TECHNICAL CONSTRUCTION SPECIALTIES v. STEVE C. COOPER, ET AL.
No. 96021
Court of Appeals of Ohio, EIGHTH APPELLATE DISTRICT, COUNTY OF CUYAHOGA
October 13, 2011
2011-Ohio-5252
BEFORE: Blackmon, P.J., Stewart, J., and Boyle, J.
JOURNAL ENTRY AND OPINION; Civil Appeal from the Cuyahoga County Common Pleas Court, Case No. CV-676571; RELEASED AND JOURNALIZED: October 13, 2011
Daniel M. Walpole
ATTORNEYS FOR APPELLEES
Michael J. Murray Steven D. Shafron Berkman, Gordon, Murray & Devan 55 Public Square Suite 2200 Cleveland, Ohio 44113-1949
PATRICIA ANN BLACKMON, P.J.:
{¶ 1} Appellant Technical Construction Specialties (“TCS“) appeals the jury‘s verdict awarding $14,876.45 in damages in its favor, arguing the award is inadequate. TCS assigns the following errors for our review:
“I. The verdict awarding $14,876.45 in damages to TCS was against the manifest weight of the evidence, and that portion of the verdict must be reversed.”
“II. The trial court abused its discretion when it denied TCS‘s motion for a new trial as to the amount of damages the jury awarded.”
“III. The trial court abused its discretion when it denied TCS‘s motion for a judgment notwithstanding the verdict as to damages.”
Facts
{¶ 3} In August 2004, Entertainment USA, d.b.a. Christie‘s Cabaret, (“Entertainment“) decided to renovate its nightclub located in Cleveland‘s flats.
{¶ 4} The new design eliminated the support beams inside the club, requiring the building to be supported by exterior pillars. Entertainment retained Summit Testing (“Summit“) to analyze the soil around the club and sought bids from various vendors to install the exterior supports.
{¶ 5} On September 14, 2004, Entertainment‘s president, Steve Cooper, signed a contract with Technical Construction Specialties, Inc., d.b.a. Atlas Piers N.E.O. (“TCS“) to install 45 helical piers to the depth of at least 45 feet below the existing grade. The agreed total cost for the work was $56,783.
{¶ 6} Work began on Monday, November 8, 2004. After installing the first pier, TCS realized there was a problem because the pier went in at a depth of 86 feet, almost twice the depth that was projected. The president of TCS, Edward Sheeler, informed TCS‘s project manager, David Rogers, of the problem. It was decided that TCS would install two more piers to form a triangular pattern to determine whether the depth of the first pier was limited to that one location.
{¶ 7} David Rogers was not on site for the placement of the two other piers because he was needed at a site located in West Virginia. While Rogers was gone, TCS
{¶ 8} Rogers notified Steve Cooper that TCS had done the triangulation, but had also installed all the piers even though they were going in at least 80 feet, thereby, doubling the cost of the project. Steve Cooper was outraged and refused to pay the additional cost, arguing TCS was not authorized to use all the stock it had on site once it was aware the depth was much deeper than anticipated.
{¶ 9} As a result of the disagreement, Rogers scheduled a meeting for November 16, 2004 to discuss the additional cost and possible ways to rectify the design problem. The meeting was attended by Sheeler, Rogers, a representative from Summit, structural engineers from Huffman & Associates, and Entertainment‘s counsel. After the meeting, Sheeler sent Rogers a letter in which he recounted what had transpired at the meeting as follows:
{¶ 10} “At that meeting, the man sitting next to you asked why we kept going when we knew that the pier depth was a problem. My response to you during our telephone conversation was that we did notify you that the first pier had run about 75‘. I called you before the second pier was installed. I
{¶ 11} The letter does not indicate that Rogers authorized Sheeler to continue with the job. According to Rogers, he could not authorize Sheeler to continue without Steve Cooper agreeing to the change order. Because Cooper refused to pay TCS, TCS removed all of its equipment including the piers it had installed. TCS then filed suit against Entertainment.
{¶ 12} TCS requested $48,366 in contract damages and an additional $7,213 for costs it incurred removing its equipment and material from the site. The jury awarded TCS $14,876.45 in damages. Thereafter, TCS filed motions for a new trial and for judgment notwithstanding the verdict (“JNOV“), arguing that the jury‘s award of damages was inadequate and against the manifest weight of the evidence. The trial court denied both motions.
Inadequate Damages
Standards of Review
{¶ 14} In determining whether a verdict is against the manifest weight of the evidence, “[j]udgments supported by some competent, credible evidence going to all the essential elements of the case will not be reversed by a reviewing court as being against the manifest weight of the evidence.” C.E. Morris Co. v. Foley Const. Co. (1978), 54 Ohio St.2d 279, 280, 376 N.E.2d 578. When reviewing the sufficiency of the evidence in civil cases, the question is whether, after viewing the evidence in a light most favorable to the prevailing party, the judgment is supported by competent, credible evidence. Id. Put more simply, the standard is “whether the verdict [is] one which could be reasonably reached from the evidence.” Hartford Cas. Ins. Co. v. Easley (1993), 90 Ohio App.3d 525, 630 N.E.2d 6. When engaging in this analysis, an appellate court must remember that the weight and credibility of the evidence are better determined by the trier of fact. Id.
{¶ 15} A motion for new trial is governed by
{¶ 17} The standard of review for a JNOV motion is the same as that for a directed verdict. Construing the evidence most strongly in favor of the party against whom the motion is directed, the motion must be overruled unless reasonable minds could reach no other conclusion but that, under the applicable law, the movant is entitled to judgment in his favor.
{¶ 18} Additionally, the assessment of damages is generally within the purview of the jury. Moskovitz v. Mt. Sinai Med. Ctr. (1994), 69 Ohio St.3d 638, 655, 635 N.E.2d 331; Weidner v. Blazic (1994), 98 Ohio App.3d 321, 334, 648 N.E.2d 565. The jury‘s verdict will not be disturbed absent an affirmative showing of passion or prejudice. Moskovitz at 655. Passion or prejudice is shown where the jury‘s assessment of damages
Analysis
{¶ 19} The contested issue in this trial was whether TCS had authority to proceed to install the remaining piers once it discovered the piers installed in the triangle formation was at a depth of at least 80 feet, which was almost twice the depth projected. TCS contends that Sheeler‘s discussions with Roger and Roger‘s failure to issue a stop work order, gave it the authority to proceed. However, the jury could have easily concluded that TCS should not be awarded damages beyond the triangulation and subsequent removal of the piers installed up to and including the triangulation because it was not authorized to proceed with the project once the triangulation showed the depth would be a problem at the entire site.
{¶ 20} David Rogers testified that after the first pier went in at the depth of 86 feet he discussed the problem with Entertainment President Steve Cooper. They agreed that a triangulation of the area should be done to determine the extent of the problem. Rogers testified that if the depth was going to be a problem throughout the design, they would then have the opportunity to create another design. Entertainment, however, never had the opportunity to discuss another design because TCS continued to install the entire stock of piers at the additional depth. In fact, by the time Rogers was given the change order, TCS had installed 15 additional piers.
{¶ 22} TCS also claims the contract authorized it to proceed to install the piers because there was a provision in the contract quoting the cost of additional piers should they be required. However, it was within the jury‘s discretion to determine whether this provision applied to material changes that would result in doubling the costs of the contract or only applied to the occasional use of additional piers in completing the project. Moreover, if this provision is read to apply to even material changes to the contract, there would have been no need to perform the triangulation as the contract would have obligated Entertainment to allow TCS to continue with the project regardless of the additional cost.
{¶ 23} Based on this evidence, we conclude the jury could have reasonably determined that although Entertainment breached the contract by not paying TCS, TCS
{¶ 24} Thus, we conclude the court did not abuse its discretion in denying TCS‘s motions and the jury verdict was not against the manifest weight of the evidence. Accordingly, TCS‘s three assigned errors are overruled.
Judgment affirmed.
It is ordered that appellees recover from appellant their costs herein taxed.
The court finds there were reasonable grounds for this appeal.
It is ordered that a special mandate be sent to said court to carry this judgment into execution.
PATRICIA ANN BLACKMON, PRESIDING JUDGE
MELODY J. STEWART, J., and
MARY J. BOYLE, J., CONCUR