90 Fed. Cl. 531 | Fed. Cl. | 2009
MEMORANDUM OPINION AND ORDER
I. RELEVANT FACTS AND PROCEDURAL HISTORY.
On December 12, 2008, the National Guard Bureau (“NGB”) issued Solicitation No. W9133L-09-R-00007 for “Child and Youth training management, program assessment, curriculum development, supervision and assessment to the 54 States and Territories” (the “Solicitation”). Gov’t App. at 2. The Solicitation was a Total Service-Disabled Veteran-Owned Small Business Set-Aside. Id. The NGB received proposals from six offerors, including Taylor Consultants, Inc. (“Plaintiff’) and Veteran Enterprise Technology Services (“VETS”). Id. at 15. On January 24,2009, the NGB determined that Plaintiffs proposal was the “best value.” Id. at 15, 35. Although pre-award notification is required by Federal Acquisition Regulation (“FAR”) 15.503(a)(2) the contacting officer (“CO”) failed to notify unsuccessful offerors that Plaintiff was the prospective awardee. Id. On January 25, 2009, NGB awarded Contract No. W9133L-09-C-00007 to Plaintiff for $4,290,899.28 (“the January 25, 2009 Contract”). Compl. ¶ 16; see also Gov’t App. at 35.
On January 30, 2009, VETS filed a size protest with the CO alleging that Plaintiff did not qualify as a small business and was not eligible to be awarded the Contract. Compl. ¶ 17; see also Gov’t App. at 35. On February 5, 2009, the NGB forwarded VETS’ protest to the Small Business Administration (“SBA”) and the SBA ordered Plaintiff to suspend work, pending the SBA’s disposition. Gov’t App. at 15.
On April 28, 2009, the SBA found that Plaintiff was “other than small,” with respect to “the subject procurement and for all revenue based size standards.” Id. at 12. That same day, Plaintiff requested reconsideration of the SBA’s size determination. Compl. ¶ 23.
On May 1, 2009, the SBA denied Plaintiffs request for reconsideration. PI. Ex. 3. Aso on May 1, 2009, the NGB re-evaluated the other proposals and determined that VETS’ proposal provided the “best value.” Gov’t App. at 14-26. That same day, the NGB sent pre-award notifications of VETS’ selection as the prospective awardee to the other offerors, but excluded Plaintiff. Id. at 27-31.
On May 5, 2009, Plaintiffs counsel sent an e-mail to the NGB “formalizing] an agency protest,” in the event that the NGB decided to terminate the January 25, 2009 Contract and award it to another offeror. Id. at 32. The NGB considered this an agency protest, as well as a claim under the Contract Dis
On May 8, 2009, at 4:05 p.m. CST, the NGB issued a decision dismissing Plaintiffs May 5, 2009 protest, because the SBA determined that Plaintiff was not a small business and therefore not an “interested party,” as required by FAR 33.101. Pl. Ex. 4; see also Gov’t App. at 35-38. The NGB also stated that and the protest was filed prior to any termination and was therefore not ripe. Id. The May 8, 2009 NGB decision, however, did not address Plaintiffs potential termination claim. Pl. Ex. 4. At 4:08 p.m. CST that same day, the NGB cancelled the January 25, 2009 contract with Plaintiff and awarded a contract to VETS (“the May 8, 2009 Contract”). Compl. ¶ 30. At 5:30 p.m. CST, Plaintiff renewed the May 5, 2009 protest with the NGB and also filed a separate protest with the SBA, challenging VETS’ small business representation. Pl. Ex. 4.
On May 11, 2009, Plaintiff appealed the SBA’s April 28, 2009 size determination to the SBA’s Office of Hearing and Appeals (“OHA”). Compl. ¶ 37. Plaintiff also requested that performance under the May 8, 2009 Contract be stayed pending OHA review. Id. ¶ 29. On that date, the NGB also denied Plaintiffs stay request. Pl. Ex. 4. In addition, on May 12,2009, the SBA dismissed Plaintiffs May 8, 2009 protest regarding the May 8, 2009 Contract, because of the SBA’s April 28, 2009 size determination that Plaintiff was “other than small” and therefore was not an “interested party.” Gov’t App. at 39.
On May 13, 2009, Plaintiff filed under seal a Complaint in the United States Court of Federal Claims, pursuant to the Tucker Act, 28 U.S.C. § 1491(b), and the Contract Disputes Act, 41 U.S.C. § 601, et seq. (“CDA”). The Complaint requested an injunction requiring the NGB to disqualify VETS and terminate the May 8, 2009 Contract. The Complaint also requested lost profits, or in the alternative, reinstatement of the January 25, 2009 Contract. Compl. ¶ 41. On May 19, 2009, the Government filed a Motion To Dismiss, pursuant to RCFC 12(b)(1) and (6) (“Gov’t Mot.”). On May 20, 2009, Plaintiff filed a Request That The Full Administrative Record Be Filed.
On May 27, 2009, Plaintiff appealed the SBA’s May 12, 2009 dismissal of the protest regarding the NGB award of the May 8, 2009 Contract. 7/2/09 Pl. St. Rep. Enel. 1. At the parties’ request, on June 2, 2009, the court held an oral argument on the Government’s May 19, 2009 Motion to Dismiss (“TR”).
On July 1, 2009, the OHA affirmed the SBA’s April 28, 2009 size determination as to Plaintiff. 7/2/09 Pl. St. Rep. On June 5, 2009 the NGB issued a stop work order on Contract No. W9133L-09-C-00007, pending a decision in this case. Pl. 6/10/09 St. Rep. On July 7, 2009, the OHA affirmed the SBA’s May 12, 2009 dismissal of Plaintiffs protest regarding the May 8, 2009 Contract and denied Plaintiffs appeal. 7/8/09 Pl. St. Rep.
On August 13,2009, Plaintiff filed a Motion For Leave to File Plaintiffs First Amended Complaint And Request For Injunctive Relief (“First Am. Compl”). In addition to the 28 U.S.C. § 1491(b) claims alleged in the May 13, 2009 Complaint, the Fust Amended Complaint challenged the July 2, 2009 and July 7, 2009 OHA decisions, respectively affirming the SBA’s April 28, 2009 size determination regarding Plaintiff and the SBA’s May 12, 2009 dismissal of Plaintiffs size protest regarding VETS. Fust Am. Compl. ¶ 7. On August 31, 2009, the Government filed a Renewed Motion To Dismiss And Response (“Gov’t Ren. Mot.”).
II. DISCUSSION.
A. Jurisdiction.
The jurisdiction of the United States Court of Federal Claims is established by the Tucker Act, 28 U.S.C. § 1491. This Act authorizes the court “to render judgment upon any claim against the United States founded either upon the Constitution, or any Act of Congress or any regulation of an executive department, or upon any express or implied contract with the United States, or for liquidated or unliquidated damages in cases not sounding in tort.” Id. § 1491(a)(1). The Tucker Act, however, is “a jurisdictional statute and it does not create any substantive right enforceable against the United States for money damages.... [T]he Act merely confers jurisdiction upon [it] whenever a sub
The May 13, 2009 Complaint asserts two causes of action: a CDA claim under 41 U.S.C. § 609(a) for improper or bad faith termination of Contract No. W 9133 L-09-C-00007; and a post-award protest of the Government’s actions in terminating Contract No. W9133L-09-C-00007 awarding the May 8, 2009 Contract, invoking jurisdiction under 28 U.S.C. § 1491(b). Compl. ¶4-6 (“As such, this complaint constitutes both a claim and protest against [the Government].”); see also id. ¶¶ 5-6, 40-48. The court’s jurisdiction to adjudicate the claims alleged in the Complaint and the additional claims in the First Amended Complaint regarding the July 2, 2009 and July 7, 2009 OHA decisions is discussed herein.
B. Standard For Decision On A Motion To Dismiss, Pursuant To RCFC 12(b)(1).
A challenge to the “[United States Court of Federal Claims’] general power to adjudicate in specific areas of substantive law ... is properly raised by a [Rule] 12(b)(1) motion[.]” Palmer v. United States, 168 F.3d 1310, 1313 (Fed.Cir.1999). When considering whether to dismiss an action for lack of subject matter jurisdiction, the court is “obligated to assume all factual allegations to be true and to draw all reasonable inferences in plaintiffs favor.” Henke v. United States, 60 F.3d 795, 797 (Fed.Cir.1995). Nonetheless, the plaintiff bears the burden of establishing jurisdiction by a preponderance of the evidence. Reynolds v. Army & Air Force Exch. Serv., 846 F.2d 746, 748 (Fed.Cir.1988) (“[O]nee the [trial] court’s subject matter jurisdiction [is] put in question ... [the plaintiff] bears the burden of establishing subject matter jurisdiction by a preponderance of the evidence.”).
C. Standard For Decision On A Motion To Dismiss, Pursuant To RCFC 12(b)(6).
On May 18, 2009, the United States Supreme Court issued Ashcroft v. Iqbal, — U.S. -, 129 S.Ct. 1937, 173 L.Ed.2d 868 (2009), restating the pleading standard previously discussed in Bell Atlantic Corp. v. Twombly, 550 U.S. 544, 127 S.Ct. 1955, 167 L.Ed.2d 929 (2007). To survive a Fed.R.Civ.P. 12(b)(6) motion to dismiss, a complaint must “state a claim to relief that is plausible on its face,” i.e., sufficient factual content must be pled on which a court may “draw the reasonable inference that the defendant is liable for the misconduct alleged.” Iqbal, 129 S.Ct. at 1949 (citing Twombly, 550 U.S. at 556, 127 S.Ct. 1955). The Court explained that the plausibility standard “asks for more than a sheer possibility that [the] defendant has acted unlawfully.” Id. “Plausibility of ‘entitlement to relief ” requires more than pleading facts that are “merely consistent with” a defendant’s liability. Id. (quoting Twombly, 550 U.S. at 557, 127 S.Ct. 1955).
In Iqbal, the Court discussed, in detail, the “two working principles” of Twombly’s heightened pleading requirements. Id. First, although factual allegations alleged must be accepted as true, the trial court is “not bound to accept as true a legal conclusion couched as a factual allegation.” Id. at 1949-50, 129 S.Ct. 1937 (citing Twombly, 550 U.S. at 555, 127 S.Ct. 1955). Accordingly, the Court advised trial courts to begin their analysis “by identifying the allegations [of law] in the complaint that are not entitled to the assumption of truth.” Id. at 1951, 129 S.Ct. 1937. If the legal allegations are of a
D. Filing The Administrative Record Was Not Required In This Case.
The Rules of the United States Court of Federal Claims provide that, in bid protest eases filed under 28 U.S.C. § 1491(b), the court will hold an initial status conference after the filing of a complaint to discuss relevant issues, including the content and time for filing the administrative record. RCFC App. C(IV) ¶ 8(e). In this case, the court convened an initial status conference on May 18, 2009, at which the Government advised the court it planned to file a Motion To Dismiss, so that filing the administrative record would be deferred until after the court issued a decision on this dispositive motion.
On May 20, 2009, Plaintiff requested that the “full” administrative record be filed, arguing that the Government’s Motion To Dismiss is inappropriate in light of the “grossly incomplete record.” PI. Resp. at 1-2. The Government responded that the court had an adequate record on which to decide the pending jurisdictional motion. Gov’t Reply at 2-4. Plaintiff bears the burden to establish jurisdiction. Id. Since a motion to dismiss for failure to state a claim “simply tests” the sufficiency of a complaint, an administrative record is not required. Id.
Early production of an administrative record may expedite the final resolution of a case. The court has determined, however, that the Administrative Record is not required in this case to resolve the Government’s pending motion. OTI America, Inc. v. United States, 68 Fed.Cl. 108, 118 (2005) (ruling on the Government’s motion to dismiss without a complete Administrative Record). Accordingly, Plaintiffs May 20, 2009 Request That The Full Administrative Record Be Filed is denied.
E. The Government’s May 19, 2009 Motion To Dismiss, Pursuant To RCFC 12(b)(1), (6).
1. Plaintiffs Post-Award Tucker Act Protest.
a. The Government’s Argument.
The Government moves to dismiss Plaintiff’s post-award bid protest on three grounds. First, Plaintiff does not have standing to protest the May 8, 2009 Contract, because Plaintiff is not an “interested party,” as required by 28 U.S.C. § 1491(b)(1). Gov’t Mot. at 1, 7. This procurement was a small business set-aside. Id. at 8. On April 29, 2009, the SBA determined that Plaintiff was “other than small.” Id. Pursuant to 13 C.F.R. § 121.1004(c),
b. Plaintiff’s Response.
Plaintiff responds that it is an “interested party,” because it was awarded the January 25, 2009 Contract “and its only obstacle to having that [Cjontract reinstated is a wrongly decided [and] inapplicable SBA deeision[.]” PI. Resp. at 12-13. The NGB initially was satisfied that Plaintiff was a small business. Id. at 13. Therefore, the Government’s subsequent attack on Plaintiffs size is too late and moot. Id.
Plaintiff also contends that the NGB erred in relying on the April 28, 2009 SBA size determination, because it was not based on Plaintiffs present business status, but a prior size determination. PI. Resp. at 13; see also TR at 33, 40-44. In 2006, the SBA found that Plaintiff was “other than small” for a procurement with a six million dollar size. Id. The procurement in this case, however, has a size standard of seven million dollars. Id. Section 121.1009(g)(5) of Title 13 the Code of Federal Regulations provides that “[a] concern determined to be other than small under a particular size standard is ineligible for any procurement ... which requires the same or a lower size standard^] ... After an adverse size determination, a concern cannot self-eertify as small under the same or lower size standard unless it is first recertified as small by [the] SBA.” 13 C.F.R. § 121.1009(g)(5). Because the 2006 size determination was $1 million less than the Solicitation in this ease, Plaintiff did not need re-eertifieation by the SBA. Pl. Resp. at 13-14. Accordingly, the SBA’s application of the 2006 size determination to the current procurement violated 13 C.F.R. § 121.1009(g)(5) and the Government erred in relying on the SBA 2006 size determination in awarding the January 25, 2009 Contract to VETS. Id. at 13.
Plaintiff also points out that, pursuant to FAR §§ 19.302(g)(l-2), (j), and (k),
Plaintiff also asserts that exhaustion of administrative remedies is not a prerequisite for the court to enjoin an invalid application of procurement statutes and regulations. PI. Resp. at 15-16; see also TR at 51. Here, Plaintiff explains that it is not challenging the SBA’s April 28, 2009 size determination, but is asking the court to rule whether the NGB violated FAR requirements and to enjoin the award of the May 8, 2009 Contract to VETS, pursuant to 28 U.S.C. § 1491(b)(2) and 5 U.S.C. § 706. Id.
Specifically, when the NGB forwarded VETS’ January 30, 2009 protest to the SBA, the NGB failed to alert the SBA that Contract W9133L-09-C-00007 had been awarded to Plaintiff, as it was required to do under FAR 19.302(d), (h)(3). Id. at 18. The SBA then failed to issue a decision within ten business days, in accordance with 13 C.F.R. § 121.1009(g). Id. at 19. Nevertheless, the NGB stayed Plaintiffs performance of the January 25, 2009 Contract and violated FAR 19.302(h)(1), by applying the April 28, 2009 size determination retroactively, despite the fact that a size determination only affects future contracts. 48 C.F.R. § 19.302(h)(1) (“After receiving a protest involving an offer- or being considered for award, the contracting officer shall not award the contract until (i) the SBA has made a size determination or (ii) 10 business days have expired since SBA’s receipt of a protest, whichever occurs first.”).
Therefore, the Government cannot argue that it canceled the January 25, 2009 Contract, because of the SBA’s subsequent April 28, 2009 size determination, and also argue that the May 8, 2009 post-4:08 P.M. CST VETS award is “presumptively valid,” because Plaintiff challenged the bona fides of VETS’ size after the May 8, 2009 Contract was awarded to VETS. PI. Resp. at 22-23.
c. The Government’s Reply.
The Government replies that PlaintifPs argument is unfounded, because a “timely filed protest applies to the procurement in question even though a contracting officer awarded the contract prior to receipt of the protest.” Gov’t Reply at 4-5 (quoting 13 C.F.R. § 121.1004(c)). Moreover, FAR 19.301-l(c) provides that: “[ijf an offeror’s small business status is challenged, the SBA will evaluate the status of the concern and make a determination, which will be binding on the contracting officer[.]” 48 C.F.R. § 19.301-1(c) (emphasis added). The distinction that Plaintiff attempts to draw between an “offer- or” and an “awardee” under FAR 19.301-l(c) likewise is misplaced, because that regulation authorizes challenges only to awarded con
Therefore, although FAR 19.302(g)(2)
d. The Court’s Resolution.
The May 13, 2009 Complaint alleges that: the Government violated “several procurement statutes and regulations”
i. Plaintiff Does Not Have Standing To Protest The May 8, 2009 Contract Award.
The United States Supreme Court has held that the party invoking federal jurisdiction bears the burden of establishing standing. Summers v. Earth Island Inst., - U.S. -, 129 S.Ct. 1142, 1149, 173 L.Ed.2d 1 (2009). In this case, Plaintiff alleges standing under Section 1491(b)(1) of the Tucker Act, as amended by the Administrative Dispute Resolution Act of 1996 (“ADRA”), Pub.L. No. 104-320, § 12(a) 110 Stat. 3870 (1996), that authorizes the United States Court of Federal Claims to:
render judgment on an action by an interested party objecting to a solicitation by a federal agency for bids or proposals for a proposed contract or to a proposed award or the award of a contract or any alleged violation of statute or regulation in connection with a procurement or a proposed procurement.
28 U.S.C. § 1491(b)(1) (emphasis added).
To establish standing as an “interested party” under Section 1491(b)(1), the United States Court of Appeals for the Federal Circuit has held that the protestor must establish that it is “an actual or prospective bidder ... whose direct economic interest would be affected by the award of the contract or by failure to award the contract.” Am. Fed’n of Gov. Employees v. United States, 258 F.3d 1294, 1302 (Fed.Cir.2001) (internal citations omitted). A critical component of the “direct economic interest” element requires that a protestor establish that any alleged errors caused the protestor “prejudice.” Myers Investigative & Sec. Svcs., Inc. v. United States, 275 F.3d 1366, 1370 (Fed.Cir.2002) (“In fact, prejudice (or injury) is a necessary element of standing.”). Accordingly, the United States Court of Appeals for the Federal Circuit has held that an actual or prospective bidder is prejudiced only if that entity had a “substantial chance” of winning the contract award, but for the Government’s error. Bannum, Inc. v. United States, 404 F.3d 1346, 1358 (Fed.Cir.2005).
The procedures for challenging small business set-aside eligibility are set forth in Part 121 of Title 13 of the Code of Federal Regulations, “Small Business Size Regulations.” 13 C.F.R. §§ 121.1001-121.1110. These regulations afford “[a]ny offeror whom the contracting officer has not eliminated for reasons unrelated to size” to protest a small business set-aside procurement. 13 C.F.R. § 121.1001(a)(1). The protest, however, must be timely, i.e., “received by the contracting officer prior to the close of business on the [fifth] day, exclusive of Saturdays, Sundays, and legal holidays, after the contracting officer has notified the protestor of the identify of the prospective awardee.” 13 C.F.R. § 121.1004(a)(2). A timely protest, however, only “applies to the procurement in question[,] even though a contracting officer awarded the contract prior to receipt of the protest.” 13 C.F.R. § 121.1004(c).
The Small Business Size Regulations mandate that a SBA size determination becomes effective immediately and “remains in full force and effect unless and until reversed by OHA.” 13 C.F.R. § 121.1009(g)(1); see also 48 C.F.R. § 19.301-1 (c) (“[i]f an offeror’s small business status is challenged, the SBA[’s] ... determination ... will be binding on the contracting officer, as to whether the offeror is a small business”); Ironclad/EEI v. United States, 78 Fed.Cl. 351, 364 (2007) (“SBA’s decision that plaintiff was ‘other than small’ became effective immediately after issuance, and was binding on the subject procurement, as a matter of law.”). Therefore, in this case, once the SBA determined that Plaintiff was “other than small,” Plaintiff was not eligible to be awarded any procurement of the same or lesser size, unless and until Plaintiff was recertified. 13 C.F.R. § 121.1009(g)(5). Moreover, an appeal of a SBA size determination to OHA affects a current procurement only if OHA issues a decision prior to a contract award:
If the formal size determination is appealed to OHA, the OHA decision on appeal will apply to the pending procurement or sale if the decision is received before award. OHA decisions received after contract award will not apply to that procurement or sale, but will have future effect, unless the contracting officer agrees to apply the OHA decision to the procurement or sale.
13 C.F.R. § 121.1009(g)(3) (emphasis added).
In this case, Plaintiff was awarded a contract on January 25, 2009. Compl. ¶ 16. Five days later, VETS filed a SBA size protest. Gov’t App. at 6. On April 28, 2009, the SBA determined that Plaintiff was “other than small,” effective immediately, thereby rendering Plaintiff ineligible to be awarded a contract under Solicitation No. W9133L-09-C-00007. 13 C.F.R. §§ 121.1004(c), 121.1009(g)(1). Although Plaintiff filed a timely appeal of the SBA’s April 28,2009 size determination to the OHA, that determination applied to the January 25, 2009 Contract at issue, because OHA did not issue a final decision prior to the May 8, 2009 award to
In an attempt to surmount this barrier to standing, Plaintiff argues that the Small Business Size Regulations are not applicable in this case, because they apply only to a “prospective awardee.” 13 C.F.R. § 121.1004(a)(2) (stating that a timely protest is one that is “received by the contracting officer prior to the close of business on the [fifth] day, exclusive of Saturdays, Sundays, and legal holidays, after the contracting officer has notified the protestor of the identity of the prospective awardee. ”) (emphasis added). Plaintiff insists it was not a “prospective awardee,” but an “awardee.” TR at 66. Therefore, VETS’ January 30,2009 SBA protest was not timely and the January 25, 2009 Contract was not subject to challenge. Id. In the alternative, Plaintiff argues that since it was a qualified small business on January 25, 2009, the award on that date was valid, and the Government’s subsequent attack on Plaintiff’s size is both late and moot. PI. Resp. at 12-13.
Plaintiffs arguments are misplaced. First, VETS’ January 30, 2009 SBA protest was timely and the SBA’s April 28, 2009 size decision properly was effective retroactively to the January 25, 2009 Contract award, because SBA size determinations are not limited to the pre-award period. 13 C.F.R. § 121.1004. In addition, the term “prospective awardee” must be read to be consistent with FAR 15.503(a)(2), requiring that unsuccessful bidders be afforded pre-award notice of the “potential awardee.” 48 C.F.R. § 15.503(a)(2). Moreover, Section 121.1004(a)(5) anticipated a situation where, as in this ease, the CO failed to make the required notification to unsuccessful offerors, as required by FAR 15.503(a)(2). Section 121.1004(a)(5) ensures that a CO’s failure to provide the requisite pre-award notification will not deprive unsuccessful offerors of the opportunity to file a timely protest:
No notice of award. Where there is no requirement for written pre-award notice or notice of award, or where the contracting officer has failed to provide written notification of award, the 5-day protest period will commence upon oral notification by the contracting officer or authorized representative or another means (such as public announcements or other oral communications) of the identity of the apparent successful offeror.
Section 121.1004(a)(5); see also Matter of: Spectrum Security Services, Inc., 2005 WL 3578774, Comp. Gen. Dec. B-297320.2, 2005 CPD ¶ 227 (“[W]here the agency failed to give the required pre-award notice, we have sustained protests and recommended the termination of contracts awarded to the concerns that were determined to be large businesses.”).
In addition, a timely protest takes precedence even if a contract has been awarded. 13 C.F.R. § 121.1004(e) (“A timely filed protest applies to the procurement in question even though a contracting officer awarded the contract prior to receipt of the protest.”). As the GAO has recognized:
[I]t is inconsistent with the integrity of the Small Business Act, 15 U.S.C. § 631 et seq., to permit a large business, which was ineligible under the terms of the solicitation, to continue to perform the contract. In this regard, a formal size determination by the SBA becomes effective immediately and remains in full force and effect unless and until reversed by the SBA’s OHA, 13 C.F.R. § 121.1009(g)(l)[.]
Matter of: Spectrum Security Services, Inc., 2005 WL 3578774, Comp. Gen. Dec. B-297320.2, 2005 CPD ¶ 227.
Likewise, in this case, the SBA’s April 28, 2009 size determination affected the legitimacy of Plaintiffs January 25, 2009 award, because VETS’ January 30, 2009 protest was timely. Delaney v. United States, 56 Fed.Cl. 470, 476 (2003) (holding that size protest filed post-award may be controlling, if contracting officer decided to re-award the contract).
Therefore, in this case, even if the CO received notice of the pending OHA appeal, unless an OHA decision was issued prior to the May 8, 2009 re-award of the contract, the CO retained complete discretion to reinstate the January 25, 2009 Contract to Plaintiff or terminate it and award the May 8, 2009 Contract to another bidder. 13 C.F.R. § 121.1009(g)(3).
ii. Plaintiff Does Not Have Standing To Protest The National Guard Bureau’s Alleged Bad Faith Termination Of The January 25, 2009 Contract.
The May 13, 2009 Complaint also “protests” NGB’s “disparate treatment of Plaintiff’ and alleges “bad faith in terminating Plaintiffs [January 25, 2009] [C]ontract [as a] violation of several procurement statutes and regulations.” Compl. ¶ 44. The Tucker Act authorizes the court to “render judgment on an action by an interested party objecting to a solicitation by a federal agency for bids or proposals for a proposed contract or to a proposed award or the award of a contract or any alleged violation of statute or regulation in connection with a procurement or a proposed procurement.” 28 U.S.C. § 1491(b)(1) (emphasis added). In Distributed Solutions, Inc. v. United States, 539 F.3d 1340 (Fed.Cir.2008), the United States Court of Appeals for the Federal Circuit defined “procurement” broadly, “inelud[ing] all stages of the process of acquiring property or services, beginning with the process for determining a need for property or services and ending with contract completion and
The United States Court of Appeals for the Federal Circuit, however, also has held that the term “interested party” in 28 U.S.C. § 1491(b) is limited to “actual or prospective bidders or offerors whose direct economic interest would be affected by the award of the contract or by failure to award the contract.” Am. Fed’n of Gov’t Employees, 258 F.3d at 1302. In this case, Plaintiff was a contract awardee. But the May 13, 2009 Complaint does not challenge the “award of the contract [to another] or [the] failure to award the contract.” Id. Therefore, Plaintiff does not have standing to protest the NGB’s alleged January 25,2009 “bad faith” termination, pursuant to 28 U.S.C. § 1491(b).
The United States Court of Appeals for the Federal Circuit, however, has held bad faith termination claims may be brought under the CDA. Krygoski Const. Co., Inc. v. United States, 94 F.3d 1537, 1541 (Fed.Cir.1996) (“A contracting officer may not terminate for convenience in bad faith, for example, simply to acquire a better bargain from another source. When tainted by bad faith or an abuse of contracting discretion, a termination for convenience causes a contract breach.”); see also Data Monitor Systems, Inc. v. United States, 74 Fed.Cl. 66, 71 (2006) (“As an initial matter, defendant is correct in asserting that the court lacks jurisdiction to enjoin the Air Force’s termination of DMS’s contract.... Such a challenge may only be brought under the CDA, which requires that a claim first be submitted to the contracting officer.”). Therefore, Plaintiffs “bad faith termination” claim could be alleged under the CDA “when the protestor sought to challenge the [G]overnment’s termination for convenience of a contract.” 28 U.S.C. § 1491(a)(2);
For these reasons, Plaintiffs “[bid] protest counts,” i.e., Compl. ¶¶ 44-45, regarding the NGB’s alleged “bad faith” termination of the January 25, 2009 Contract are dismissed for lack of subject matter jurisdiction. Dalton v. Sherwood Van Lines, Inc., 50 F.3d 1014, 1017 (Fed.Cir.1995) (“When the Contract Disputes Act applies, it provides the exclusive mechanism for dispute resolution; the Contract Disputes Act was not designed to serve as an alternative administrative remedy, available at the contractor’s option.”) (emphasis added). Plaintiff, however, may re-assert these claims, if they are first properly submitted to the CO, as discussed below,
iii. Decisions Of The Small Business Administration And Office Of Hearings And Appeals Decisions Are Non-Justiciable.
On August 13, 2009, Plaintiff filed a Motion For Leave To File A First Anended Complaint And Request For Injunctive Relief (“Motion For Leave”) and enclosed a proposed First Amended Complaint and Request for Injunctive Relief (“Am. Compl.”). The only substantive difference between Plaintiffs May 13, 2009 Complaint and the proposed August 13, 2009 Amended Complaint is that the latter includes a “protest” directly challenging the OHA’s July 1, 2009 and July 7, 2009 decisions as “arbitrary, irrational, and/or otherwise not in accordance with applicable procurement law and regulation.” Am. Compl. ¶ 7.
On August 31, 2009, the Government responded to Plaintiffs August 13, 2009 Motion for Leave by filing a Renewed Motion To Dismiss And Response To Plaintiffs Motion For Leave To File Plaintiffs First Amended Complaint (“Gov’t Ren. Mot.”). The Government contends that Plaintiff should have filed a motion to file a supplemental pleading, pursuant to RCFC 15(d) rather than a motion to amend the complaint, pursuant to RCFC 15(a). Gov’t Ren. Mot. at 6. The Government asserts that the only reason behind Plaintiffs Motion To Amend is to incor
RCFC 15(a)(2) states in relevant part that “a party may amend its pleading only with the opposing party’s consent or the court’s leave. The court should freely give leave when justice so requires.” RCFC 15(a)(2) (emphasis added). In considering Plaintiffs August 13, 2009 Motion, the court is mindful of the United States Supreme Court’s admonition in Foman v. Davis, 371 U.S. 178, 83 S.Ct. 227, 9 L.Ed.2d 222 (1962) that Rule 15(a)’s “mandate is to be heeded.” Id. at 182, 83 S.Ct. 227. The decision to allow or deny an opportunity to amend is within the sound discretion of the court. Id. Foman makes clear, however, that the decision to deny a plaintiff the opportunity to amend without any stated justification is an abuse of discretion. Id. Nevertheless, Foman provided five reasons that would justify denial of a motion for leave to amend a complaint:
In the absence of any apparent or declared reason-such as [1] undue delay, [2] bad faith or dilatory motive on the part of the movant, [3] repeated failure to cure deficiencies by amendments previously allowed, [4] undue prejudice to the opposing party by virtue of allowance of the amendment, [5] futility of amendment, etc.-the leave sought should, as the rules require, be ‘freely given.’
Id.
In examining Foman’s fifth rationale, “futility of the amendment,” the United States Court of Appeals for the Federal Circuit has held that, “[i]n assessing ‘futility,’ the [trial] court applies the same standard of legal sufficiency as [it] applies under Rule 12(b)(6).” Merck & Co., Inc. v. Apotex, Inc., 287 Fed.Appx. 884, 888 (Fed.Cir.2008) (quoting In re Burlington Coat Factory Sec. Litig., 114 F.3d 1410, 1434 (3d Cir.1997)). Therefore, if Plaintiffs proposed August 13, 2009 Amended Complaint does not present any new claims for relief that would survive a RCFC 12(b)(6) motion to dismiss, leave should not be granted.
The proposed August 13, 2009 Amended Complaint alleges no new facts that were not previously presented in numerous status reports. 6/10/09 PL St. Rep; 7/2/09 Pl. St. Rep.; 7/6/09 Gov’t St. Rep; 7/6/09 Pl. St. Rep.; 7/8/09 Pl. St. Rep. These post-complaint facts, namely the July 2, 2009 and July 7, 2009 OHA, decisions are not sufficient to support a claim that would survive a RCFC 12(b)(6) motion to dismiss, because appeal of these OHA decisions is not justiciable. Whether a question is justiciable is distinct from whether the court has jurisdiction. Baker v. Carr, 369 U.S. 186, 198, 82 S.Ct. 691, 7 L.Ed.2d 663 (1962) (describing the distinction between jurisdiction and justiciability as “significant” in that justiciability depends on “whether the duty asserted can be judicially identified and its breach judicially determined, and whether protection for the right asserted can be judicially molded”); see also Murphy v. United States, 993 F.2d 871, 872 (Fed.Cir.1993) (“[T]he existence of jurisdiction does not confirm the court’s ability to supply relief ... The issue must also be justiciable; it must be within the competency of the court.”); Int’l Mgmt. Svcs. Inc., 80 Fed. Cl. at 9. In this case, the court is unable to provide Plaintiff with the requested injunctive relief. As discussed infra, PlaintifPs failure to appeal the April 28, 2009 SBA size determination to the OHA prior to the May 8, 2009 award to VETS, as a matter of law, created a presumptively valid contract that now cannot be invalidated by the court. Chapman, 63 Fed.Cl. at 35. When the United States Court of Federal Claims has exercised jurisdiction to review SBA and OHA size determinations, it has recognized the non-justiciability of such cases, if the contract becomes presumptively valid by virtue of an award prior to the CO being notified of an appeal to the OHA. Id. at 35-36 (holding that the court had jurisdiction to review an SBA size determination, but plaintiffs claim was nevertheless not justiciable, because the plaintiff failed to file an appeal to the OHA prior to award which made the contract at issue “unchallengeable”); see also Int’l
Nevertheless, Plaintiffs proposed August 13, 2009 Amended Complaint also seeks: review of the July 1, 2009 OHA decision to affirm the April 28, 2009 SBA size determination for purposes of providing prospective relief in future procurements; reversal of the July 1, 2009 OHA decisions; and an “order[ ] that SBA cease its reliance on the improper OHA decision in SBA No. SIZ-5049 and remove any bar to [Plaintiff] self-certifying as small.” Am. Compl. ¶ 67(d)(vi). Such relief presumably would allow Plaintiff to self-eertify as small for procurements where the size standard is less than $7 million. Am. Compl. ¶ 7. Without such relief, Plaintiff contends it has no ability to compete for future small business set-aside contracts that it otherwise would be eligible to receive. Am. Compl. ¶ 64.
Plaintiff, however, is not barred from bidding on future procurements. The SBA regulations provide a procedure for re-certification as a small business and an application may be filed “at any time” and ultimately may be appealed to the OHA 13 C.F.R. § 121.1010. Importantly, 13 C.F.R. § 121.1101 provides explicitly that this administrative remedy “must be exhausted before judicial review of a formal size determination may be sought in a court.” (emphasis added). Therefore, the court’s consideration of Plaintiff’s request for injunctive relief is not ripe, since an alternative remedy exists to address Plaintiffs concerns about future procurements. Magellan Corp. v. United States, 27 Fed.Cl. 446, 447 (Fed.Cl.1993) (“The relevant inquiry in weighing this factor is whether plaintiff has an adequate remedy in the absence of an injunction.”).
Accordingly, the court has determined that Plaintiffs proposed August 13, 2009 Amended Complaint presents futile claims that would not survive a RCFC 12(b)(6) motion to dismiss. Plaintiffs proposed Amended Complaint presents claims that are either non-justiciable, because the court cannot provide the relief requested or has failed to exhaust administrative remedies making injunctive relief inappropriate. Therefore, Plaintiff’s August 13, 2009 Motion For Leave is denied.
2. Plaintiff’s Contract Disputes Act Claim.
a. The Government’s Argument.
The Government argues that the court does not have jurisdiction to adjudicate allegations regarding the alleged CDA violations, because Plaintiff has not filed a claim with the CO for a sum certain and the CO has not issued a final decision. Gov’t Mot. at 14-17; see also TR at 13-17.
b. Plaintiffs Response.
Plaintiff responds that a claim was submitted to the CO via e-mail on May 5, 2009 and, although the e-mail does not contain a specific dollar amount, the claim “focuses on and seeks ‘other relief arising under or relating to the contract’ at issue.” PI. Resp. at 21 (quoting 48 C.F.R. § 52.233-l(c)). Therefore, a claim does not need to assert a sum certain in this case. Id. Plaintiff also argues that the CO “fully and finally” denied Plaintiffs claim when the NGB terminated the January 5, 2009 Contract with Plaintiff and awarded the May 8, 2009 Contract to VETS. Id.
The Government replies that submitting a claim for a “sum certain” is an issue of “jurisdiction.” Gov’t Reply at 14. Plaintiff has not submitted a valid claim, because Plaintiffs claim for money is not “other relief;” the “other relief’ provision of 48 C.F.R. § 52.233-l(c) is directed to non-monetary remedies. Id. at 14-15. In addition, any request for the payment of money must include a sum certain. Id. at 15. Plaintiffs claim also was not “constructively denied” simply because the CO dismissed the agency level protest. Id. at 16. The act of terminating a contract does not mean that the CO is denying all of a contractor’s monetary claims. Id. Until the CO makes a final determination on a properly submitted claim, the court does not have jurisdiction to adjudicate Plaintiffs CDA claim. Id.
d. The Court’s Resolution.
The United States Court of Federal Claims has “jurisdiction to render judgment upon any claim by or against, or dispute with, a contractor arising under ... the Contract Disputes Act of 1978 [41 U.S.C. §§ 601-615 (2006).], including a dispute concerning termination of a contract.” 28 U.S.C. § 1491(a)(2); see also 41 U.S.C. § 609(a) (“Except as provided in paragraph (2), and in lieu of appealing the decision of the contracting officer under section 605 of this title to an agency board, a contractor may bring an action directly on the claim in the United States Court of Federal Claims, notwithstanding any contract provision, regulation, or rule of law to the contrary.”). An aggrieved contractor, however, must file a claim, with and receive a final decision from, the CO before it has standing to seek adjudication of a claim. Alliant Techsystems, Inc. v. United States, 178 F.3d 1260, 1267 (Fed.Cir.1999) (holding that “the Tucker Act gives the [United States] Court of Federal Claims jurisdiction over CDA claims only when ‘a decision of the contracting officer has been issued under section 6 of [the CDA].’ ”) (quoting 28 U.S.C. § 1491(a)(2)).
FAR 52.233-l(c) defines a “claim” as “a written demand or written assertion by one of the contracting parties seeking, as a matter of right, the payment of money in a sum certain, the adjustment or interpretation of contract terms, or other relief arising under or relating to the contract.” 48 C.F.R. § 52.233-l(c). Therefore, the United States Court of Appeals for the Federal Circuit has held that to achieve standing to request adjudication of a CDA claim: “(1) the contractor must submit the demand in writing to the contracting officer, (2) the contractor must submit the demand as a matter of right, and (3) the demand must include a sum certain.” H.L. Smith, Inc. v. Dalton, 49 F.3d 1563, 1565 (Fed.Cir.1995).
The May 5, 2009 e-mail from PlaintifPs counsel to NGB states that “TCI challenges any move to terminate its contract based upon the improper SBA decision as a breach and files this as a claim for lost profits, damages and attorneys fees on the subject contract pursuant to the Contract Disputes Act.” Id. (emphasis added). Plaintiff was required by the CDA, however, to “submit in writing ‘a clear and unequivocal statement that gives the contracting officer adequate notice of the basis and amount of the claim.’ ” Contract Cleaning Maint., Inc. v. United States, 811 F.2d 586, 592 (Fed.Cir.1987). No sum certain or even estimated amount of damages is set forth in the May 5, 2009 e-mail. PL Ex. 6. Although Plaintiff explains that the May 5, 2009 claim also “focuses on and seeks ‘other relief,’ ” the “other relief,” applies only to non-monetary claims. Garrett v. General Elec. Co., 987 F.2d 747, 749 (Fed.Cir.1993) (“The ... alternative to a monetary remedy the directive to correct or replace defective engines-constitutes ‘other relief within the FAR’s third category of ‘claims.’ ”).
The May 5, 2009 e-mail also fails to meet the FAR “matter of right” requirement. 48 C.F.R. § 52.233-l(e) (“A written demand or written assertion by one of the contracting parties seeking, as a matter of right, the payment of money in a sum certain, the adjustment or interpretation of contract terms, or other relief arising under or relating to [the] contract.”) (emphasis added). As the United States Court of Appeals for the Federal Circuit has explained, “[T]he phrase ‘as a matter of right’ in the regulatory
Finally, the CDA requires that, after receiving a claim, the CO “[will] issue [a] decision in writing, and [will] mail or otherwise furnish a copy of the decision to the contractor. The decision [will] state the reasons for the decision reached, and [will] inform the contractor of [the] rights as provided in this chapter.” 41 U.S.C. § 605(a). The United States Court of Federal Claims has held that whether a final decision has been issued depends on the nature of the communication between the CO and the contractor. Am. Red Ball Int., Inc. v. United States, 79 Fed.Cl. 474, 480 (2007). In this case, Plaintiff argues that the CO’s May 8, 2009 decision to terminate the January 25, 2009 Contract was a final decision of Plaintiffs May 5, 2009 CDA claim. PL Resp. at 21. Neither party, however, provided the CO’s termination letter to the court for review. Consequently, the court cannot determine if that letter may serve as a final decision under the CDA. In any event, Plaintiffs claim for lost profits, damages, and other fees alleged to be due, because of the alleged bad faith termination, is a separate and distinct claim from the Government’s termination for convenience. Armour of Am. v. United States, 69 Fed.Cl. 587, 590, 591 (2006) (holding that the United States Court of Federal Claims “does not have jurisdiction over a new claim or a claim of different scope that was not previously presented and certified to the contracting officer for decision.”).
Accordingly, because Plaintiff failed to file a valid claim, Plaintiffs alleged CDA violation also must be dismissed. England v. The Swanson Group, 353 F.3d 1375, 1379 (Fed.Cir.2004) (holding that “jurisdiction over an appeal of a contracting officer’s decision is lacking unless the contractor’s claim is first presented to the contracting officer and that officer renders a final decision on the claim[ ]”).
III. CONCLUSION.
For the reasons discussed herein, the Government’s May 19, 2009 Motion To Dismiss is granted in part. Claims regarding the alleged wrongful termination of the January 25, 2009 Contract, but asserted under 28 U.S.C. § 1491(b), are dismissed. Plaintiffs August 13, 2009 Motion For Leave To Amend the May 13, 2009 Complaint is denied.
Plaintiffs claims alleging violations of the Procurement Integrity Act, the Trade Secrets Act, and Contract Disputes Act, are stayed, to afford Plaintiff the opportunity to submit a valid claim to the CO for disposition of the alleged wrongful termination claim.
IT IS SO ORDERED.
. The facts cited herein primarily were derived from: the May 13, 2009 Complaint ("Compl.”); the Defendant ("Govemment")'s May 19, 2009 Appendix (“Gov’t App. 1-40”); and Plaintiff's May 26, 2009 Exhibits ("PI. Ex. 1-6"); Plaintiffs' June 10, 2009 Status Report ("6/10/09 PI. St. Rep."); Plaintiff's July 2, 2009 Status Report ("7/2/09 PL St. Rep."); and Plaintiff's July 8, 2009 Status Report ("7/8/09 Pi. St. Rep.”).
Because this case concerns proceedings before the National Guard Bureau, the Small Business Administration and the Office of Hearings and Appeals therein, and the United States Court of Federal Claims, a unified chronology is attached hereto as a Court Exhibit.
. Since the recent Twombly and Iqbal decisions place a high burden on a plaintiff at the pleading stage, due process considerations may require the production of the administrative record in some cases. For example, assuming arguendo that the court had jurisdiction to review final decisions by the SBA and/or OHA, the court would need a full administrative record to conduct the review required by the Administrative Procedure Act, 5 U.S.C. § 706, which states, in relevant part, that: "the court shall review the whole record or those parts of it cited by a party, and due account shall be taken of the rule of prejudicial error.” 5 U.S.C. § 706.
. Section 121.1004(c) of Title 13 of the Code of Federal Regulations provides that: "A timely filed protest applies to the procurement in question even though a contracting officer awarded the contract prior to receipt of the protest.” 13 C.F.R. § 121.1004(c).
. Section 121.1009(g)(1) of Title 13 of the Code of Federal Regulations provides that: "A formal size determination [by the SBA] becomes effective immediately and remains in full force and effect unless and until reversed by OHA.” 13 C.F.R. § 121.1009(g)(1).
. FAR 19.301-l(c) provides that: "If an offeror's small business status is challenged, the SBA will evaluate the status of the concern and make a determination, which will be binding on the contracting officer, as to whether the offeror is a small business.” 48 C.F.R. § 19.301 — 1 (c).
. FAR 19.302(g)(2) provides that: "If an award [is] made before the time the contracting officer received notice of the appeal, the contract shall be presumed to be valid.” 48 C.F.R. § 19.302(g)(2).
. The Government also argued that Plaintiff cannot challenge the SBA’s April 28, 2009 size determination in this court, because Plaintiff has not exhausted administrative remedies by appealing the SBA’s determination and receiving a final decision from OHA. Gov't Mot. at 8. (citing 13 C.F.R. § 121.1101(a)). This basis for dismissal, however, was satisfied by the July 2, 2009 and July 7, 2009 OHA decisions, filed after the Government's Motion to Dismiss was lodged on May 19, 2009.
. FAR 19.302 provides that:
(g)(1) Within 10 business days after receiving a protest, the challenged concern’s response, and other pertinent information, the SBA will determine the size status of the challenged concern and notify the contracting officer, the protester, and the challenged concern of its decision by certified mail, return receipt requested.
(2) The SBA Government Contracting Area Director, or designee, will determine the small business status of the questioned concern and notify the contracting officer and the concern of the determination. Award may be made on the basis of that determination. This determination is final unless it is appealed in accordance with paragraph (i) of this section, and the contracting officer is notified of the appeal before award. If an award was made before the time the contracting officer received notice of the appeal, the contract shall be presumed to be validf.]
(j) A protest that is not timely, even though received before award, shall be forwarded to*540 the SBA Government Contracting Area Office (see paragraph (c)(1) of this section), with a notation on it that the protest is not timely. The protester shall be notified that the protest cannot be considered on the instant acquisition but has been referred to SBA for its consideration in any future actions. A protest received by a contracting officer after award of a contract shall be forwarded to the SBA Government Contracting Area Office with a notation that award has been made. The protester shall be notified that the award has been made and that the protest has been forwarded to SBA for its consideration in future actions.
(k) When a concern is found to be other than small under a protest concerning a size status rerepresentation ... a contracting officer may permit contract performance to continue, issue orders, or exercise option(s), because the contract remains a valid contract.
48 C.F.R. § 19.302(g)(l — 2), (j), (k) (emphasis added).
. Subsequently, Plaintiff directly challenged the SBA's size determination, as well as the OHA affirmation of the SBA’s decision. Am. Compl. ¶ 7.
. FAR 19.302(g)(2) provides that:
the SBA ... will determine the small business status of the questioned concern and notify the contracting officer and the concern of the determination .... This determination is final unless it is appealed in accordance with paragraph (i) of this section, and the contracting officer is notified of the appeal before award. If an award was made before the time the contracting officer received notice of the appeal, the contract shall be presumed to be valid.
48C.F.R. § 19.302(g)(2).
. The May 13, 2009 Complaint also alleges violations of the Procurement Integrity Act, 41 U.S.C. § 423, as implemented by FAR 3.104-3(a) and 3104-4(b), the Trade Secrets Act, 18 U.S.C. § 1905; and the Competition In Contracting Act, 41 U.S.C. § 251, et seg. Compl. V¶ 44-46.
. This regulation gives the contracting officer discretion in applying a post-award OHA decision to a pending procurement. 13 C.F.R. § 121.1009(g)(3). This issue is now moot, because the OHA affirmed the SBA's April 28, 2009 size determination. Amend Compl. ¶ 7. Therefore, even if the CO had applied the July 1, 2009 OHA decision. Plaintiff still was "other than small” for purposes of the procurement at issue since the OHA affirmed the SBA size determination.
. FAR 19.302(g)(2) provides:
The SBA Government Contracting Area Director, or designee, will determine the small business status of the questioned concern and notify the contracting officer and the concern of the determination. Award may be made on the basis of that determination. This determination is final unless it is appealed in accordance with paragraph (i) of this section, and tlie contracting officer is notified of the appeal before award. If an award was made before the time the contracting officer received notice of the appeal, the contract shall be presumed to be valid.
48 C.F.R. § 19.302(g)(2).
. Section 121.1009(g)(3) of Title 13 of the Code of Federal Regulations provides:
If the formal size determination is appealed to OHA, the OHA decision on appeal will apply to the pending procurement or sale if the decision is received before award. OHA decisions received after contract award will not apply to that procurement or sale, bu1 will have future effect, unless the contracting officer agrees to apply the OHA decision to the procurement or sale.
13 C.F.R. § 121.1009(g)(3) (emphasis added).
. Section 1491(a)(2) of the Tucker Act provides that: “[t]he [United Stales] Court of Federal Claims shall have jurisdiction to render judgment upon any claim by or against, or dispute with, a contractor arising under section 10(a)(1) of the Contract Disputes Act of 1978, including a dispute concerning termination of a contract!.] " 28 U.S.C. § 1491(a)(2) (emphasis added).
. In addition, the court questions whether a claim for prospective relief is within the court’s Tucker Act Jurisdiction, i.e., “in connection with a procurement.” 28 U.S.C. § 1491(b)(1). Prospective relief would seem to fall outside "any stage of the federal contracting acquisition process.” Distributed Solutions, Inc. v. United States, 539 F.3d at 1345-46 (emphasis added).
. Because the court is denying Plaintiff’s Motion For Leave, the "Motion To Dismiss" portion of the Government’s Renewed Motion To Dismiss And Response To Plaintiff’s Motion For Leave, is premature. Likewise, the "Response" portion of Plaintiff's subsequent filing on September 25, 2009 is premature. Plaintiff’s "Reply” to the Government's Response is dismissed as untimely. RCFC 7.2(a)(2) (requiring replies be filed within seven days of a response filing).