172 F.2d 673 | 10th Cir. | 1949
This was an action by James D. Williams
The change from .the original Converse transformers to the Allis Chalmers transformers was made about 4 P.M. on Saturday, July 7, 1945. When the current was turned' on, the electric pump refused to operate. Telluride was notified to change back to the original Converse transformers between 9 A.M. and 10 A.M. on Monday, July 9, but did not make the change back until the following Thursday, July 12, at 11:15 A.M. When the current was thereafter turned on the pump immediately began to operate. Under " the law of the case as laid down in the former appeal, Telluride became liable for any damage to the mine which occurred from approximately noon Monday, July 9, to the time when the change back was made on July 12.
The jury returned a verdict for plaintiff for $11,076.00. The items of damages and the amounts of each were stated to be as follows: Rehabilitation of the mine, $250.-00; dewatering the mine, $1110.00; loss of ore, $9716.00. Judgment was entered for $11,076.00. On a hearing on Telluride’s motion for a new trial, the judgment was modified by reducing the item for dewatering the mine from $1110.00 to $60.59, and the judgment was accordingly reduced to $10,026.59.
Telluride contends that the evidence entirely failed" to show what damages were caused before and what damages were caused after the change back to the Converse transformers should have been made, and therefore, no judgment could be entered against it.
Williams, the owner of the mine, testified that Winze No. 3 was 30 vertical feet below the 500 foot level in the mine; that Winze No. 2 was 55 vertical feet below the -level; and that Winze No. 4 was 75 vertical feet below that level; and that they were producing ore from Winze Nos. 2, 3, and 4. There was testimony that it was the practice to shut off the water pump during the eight hour working period and that during such time the water would rise to within 20 or 30 feet of the 500 .foot level; that at one time on a previous occasion the water pump was off for 36 hours, during which time there was a partial flooding of the mine; that no damage resulted to the mine from these floodings because the water was not permitted to stand for any period of time but was promptly pumped out.
There was also evidence that the hanging wall consisted of decomposed shale and limestone and that permitting the water to remain in the mine would cause it to percolate through all cracks and fissures in
O. C. Koch, Division Superintendent of the Power Company, testified that he went into the mine on Monday morning, July 9, and saw men working in the mine and saw them bring ore up to the hoist in cars, and that the hoist was on the 500 foot level. This testimony would warrant the jury in believing that the mine had not completely flooded at the time Telluride was required to make the change over. But even if the jury was of the view that the mine was completely flooded by noon July 9, under the evidence it still could have found that most of the damage to the oré body was caused by thereafter permitting the water to remain and thus permeate, saturate and loosen the structure. The jury was therefore warranted in finding that the damage, in part, was caused by the negligent delay on Telluride’s part in changing back to the Converse transformers after it had been notified to do so.
Damages are not recoverable unless they are clearly ascertainable both in their nature and origin, and unless it is also so established that they are the natural and proximate consequence of the breach and are not contingent or speculative.
As pointed out, Koch testified that he was at the 500 foot level on Monday, July 9, and saw Williams’ employees working at that level. Such workmen were not produced as witnesses at the trial. Telluride argues that the failure to produce these witnesses requires the presumption that their evidence was adverse to Williams’ contention and that the presumption therefore is that no men were working at the 500 foot level at that time. But even if such presumption is entertained, it does not require a different result. The jury was not bound by the presumption because here there was direct evidence that even if the mine was completely flooded at that time, the damage to the ore resulted from permitting the water to stand a long time and thus permeate and loosen the structure. Keeping in mind that it was not the flooding of the mine per se which caused the damage, then the actual water level at the time it became Telluride’s duty to make the change over in transformers is not decisive of the issue of damages.
Neither does it follow that the jury disregarded the instruction of the court that Telluride was liable for only that damage which occurred after it was duty bound to make the change over because the jury permitted a recovery of the full amount of $250.00 that it cost to rehabilitate the mine. The jury was warranted in finding that even if there was water in the mine before Telluride became liable, the water which entered the mine thereafter was sufficient to make the cost of rehabilitating the mine to the extent of $250.00 necessary. That the jury had clearly in mind the distinction between damage that occurred before Telluride became liable, and damage occurring thereafter is evidenced by the fact that it did not charge Telluride with liability for the full damage resulting from flooding of the mine.
Telluride further contends that the jury disregarded the instructions of the court as to Williams’ duty to mitigate the damage by recovering such ore as could thereafter be mined at a profit. The evidence on this question is in conflict. Lillie and Cramer, two engineering experts, did
Affirmed.
Herein called Williams.
Herein called Telluride. .
15 A.J. 413 — 414; 25 C.J.S., Damages, § 27, page 493.
15 A.J. 415; 25 C.J.S., Damages, § 28, pages 493-496; Story Parchment Co. v. Paterson Parchment Co., 282 U.S. 555, 51 S.Ct. 248, 75 L.Ed. 544; Bigelow v. R. K. O. Radio Pictures, 327 U.S. 251, 66 S.Ct. 574, 90 L.Ed. 652.