merger Agreement.16
The Claim Notice alleged improper billing practices that led to Sonova incurring unquantified damages:
Purchaser has become aware of certain billing practices of the Company, its Subsidiaries and the Practice Entities that Purchaser believes are not in compliance with applicable Laws and/or third-party payor reimbursement rules or other requirements. Specifically, Purchaser believes certain items and/or services provided by the Company, its Subsidiaries and the Practice Entities to patients in multiple states (including without limitation Arkansas, Michigan, New Jersey and Tennessee) were improperly billed under the names and billing numbers of clinicians who did not personally provide the items and/or services to those patients. As a result of those billing practices, Purchaser believes the Company, its Subsidiaries and the Practice Entities have billed and received payment or reimbursement to which they are not entitled under applicable Laws and/or third-party payоr reimbursement
rules and other requirements. The improper billing and receipt of payment or reimbursement to which they are not entitled constitute breaches of the representations and warranties of the Company contained in Sections 3.8, 3.11, and 3.21 of the Merger Agreement. Pursuant to Section 9.2 of the Merger Agreement, the Merger Participants agreed to indemnify and hold harmless Purchaser from, against and in respect of any Damages resulting from breaches of the representations and warranties contained in the Merger Agreement.17
Finally, Sonova‘s Claim Notice alleged that the unquantified amount of damages exceeded the Indemnity Escrow Fund, and the Claim Notice directed the Escrow Agent to establish a Claim Reserve in the full amount of the Indemnity Escrow Fund:
As of this date, Purchaser‘s investigation and analysis of these matters is continuing, and the aggregate amount of Damages relating to the Claim is not known or estimable with certainty. Based upon Purchaser‘s investigation and analysis to date, Purchaser‘s maximum Damages relating to the Claim are in excess of the Indemnity Escrow Fund. Purchaser will supplement this Claim and Claim Notice as reasonably necessary as Purchaser learns additional information and concludes its investigation and analysis. Escrow Agent is hereby directed to establish a Claim Reserve in the full amount of the Indemnity Escrow Fund.18
D. Proceedings Below
On September 11, 2023, Thompson filed a Verified Complaint (“Complaint”) in the Court of Chancery. The Complaint contained two counts – Count I “Declaratory Judgment,” and Count II “Specific Performance / Mandatory Injunction.” In its Prayer for Relief, Thompson sought an order declaring that the Purported Claim Notice did not meet the contractual requirements with which Sonova had to comply and, as such, could not serve as a basis to withhold the escrowed funds. Thompson also sought a mandatory injunction requiring Sonova to execute a Joint Instruction letter directing the Escrow Agent to release the contents of the Indemnity Escrow Fund to Plaintiff.
Sonova moved to dismiss the Complaint. Relevant here, Sonova argued that Thompson‘s Complaint failed to plead a claim for relief that Sonova‘s Claim Notice did not comply with the Merger Agreement.19 Sonova acknowledged the primacy of the Merger Agreement stating: “Merger agreement Section 9.3.2(a) governs the process by which Sonova notifies Plaintiff of any indemnification claims.”20 Sonova then argued that “Section 9.3.2 [of the Merger Agreement] requires only that Sonova serve a written claim notice on or before the Survival Date in order to preserve a claim for indemnification and prevent the release of the Indemnity Escrow Fund.”21
E. The Court of Chancery‘s Analysis
On March 25, 2024, the Court of Chancery issued a “Letter Opinion”27 and addressed “whether Thompson Street is entitled to a release of the Indemnity Escrow Fund on the basis that the Notice sent to the escrow agent was invalid.”28 It held that “the Notice was valid for the purpose of stopping a release of the Indemnity Escrow Fund.”29
The court focused on the timeliness and specificity of the Claim Notice and analyzed Sonova‘s compliance through the lens of the Escrow Agreement. Regarding timeliness, the court held that the Claim Notice was timely under the Escrow Agreement since the Escrow Agreement deadline was August 29, 2023 and Sonova sent the Claim Notice on August 25, 2023. The court also analyzed Sonova‘s timeliness compliance under the Merger Agreement “[f]or thoroughness[.]”30 The court rejected Thompson‘s argument that the Claim Notice was untimely because it was not within 30 days of Sonova becoming aware of the claim. The court explained that “even if Sonova had knowledge of the underlying facts to trigger the 30-day notice requirement, Thompson Street hasn‘t pled the actual and material prejudice needed to deem the notice untimely under Section 9.3.2(a) of the Merger Agreement.”31 The court rejected Thompson‘s statements about prejudice as vague, conclusory, and unsupported by the facts.
Regarding specificity, the court observed that “Section 3(a)(ii) of the Escrow Agreement tracks Section 9.3.2 of the Merger Agreement.”32 But rather than applying the Notice Requirements of Section 9.3.2, which the parties seemed to agree governed, the court analyzed Sonova‘s compliance through the lens of the Escrow Agreement stating that “Section 3(a)(ii) [of the Escrow Agreement], on the other hand, requires that the notice ‘specify in reasonable detail the nature and dollar amount of the Claim.”33 The court held that Sonova had provided adequate specificity reasoning that:
Section 3(a)(ii) does not require Sonova to present every minute detail or prove the merits of its claims. Indeed, Section 3(a)(ii) does not require production of all available written evidence. Consistent with its limited scope and purpose, the Notice need only give notice to the escrow agent of Sonova‘s pending indemnification
claims. It does just that. Count I will be dismissed.34
The court granted Sonova‘s Motion to Dismiss after concluding that “[t]he notice provisions at issue here are unambiguous and Thompson Street‘s prayers for relief are fatally lacking.”35
II. CONTENTIONS ON APPEAL
Thompson argues that “[r]eversal is required because: (a) the Complaint‘s pleading more than satisfied Rule 12‘s lenient standard; and (b) the lower court ignored the Merger Agreement provision that Defendant-below admitted was controlling on the determinative legal issue presented.”36
More specifically, Thompson argues that Sonova‘s noncompliance with Section 9.3.2 is reasonably conceivable because Sonova failed to comply with requirements for documentation, specificity and calculation, and timely assertion.
Thompson‘s argument on appeal is anchored on its premise that the Letter Decision examined the wrong contract, namely the Escrow Agreement. It contends that the court erred in holding that “the Escrow Agreement‘s internal nоtice clause – which simply stated what Sonova had to tell the Escrow Agent – somehow governed this case to the exclusion of Section 9.3.2 and Sonova‘s related obligations to Plaintiff under the Merger Agreement.”37
Sonova advances a four-pronged argument that the Court of Chancery correctly held that its Claim Notice was sufficient to stop release of the Indemnity Escrow Fund:38 (i) “[t]he Court of Chancery correctly found that the Escrow Agreement controls the release of the Indemnity Escrow Fund[;]”39 (ii) “[t]he Court of Chancery correctly found that [Thompson] failed to plead facts demonstrating that Sonova‘s Claim Notice was untimely under either the Escrow Agreement or the Merger Agreement[;]”40 (iii) “[t]he Court of Chancery correctly found that Sonova‘s Claim Notice was sufficiently specific for purposes of the Escrow Agreement[;]”41 and (iv) “[Thompson] has failed to state a claim.”42
In addition, Sonova argues that the Merger Agreement‘s Notice Requirements were not conditions precedent to relief, that Thompson has not alleged any credible prejudice resulting from Sonova‘s alleged noncompliance with the Claim Notice‘s substantive contents, and that Thompson‘s arguments ignore the Merger Agreement‘s No-Waiver provision in Section 11.2.2.
III. STANDARD OF REVIEW
“In reviewing the dismissal of a complaint under
support the claims asserted, the plaintiffs would not be entitled to relief.”44 “That determination by this Court, as in the trial court, is generally limited to the factual allegations contained in the complaint.”45 “When reviewing a
“[T]his Court ‘review[s] questions of contract interpretation de novo.”48 “Moreover, ‘whether a contract is unambiguous is a question of law[.]”49 “The existence of a condition precedent is a question of contract interpretation, and therefore, of law.”50
IV. ANALYSIS
To recap, we consider whether the court below adequately focused on the Merger Agreement‘s Notice Requirements, whether the Final Sentence of Section 9.3.2(a) contains a condition precedent capable of triggering a forfeiture for Sonova‘s noncompliance with the Notice Requirements, whether Sonova‘s noncompliance with the Notice Requirements is reasonably conceivable on the record, and, if so, whether Sonova‘s noncompliance may be excused. We hold that: (i) the court below did not adequately focus on the Merger Agreement‘s Notice Requirements; (ii) the Final Sentence of Section 9.3.2(a) contains a condition precedent capable of triggering a forfeiture due to Sonova‘s noncompliance with the Notice Requirements; (iii) Sonova‘s noncompliance with the Notice Requirements is reasonably conceivable on the record; and (iv) Sonova‘s noncompliance may be excused if it satisfies the requirements for excusal; however (v) the materiality and disproportionate forfeiture issues that factor into the excusal analysis are insufficiently developed in the record. Thеrefore, we reverse and remand for further development of the materiality and, if necessary, the disproportionate-forfeiture points.
A. Principles of Contract Interpretation
We begin by considering the principles of contract law that guide our analysis.
1. General Principles
“Delaware is a contractarian state that holds parties’ freedom of contract
“A provision in a contract is ambiguous ‘when the provision in controversy is reasonably or fairly susceptible of different interpretations or may have two or more different meanings.”55 ““Where no ambiguity exists, the contract will be interpreted according to the ‘ordinary and usual meaning’ of its terms.”56 “The parties’ steadfast disagreement over interpretation will not, alone, render the contract ambiguous.‘”57
“Delaware courts follow the maxim that the general does not detract from the specific.”58 “This principle of contract interpretation dictates that ‘where specific and general provisions conflict, the specific provision ordinarily qualifies the meaning of the general one.’”59 “This principle ‘can be thought of as reading the specific as an exception to the general, which allows a harmonizing of otherwise conflicting provision[s].”60 Thus, we have recognized that “general terms of the contract must yield to more specific terms.”61
2. Integrated Agreements are Interpreted as a Unitary Contractual Scheme
The parties agree that the Merger and Escrow Agreements form an integrated agreement.62 Delaware courts have been called upon to interpret integrated agreements in previous cases. For example, in Fortis Advisors LLC v. Medtronic Minimed, Inc., the Court of Chancery addressed a case where the parties – as in the present case – contemporaneously entered
the escrow agreement by referencing “ancillary agreements” and expressly defining “ancillary agreements” to include the “escrow agreement.”64 The court concluded that “the Merger Agreement and Escrow Agreement should be read together as a unitary contractual scheme.”65 Similarly here, the Merger Agreement contains a clause integrating “Ancillary Agreements” and defines “Ancillary Agreements” to include the “Escrow Agreement.”66 Accordingly, the Merger Agreement and Escrow Agreement are integrated and we read them as a unitary contractual scheme.
3. Contracts Will Be Interpreted to Give Each Provision and Term Effect and Not Render Any Terms Meaningless or Illusory
““In upholding the intentions of the parties, a court must construe the agreement as a whole, giving effect to all provisions therein.’”67 ““[A] court interpreting any contractual provision ... must give effect to all terms of the instrument, must read the instrument as a whole, and, if possible, reconcile all the provisions of the instrument.”68 This is consistent with ““the principle of contract interpretation that requires this court to interpret the various
provisions of a contract harmoniously.’”69 Accordingly, “[c]ontracts will be interpreted to ‘give each provision and term effect’ and not render any terms ‘meaningless or illusory.’”70
4. Language Creating Conditions Precedent
The parties here dispute whether the language used in the Final Sentence of Section 9.3.2(a) creates a condition precedent that includes the Notice Requirements in Section 9.3.2. “A condition precedent is ‘an act or event, other than a lapse of time, that must exist or occur before a duty to perform something promised arises.’”71 “Although ‘[t]here are no particular words that must be used to create a condition precedent,’ a condition precedent must be expressed clearly and
Thompson argues that Sonova’s alleged failure to comply with Section 9.3.2 “effects an enforceable waiver/forfeiture of Sonova’s ability to seek indemnification.”75 If Thompson is correct, Sonova would be unable – absent excusal of the condition – to pursue recovery of up to $7,750,000 from the Indemnity Escrow Fund because the Merger Agreement states that “[t]he Indemnity Escrow Fund shall be the [Sonova’s] sole and exclusive source of recovery for Damages under this Agreement[.]”76
Conditions precedent that trigger forfeitures create a tension in contract law. On the one hand, “Delaware is a contractarian state that holds parties’ freedom of contract in high regard.”77 On the other hand, our common law generally disfavors forfeitures.78
This tension has led Delaware courts to look to whether the language clearly provides for a forfeiture. “If the language does not clearly provide for a forfeiture, then а court will construe the agreement to avoid causing one.”79 If the language clearly provides for a forfeiture, then a court may consider whether compliance with the condition may be excused in accordance with the criteria discussed below.80
5. Excuse of a Condition to Avoid Forfeiture
Delaware courts have often looked to the Restatement (Second) of Contracts as
However, the scope of this principle is limited and it “applies only where occurrence of the condition was not a material part of the agreed exchange.”85 The Restatement offers the following guidance in determining whether a failure to render or to offer performance is material:
(a) the extent to which the injured party will be deprived of the benefit which he reasonably expected;
(b) the extеnt to which the injured party can be adequately compensated for the part of that benefit of which he will be deprived;
(c) the extent to which the party failing to perform or to offer to perform will suffer forfeiture;
(d) the likelihood that the party failing to perform or to offer to perform will cure his failure, taking account of all the circumstances including any reasonable assurances;
(e) the extent to which the behavior of the party failing to perform or to offer to perform comports with standards of good faith and fair dealing.86
Determining whether a condition is a material part of an agreed exchange may require a fact-intensive analysis.87 In
B. The Merger Agreement and Escrow Agreement Are Integrated Meaning that Sonova Was Required to Comply with the Provisions in Both, Including the Notice Requirements
1. The Merger Agreement and Escrow Agreement Are Integrated and Should Be Read As a Unitary Contractual Scheme
Applying the contract interpretation principles above, including those involving integrated agreements, we start with our conclusion that the Merger Agreement and Escrow Agreement should be read together as a unitary contractual scheme given that the Merger Agreement contains a provision, namely, Section 11.3, that defines “Ancillary Agreements” to include the “Escrow Agreement.”90
2. Sonova Was Required to Comply With the Merger Agreement, Including the Notice Requirements of Section 9.3.2, and the Escrow Agreement
We hold that the Court of Chancery erred in focusing on the Escrow Agreemеnt instead of the Notice Requirements in Section 9.3.2 of the Merger Agreement. Sonova argues that “the Escrow Agreement governs the release of the
Section 9.3.2 sets forth specific notice requirements in addition to those in the Escrow Agreement. A harmonious reading of the two agreements requires that the more specific requirements of Section 9.3.2 be given meaning. Although Sonova’s position has shifted somewhat on appeal, it was not seriously disputed by the parties in the proceedings below that Section 9.3.2 governed and that its specificity requirements had to be met. The main dispute was whether they had been met or not.
The language of the Escrow Agreement also makes clear that compliance with the terms of the Merger Agreement is required. Section 3(a)(ii) of the Escrow Agreement requires Sonova to certify that “the information set forth in such Claim Notice complies with the terms of the Merger Agreement, upon which certification the Escrow Agent shall conclusively rely.”93 The fact that the Escrow Agreement instructs the Escrow Agent to conclusivеly rely on Sonova’s certification does not change Sonova’s obligation to comply with the Notice Requirements. It would make little sense for the Escrow Agreement to allow Sonova’s certification of its compliance to be conclusive as to its compliance with the Notice Requirements. If that were so, Sonova could effectively determine its own compliance with a contractual term of the Merger Agreement.
Therefore, we conclude that the integrated agreements established notice requirements which included both the Notice Requirements in the Merger Agreement and the less restrictive provisions in the Escrow Agreement. The trial court erred by not requiring Sonova to comply with the Notice Requirements in Section 9.3.2
C. The Final Sentence of Section 9.3.2(a) Contains a Condition Precedent Capable of Triggering a Forfeiture for Sonova’s Noncompliance With the Notice Requirements
Thompson argues that “Sonova has ‘no right to recover’ from the [Indemnity Escrow] Fund unless it has complied with each of Section 9.3.2’s prerequisites/conditions precedent – i.e., the Substantive Prerequisites and Assertion Deadline.”94 Thompson contends that Section 9.3.2 “effects an enforceable waiver/forfeiture of Sonova’s ability to seek indemnification.”95 If Sonova has forfeited its ability to seek indemnification from the Indemnity Escrow Fund, it would be without means to recover on the claims which it asserts exceed the $7,750,000 in the Fund. This is because the Merger Agreement states that “[t]he Indemnity Escrow Fund shall be the [Sonova‘s] sole and exclusive source of recovery for Damages under this Agreement, other than claims for Fraud, Pre-Closing Tax Liability and breaches of Fundamental Representations.”96
“For a condition to effect a forfeiture, it must be unambiguous. If the language does not clearly provide for a forfeiture, then a court will construe the agreement to avoid causing one.”97 We read Section 9.3.2 of the Merger Agreement as unambiguously creating a condition precedent that provides for a forfeiture. The language that creates the condition precedent in the Merger Agreement reads: “[Sonova] shall have no right to recover any amounts pursuant to Section 9.2 unless the Purchaser notifies the Members’ Representative in writing of such Claim pursuant to Section 9.3 on or before the Survival Date.”98
This language differs significantly from that in cases where Delaware courts have declined to find a condition precedent. In Blue Cube Spinco LLC v. Dow Chemical Co., 2021 WL 4453460 (Del. Super. Sept. 29, 2021), for example, the Superior Court declined to find a condition precedent in a notice provision relating to an indemnification claim.99 There, the plaintiff had acquired business lines and properties from the defendant through a merger vehicle. One of the acquired properties was a manufacturing facility in Germany. The plaintiff sought to improve this facility’s site and applied for expansion permits from the German government. However, the plaintiff’s application was denied due to a code violation attributable to the defendant. The plaintiff “fronted some consulting
The court determined that the code violation fell within the scope of the defendant’s indemnification duty and then turned to the defendant’s argument that the notice provision in the parties’ agreement was a condition precedent to coverage. The court observed that “[t]o lodge an indemnification claim, the [plaintiff] must, under Section 4.06(a), provide [the defendant] with (i) a ‘prompt ... written notice’ that (ii) describes ‘in reasonable detail the amount of Loss, if known’ and (iii) identifies the ‘provisions’ in the Separation Agreement on which the Company bases its claim (the ‘Notice Provision’).”101 The court cited Aveanna Healthcare for the principle that “‘a condition precedent must be expressed clearly and unambiguously[,]’”102 and concluded that “[t]he Notice Provision does not clearly express a condition precedent.”103 The court supported its conclusion by pointing to the lack of consequences for the plaintiff’s failure to comply, with the court writing:
Most notably, the Provision does not tie to its mandatory notice procedures any consequences for failing to lodge an indemnification notice properly. When a provision guised by a party as a condition precedent does not identify the way in which it can be enforced, it will not be recognized as a condition precedent. That is especially so where, as here, interpreting the provision as a condition precedent would cause a total forfeiture of a sophisticated indemnification scheme executed in connection with an acquisition of various chemically-sensitive and intellectual properties, and that would expose the buyer to an array of environmental liabilities.104
Sonova points to Blue Cube to argue that finding a forfeiture in the present case “would create a commercially irrational result.”105 It argues that Thompson’s interpretation results in a “lopsided outcome” because “Sonova would be exposed to ‘an array of … liabilities,’ simply by neglecting to include, for example, some of the available written evidence supporting the claim at the time the notice was served
We note, however, that Blue Cube is distinguishable. In Blue Cube, the notice provision was “silent on a non-conforming notice‘s consequences.”107 As a result, the court declined to find a condition precedent that would effect a forfeiture.108 It then determined that a no waiver provision confirmed this conclusion and that “the parties plainly did not intend for the Notice Provision to be a condition precedent to coverage.”109
By contrast, the Final Sentence unambiguously expresses a condition precedent. This is in part because – unlike the notice provision in Blue Cube – the language in the Merger Agreement states a consequence for noncompliance and reads as follows:
Any claim by a Purchaser Indemnified Party on account of Damages under this Article IX (a “Claim”), including those resulting from the assertion of a claim by any Person who is not a Party to this Agreement (a “Third-Party Claim“), will be asserted by giving the Members’ Representative reasonably prompt written notice thereof, but in any event not later than 30 days after the Purchaser Indemnified Party becomes actually aware of such Claim, provided that no delay on the part of the Purchaser Indemnified Party in notifying the Members Representative will relieve the Merger Parties from any obligation under this Article IX, except to the extent such delay actually and materially prejudices the Merger Party. Such notice by the Purchaser Indemnified Party will describe the Claim in reasonable detail, will include the justification for the demand under this Agreement with reasonable specificity, will include copies of all available material written evidence thereof, and will indicate the estimated amount, if reasonably practicable, of Damages that has been or may be sustained by the Purchaser Indemnified Party. The Purchaser Indemnified Parties shall have no right to recover any amounts pursuant to Section 9.2 unless the Purchaser notifies the Members’ Representative in writing of such Claim pursuant to Section 9.3 on or before the Survival Date.110
The Final Sentence defines the consequences of a noncompliant notice. Courts have observed that “it is the presence of conditional language that ‘limits or modifies rights or duties’ in a contract that determines whether a condition precedent has been created.”111 Here, the language
“Pursuant to’ is a restrictive phrase meaning in compliance or conformity with.”113 “““Comply[ing]’ means doing what is required.”114 Here, the Final
D. Sonova‘s Noncompliance With the Notice Requirements Is Reasonably Conceivable on the Record
Sonova‘s Motion to Dismiss should be denied unless Thompson “could not recover under any reasonably conceivable set of circumstances susceptible of proof.”115 Here, Thompson‘s allegations that Sonova failed to comply with the Notice Requirements are reasonably conceivable.
In particular, it is reasonably conceivable that Sonova failed to comply with the Specificity Requirement that Sonova “include copies of all available material written evidence” of its claim. The Complaint alleges that “although Sonova supposedly spent months ‘investigat[ing] and analy[zing] these matters,’ the Purported Claim Notice failed to include any materials or evidence supporting Sonova‘s claim -- let alone ‘copies of all available material written evidence thereof’ as required by Section 9.3.2(a).”116 As Sonova confirmed at oral argument, it did not provide any written evidence with the Claim Notice beyond its own assertions in the Claim Notice itself.117 This lack of written evidence establishes that it reasonably conceivable that Sonova did not “include copies of all available material written evidence.”
Moreover, Thompson has alleged that Sonova did not comply with the Timing Requirement of Section 9.3.2. The Timing Requirement has two components: (i) “reasonably prompt written notice thereof, but in any event not later than 30 days after the Purchaser Indemnified Party becomes actually aware of such Claim,” and (ii) the delay “actually and materially prejudices the Merger Party.”118
Thompson adequately pleads both components to the extent sufficient to survive
Sonova had been aware of the facts underlying its supposed Claim since long before then -- as Sonova representatives confirmed in various communications with Alpaca‘s former CEO and CFO before the Merger Agreement closed in February 2022, as well as communications with a continuing employee of Sonova in January 2023 and May 2023.119
Thompson pleads the following regarding the second component:
[B]y disregarding its claim deadline Sonova caused the kind of material prejudice that deadline was put in place to avoid, including by (a) increasing the risk of excess Damages by disregarding contractual and statutory refund/repayment periods; (b) negating the Parties’ ability to negotiate with applicable third-party payors in good faith and in a timely manner where due credit would be given; and (c) potentially implicating a greater period of noncompliance in any final Damages.120
Drawing reasonable inferences in favor of Thompson, as the
E. Whether the Forfeiture From Noncompliance With the Condition Precedent Can Be Excused Involves Questions of Materiality and Disproportionate Forfeiture That Are Insufficiently Developed in the Record
Thus far, we have determined that: (i) the Final Sentence in Section 9.3.2 of the Merger Agreement – the governing agreеment – creates a condition precedent that may effect a forfeiture as a result of Sonova‘s noncompliance with the Notice Requirements; and (ii) Sonova‘s noncompliance with the Notice Requirements is reasonably conceivable on the record. Next, we consider whether Sonova‘s reasonably conceivable noncompliance could be excused under the limited circumstances of disproportionate forfeiture. This, in turn, requires an analysis of the legally embedded issues of materiality and disproportionality.
Courts may excuse a condition precedent in cases where a party demonstrates that the condition precedent was not a material part of the agreement and satisfies the requirements for disproportionate forfeiture.121 The Restatement (Second) of Contracts provides that “[t]o the extent that the non-occurrence of a condition would cause disproportionate forfeiture, a court may excuse the non-occurrence of that condition unless its occurrence was a material part of the agreed exchange.”122 This rule is “a flexible one, and its application is within the sound discretion of the court.”123
1. Cases Analyzing Materiality and Disproportionate Forfeiture
Depending on the circumstances, the issues of materiality and disproportionate forfeiture could be decided as either a question of fact or law. In Aeolus Down, Inc. v. Credit Suisse International, 2011 WL 5570062 (S.D.N.Y. Nov. 16, 2011), the United States
The plaintiff brought actions for breach of contract, tortious breach of insurance contract, and declaratory relief alleging that the defendant owed $2.3 million under the agreement. The defendant argued that the plaintiff could not plead adequate performance because it failed to execute an assignment agreement.
The court determined that the parties employed the unmistakable language of condition and held that this created an express condition precedent. Specifically, the court found that execution of an assignment agreement within 25 days of the third-party‘s initial filing of its schedule was an express condition precedent of the defendant‘s obligation to purchase the claims. The court then observed that “[a]n express condition must be literally performed, unless it is excused by waiver, breach or forfeiture.”126
The court quoted Restatement (Second) of Contracts Section 229 for the principle that “[t]o the extent that the non-occurrence of a condition would cause disproportionate forfeiture, a court may excuse the nonoccurrence of that condition unless its occurrence was a material part of the agreed exchange.”127 Applying this principle, the court concluded that the defendant “facе[d] forfeiture: it paid $651,500 on the expectation that it would receive an indemnity of over two million dollars if [the third-party] went bankrupt.”128
Moving on to materiality, the court held that “[t]he facts support a plausible inference that the 25–day period was not a material part of the agreed exchange.”129 The court pointed to the lack of a “time is of the essence” clause and the lack of evidence that a delay would prejudice the defendant.130 The court also rejected the defendant‘s argument “that the 25–day period was material as a matter of law because the agreements at issue are option contracts[.]”131 The court observed that “[u]nder the facts alleged, the purpose of the agreements was not to offer [the plaintiff] the choice of coverage if [the third-party] went bankrupt, but to cover it, unquestionably, once that event transpired.”132
In Acme Markets, Inc. v. Federal Armored Express, Inc., 648 A.2d 1218 (Pa. Super. Ct. 1994), an inadequate record following a lower court‘s grant of summary judgment led the Superior Court of Pennsylvania to remand for consideration under Restatement (Second) of Contracts Section 229.134 The court considered a provision in a contract providing that the carrier had to receive a bag or package and issue a receipt before it could be required to reimburse a customer for any losses. The court addressed the defendant carrier‘s obligation to issue a receipt to the plaintiff, which suffered a loss after the robbery of one of its cash bags
accepted by the defendant carrier. The court determined that the contract‘s “plain language demonstrates that it clearly and unambiguously conditions [the defendant]‘s performance under the contract upon both the acceptance of bags or packages and the granting of a receipt for them. Thus, it unquestionably delineates a condition precedent involving those requirements.”135
Having “found that [the defendant]‘s liability under the contract was subject to a condition precedent and neither party disputes that the receipt portion of the condition remained unfulfilled at the time of the robbery,” the court considered “whether satisfaction of that requirement may be excused.”136 The court turned to the Restatement (Second) of Contracts Section 229 and quoted the language that “‘[t]o the extent that the non-occurrence of a condition would cause disproportionate forfeiture, a court may excuse the non-occurrence of that condition unless its occurrence was a material part of the agreed exchange.‘”137
The court addressed the disproportionate-forfeiture requirement stating that “[t]here can be little doubt that the operation of the condition in question will lead to a forfeiture since the condition‘s nonoccurrence results in the denial of compensation for the loss of a cashbag possessed by [the defendant] for transportation in accordance with the contract. Thus, the question becomes whether the forfeiture would be disproportionate.”138 The court quoted the following from Restatement (Second) of Contracts § 229:
In determining whether the forfeiture is “disproportionate,” [the] court must weigh the extent of the forfeiture by the obligee against the importance to the obligor of the risk from which he sought to be protected and the degree to which that protection will be lost if the nonoccurrence of the condition is excused to the extent required to prevent forfeiture.139
The court then noted, that although it believed “that the receipt requirement probably was an accounting device which had little impact upon the situation presently at issue, [the court‘s] examination of the certified record reveals that it is devoid of any evidence demonstrating the
The court further advised that “[o]n remand, the trial court should conduct an evidentiary hearing to determine the purpose of the receipt requirement and engage in the necessary weighing analysis. In addition, the court should determine whether the contested requirement constituted a material part of the agreement.”143 The court provided additional guidance stating that “[w]hile this determination rests to a large еxtent on the analysis of the requirement‘s purpose, it also involves a consideration of the negotiations of the parties along with all other circumstances relevant to the formation of the contract or to the requirement itself, including the circumstances surrounding the theft.”144
Disproportionate forfeiture and materiality questions may be capable of being resolved as a matter of law depending on the nature of the conditions. For example, in Obsidian Finance Group, LLC v. Identity Theft Guard Solutions, Inc., 2021 WL 1578201 (Del. Ch. Apr. 22, 2021), the Court of Chancery considered a Rule 12(b)(6) motion to dismiss and rejected the plaintiff‘s “argument that the Court may declare immaterial the six-month difference between the 5.5-year contract and the six-year earnout condition[.]”145 The court observed that “an earnout provision contemplates the payout of additional, often substantial, consideration when the entity sold achieves specific, bargained-for milestones[]” and that “[t]he value of the contingent consideration is inextricably linked to the estimated probability of the contingent event‘s occurrence.”146 This led the court to find that “[t]o change the benchmark of the earnout would be to change its risk profile and, by extension, the amount that should be paid in the event of its achievement.”147 Finally, the court concluded that “[u]nlike horseshoes or hand grenades, there is no ‘close enough’ when it comes to earnouts negotiated by sophisticated parties based on the estimated probability that the precise measure would be hit. Any adjustment to the earnout condition, then, would be ‘material’ as a matter of law.”148 Here, we think some limited factual development is needed.
2. The Current Record is Inadequate to Determine Materiality or Disproportionate Forfeiture
We are unable on this record to resolve the materiality and disproportionate forfeiture questions. We address materiality first because excusal of the condition, according to Section 229 of the Restatement, “applies only where occurrence of the condition was not a material part of the agreed exchange.”149 Although, Thompson alleges that the timing and particularity requirements were material,150 the record has not been developed on these points, including whether the parties, in negotiating these agreements, considered these requirements to be material.
Even if we were to determine that the Notice Requirements are not material, we are still unable to determine the disproportionate forfeiture issue on this record. Accordingly, we remand to the Court of Chancery for further consideration on these points.
3. Framework on Remand
To be as helpful as possible to the trial court on remand, we offer some guidance on the issues of materiality and disproportionate forfeiture. We think the Restatement‘s approach in Section 229 provides a useful roadmap. “Section 229 consists of two prongs: (1) whether the occurrence of the condition was a material part of the agreed exchange and (2) a proportionality analysis that balances the risk to be protected with the amount to be forfeited.”151 “Application of the second prong (proportionality) depends on whether the first prong (materiality) is met. In other words, if the occurrence of the condition is a material part of the agreement, then the proportionality analysis is not applied and the forfeiture cannot be prevented. But if the condition is not material, then the court is to engage in the proportionality analysis.”152
Regarding materiality, Restatement (Second) of Contracts Section 241 provides a list of factors that courts may consider. These factors, set forth earlier in this opinion, are:
- (a) the extent to which the injured party will be deprived of the benefit which he reasonably expected;
- (b) the extent to which the injured party can be adequately compensated for the part of that benefit of which he will be deprived;
- (c) the extent to which the party failing to perform or to offer to perform will suffer forfeiture;
-
(d) the likelihood that the party failing to perform or to offer to perform will cure his failure, taking account of all the circumstances including any reasonable assurances; - (e) the extent to which the behavior of the party failing to perform or to offer to perform comports with standards of good faith and fair dealing.153
Courts have also recognized that materiality in the context of Section 229 “rests to a large extent on the analysis of the requirement‘s purpose, [but] it also involves a consideration of the negotiations of the parties along with all other circumstances relevant to the formation of the contract or to the requirement itself[.]”154
If the trial court determines that the provision was not material, the court should turn to the proportionality prong of Section 229 to determine if the forfeiture was disproportionate.155 The Restatement (Second) of Contracts Section 229 sets forth the following guidance regarding disproportionate forfeiture:
In determining whether the forfeiture is “disproportionate,” [the] court must weigh the extent of the forfeiture by the obligee against the importance to the obligor of the risk from which he sought to be protected and the degree to which that protection will be lost if the nonoccurrence of the condition is excused to the extent required to prevent forfeiture.156
We leave to the Court of Chancery to determine what additional proceedings are needed to address the materiality, and if necessary, the disproportionate forfeiture issues.
F. The No-Waiver Provision Does Not Prevent the Application of a Condition Precedent in This Case
Next, we hold that the No-Waiver provision of the Merger Agreement does not prevent the release of the Indemnity Escrow Fund. As noted above, “[s]pecific language in a contract controls over general language, and where specific and general provisions conflict, the specific provision ordinarily qualifies the meaning of the general one.”157 Further, our law requires that contracts “be interpreted to ‘give each provision and term effect’ and not render any terms ‘meaningless or illusory.‘”158 In
Blue Cube, upon which Sonova relies, is distinguishable. The Blue Cube court considered a no-waiver provision in the context of an alleged condition precedent; however, the Blue Cube court only considered the no-waiver provision after having determined that “[t]he Notice Provision does not clearly express a condition precedent.”160 This meant there was no specific provision to control over the general no-waiver provision. Therefore, we decline to read Blue Cube as suggesting that the general no-waiver provision should prevail over a clear, specific provision such as a condition precedent.
Nucor further supports our view that the no-waiver provision here does not override the condition precedent. The Nucor court examined three alleged conditions precedent—Section 9.07(b), Section 9.07(c), and the written notice provision in Section 9.07(a).161 The court determined that the agreement stated consequences for failing to comply with Section 9.07(a), but the agreement “d[id] not tie the consequence of forfeiture to the requirements of 9.07(b) and (c).”162 The court found that the no-waiver provision supported its conclusion that 9.07(b) and 9.07(c) were not conditions precedent; however, the court did not apply the no-waiver provision to override 9.07(a)—the provision the court had found stated consequences for noncompliance.163
In the present case, the Merger Agreement contains a condition precedent that states the consequence of forfeiture for noncompliance. Therefore, the condition precedent is more akin to Section 9.07(a) in Nucor where the court did not apply the no-waiver position. Thus, neither Blue Cube nor Nucor require us to deviate from the principle that the specific controls over the general defines the outcome in the present case.
G. This Court Need Not Address the Dismissal of Count II — Specific Performance/Mandatory Injunction
Finally, Sonova does not explicitly mention
V. CONCLUSION
For the reasons set forth above, we REVERSE the Court of Chancery‘s order granting Sonova‘s Motion to Dismiss, and REMAND this action for further proceedings consistent with this Opinion.
Notes
The Court: Do you read “pursuant to” to mean “in compliance with” the notice requirements set forth above?
Counsel: Yes, Your Honor, if I misunderstood your question, I apologize. We don‘t know how else that could be read. “Pursuant to” means “in accordance with” and if it doesn‘t mean you must follow what is says right above, then what is written above is meaningless which Delaware law says can‘t happen.
Oral Argument Video at 10:46–11:08, https://courts.delaware.gov/supreme/oralarguments.
When the Court asked about the “pursuant to” language, Sonova did not address the meaning of “pursuant to.” Oral Argument Video 21:29-22:36, https://courts.delaware.gov/supreme/oralarguments. Instead, Sonova argued that “Section 9.3” in the Final Sentence does not include Section 9.3.2. Oral Argument Video at 21:53–22:10, https://courts.delaware.gov/supreme/oralarguments. Sonova argued that the parties could have mentioned Section 9.3.2 specifically and that their decision to only cite Section 9.3 means Section 9.3.2 is not included. Oral Argument Video at 22:10-36, https://courts.delaware.gov/supreme/oralarguments.
We reject this argument as both waived and meritless. It is waived because Sonova failed to fairly raise it below. And it is meritless because the structure of the Merger Agreement shows that Section 9.3.2 is an indented subsection located within Section 9.3. Further, the Final Sentence deals with notice procedures and Section 9.3.2 is the only part of Section 9.3 that addresses notice procedures.