23 F. 156 | S.D.N.Y. | 1885
This libel was filed to recover damages for the non-delivery and loss of about 200 tons of nitrate of soda, part of a cargo of about 900 tons, or 6,546 bags, which were shipped at Pisagua, Chili, on board the bark Chasca, bound for Hampton Boads and orders, in June, 1883. The bark was chartered to the libelants under a charter of affreightment that exempted her from liability for losses by perils of the seas. The question litigated was whether the loss of the nitrate is to be ascribed to perils of the sea, or to insufficient or improper dunnage.
The bark sailed from Pisagua on June 21st. About the middle of July she met with very heavy weather, and a succession of gales, lasting about three weeks. On the nineteenth of July, in a very severe gale, she was thrown upon her beam ends, shifting her cargo between-decks to the port side. She lay in that condition for about 48 hours, in a high sea; after which she wore round so as to be upon her port tack. She was then partially righted by trimming the cargo between-decks, though still having a considerable list to port, which remained
Tho weight of testimony is clearly to the effect that the cargo was well dmmaged, and in the usual manner, when loaded, giving about a foot of space above the floor of the hold, and from 14 to 16 Inches along tho turn of the bilge. Two witnesses swear to this positively. It Is confirmed by the condition of the dunnage forward and aft of the washed-out spaces, as testified to by careful observers; and there is no reason to suppose that it was different abreast of tho main hatch from what it was elsewhere. The testimony, based on the examination made after the dunnage was all down in the washed-out spaces, is insufficient to countervail this proof. There is no question that the vessel encountered very severe weather. Upon arrival at Hampton Eoads she showed nearly all over her marks of very severe strain and injury. These injuries, and the leaks arising from them, would naturally produce all the water in the hold necessary to account for the loss. Mr. Eeod, a very competent expert, so testifies, and no one contradicts it. A clear mark of a water-line was apparent on both sides of the ship along the washed-out spaces. This was about two feet above the floor, as stated by some of the libelant’s own witnesses. Mr. Eeed, for tho defense, states this with more particularity, and testifies that no dunnage could have prevented the loss of cargo with such a depth of water along the bilges. Water at the point of saturation holds in solution about half its weight of nitrate of soda. To dissolve and carry off 200 tons of nitrate of soda, 400 tons at least of water must, therefore, have passed through tho hold and tho ship’s pumps; or an average of over four tons a day Mim tho time the bark was thrown upon her beam ends until she arrived at Hampton Eoads. The fact that so groat an amount of water was necessary to carry off
These circumstances, it seems to me, indicate clearly enough the way in which the loss of the nitrate took place. When the bark was thrown upon her beam ends her leaks increased, as a consequence of the severe strain on 'her hull; and as the pumps were unable to reach the water along the port side while the ship lay in that position, the water accumulatad there until, at the turn of the bilge, it rose above the 14 or 16 inches space allowed by the dunnage. Lying in this position for 48 hours in a heavy gale and rolling badly, the nitrates in the bags upon the port side were rapidly dissolved, and the dunnage, which depended upon the bags to hold it in position, being thereby loosened, became wholly disarranged and broken down. The bags at the sides against the dunnage were but two tiers high, and thence towards the center were piled gradually higher. When the bark wore round and came upon her port tack, with heavy weather still continuing and much rolling of the ship, the accumulation of water at once passed from the port side to the starboard side, rising at once above the dunnage there also, and soon producing on that side the same results by dissolving, the lower bags and throwing down the dunnage. In the severe weather and the high sea the pumps were not able to be worked so as at once to bring the accumulation of water that passed from the port to the starboard side down below the dunnage in the starboard bilges, and in this way the water lines on both sides, as observed by the witnesses, were probably formed. When the captain and others went down into the lower hold after the heavy weather had subsided, about the fifth of August, i. e., between two and three weeks after the vessel was thrown upon her beam ends, they found the dunnage along the washed-out spaces all disarranged and down on each side. They endeavored to replace it to some extent, but could not do so effectively. No lights could be taken into the hold for fear of an explosion. During the remainder of the voyage, therefore, there was, in effect, no side dunnage at all along the washed out spaces to serve as a protection for that part of the cargo against the water that usually runs along the bilges. Hence
In this way, therefore, there is no doubt, I think, that the severe gale of tho nineteenth of July was the true cause of the loss. Had the side dunnage and the floor dunnage been securely fastened at the bilges, otherwise than by the bags themselves, comparatively little damage would probably have been done. If it was the custom with such cargoes to fasten the dunnage securely, then the neglect of this precaution would have made this bark liable. The case of The Tommy is cited, in which the omission to fasten the dunnage to prevent its falling in rough weather was held negligence, for which the ship was liable. 16 Fed. Bep. 601, 607. But the cargo there was of a wholly different character. To rebut the charge of negligence, it is sufficient to show that the ship has been dtmnagod in the manner usual and customary for such cargoes. Shear. Neg. § 6; Baxter v. Leland, 1 Blatchf. 526; Lamb v. Parkman, 1 Spr. 343, 351; The Titania, 19 Fed. Rep. 101, 107, 108; The George Heaton, 20 Fed. Rep. 323; Clark v. Barnwell, 12 How. 283; 3 Kent, *217.
The evidence in this case is to the effoct that the bags of nitrate formed a very compact and solid mass; that the dunnage which, in this case, was without other fastening than such as the bags afforded, was secured in the usual and customary manner. Of the various witnesses examined by the libelants, I have found none who testify that it was usual or customary to secure dunnage otherwise than was done in this case. The dunnage of the rest of the cargo was in place, and is proved to have been done in the customary manner. I have no right to assume, therefore, that it was negligence in the ship to rely upon the hags to keep the dunnage in place, whon it appears that such has been the usual practice with cargoes such as this.
There was no proof that the hark was not seaworthy when she left Pisagua. The water which dissolved the nitrates did not reach the cargo through her decks, nor, as in the case of Hubert v. Recknagel, through defects for -which the ship is answerable. 13 Fed. Rep. 912. The cargo between decks was uninjured. The water plainly reached the hold through leaks in the sides or water-ways
The libel is dismissed, with costs.