[¶ 1] Superior, Inc. (“Superior”) appealed from summary judgment dismissing its action against Behlen Manufacturing Co. (“Behlen”). Superior argues the district court erroneously concluded that its claim was time barred by the four-year statute of limitations governing contracts for the sale of goods. Superior also contends the district court erred when it failed to apply the doctrines of equitable estoppel and equitable tolling, and when it held that Superior did not have a negligence claim against Behlen. We affirm.
I
[¶ 2] Superior is in the business of building grain bins. In 2001, Superior contracted to erect a grain bin for Oklee Farmers Elevator in Minnesota. On August 24, 2001, Superior submitted a purchase order requesting 5,300 “3/8" x 7/8" Grade 5 Bin Bolts” from Behlen. Behlen shipped 5,300 bolts, which Superior received sometime between August 24 and September 3. Behlen also sent an invoice describing the bolts as “BOLT HEX HEAD W/W 3/8 x 7/8.” The invoice did not specifically state the grade of the bolts. Superior used the bolts to assemble a grain bin for Oklee Elevator on September 3 through September 5, 2001. More than two years later, in early December 2003, the grain bin collapsed and about fifty thousand bushels of wheat spilled onto the ground. Superior built Oklee Elevator a new grain bin at no cost to the elevator and paid $12,226 to cover losses resulting from damaged wheat, cleanup costs, and lack of availability of the elevator.
In reviewing the correspondence which has been exchanged between your office and our insured, there seems to be a difference of opinion as to the proximate cause of the bin collapse. It seems that the best evidence in a case like this would be an engineer’s report following an inspection of the bin in question. It would be appreciated if you would let me know if the bin has been inspected by an engineer, and if so, then please favor us with a copy of that report.
Superior arranged to have an engineer inspect the collapsed bin. The inspection occurred on September 28, 2004, and the engineer provided Superior with his report on the collapse on March 9, 2005. From June 2005 through October 2005, the parties made settlement offers and counteroffers, but never came to an agreement about resolving the dispute.
[¶ 4] On March 9, 2006, Superior served Behlen with a summons and complaint alleging that Behlen improperly supplied grade two bolts, which resulted in the grain bin collapse. Superior sought $45,736.06 in damages for losses it incurred in rebuilding the grain bin and compensating Oklee Elevator for losses related to the bin collapse. Behlen moved for summary judgment, arguing that Superior’s claim was barred by the four-year statute of limitations governing contracts for the sale of goods. Superior contended that its claim was for indemnity from Beh-len and thus was governed by more general six-year statute of limitations for actions upon a contract, obligation, or liability.
[¶5] The district court granted summary judgment for Behlen holding that the four-year statute of limitations applied to Superior’s claim because the claim arose from a contract for the sale of goods. The district court concluded Superior’s claim was time barred because the summons and complaint were served more than four years after Behlen delivered the bolts. The district court also rejected Superior’s arguments for the application of equitable tolling and equitable estoppel, and held that Superior did not have a negligence claim against Behlen.
II
[¶ 6] Summary judgment is a procedural device for promptly resolving a controversy on the merits without a trial if there are no genuine issues of material fact or inferences that can reasonably be drawn from undisputed facts, or if the only issues to be resolved are questions of law.
Hasper v. Center Mut. Ins. Co.,
Ill
[¶ 7] Superior argues its claim against Behlen is for indemnity, not for breach of the sales contract, and therefore the six-year statute of limitations contained in N.D.C.C. § 28-01-16 should apply-
[¶ 8] Section 28-01-16(1) provides, “The following actions must be commenced within six years after the claim for relief has accrued: 1. An action upon a contract, obligation, or liability, express or implied, subject to the provisions of sections 28-01-15 and 41-02-104.”
[¶ 9] On the other hand, Behlen contends the four-year statute of limitations contained in N.D.C.C. § 41-02-104, which is part of our codification of the Uniform Commercial Code, should apply because the claim arises out of a contract for the sale of goods. Section 41-02-104 provides, in relevant part:
1. An action for breach of any contract for sale must be commenced within four years after the claim for relief has accrued. By the original agreement the parties may reduce the period of limitation to not less than one year but may not extend it.
2. A claim for relief accrues when the breach occurs, regardless of the aggrieved party’s lack of knowledge of the breach. A breach of warranty occurs when tender of delivery is made, except that where a warranty explicitly extends to future performance of the goods and discovery of the breach must await the time of such performance the claim for relief accrues when the breach is or should have been discovered.
[¶ 10] “An action does not become an action for indemnity merely because the pleader has so denominated it.”
Peoples’ Democratic Republic of Yemen v. Goodpasture, Inc.,
[¶ 11] Indemnity is an equitable remedy which permits a party to recover reimbursement from another for the discharge of a liability that, as between the two parties, should have been discharged by the other.
Grinnell Mut. Reins. Co. v. Center Mut. Ins. Co.,
[¶ 12] A right of indemnity may arise by express agreement or by implication.
Grinnell Mut. Reins. Co.,
[¶ 13] “Not every contract or contractual relationship will produce an implied indemnity.”
Hanscome v. Perry,
[¶ 14] In
Peoples’ Democratic Republic of Yemen v. Goodpasture, Inc.,
[¶ 15] The Second Circuit held there was no basis for finding an implied right of indemnification running from Goodpasture to Yemen. Id. at 351. The court concluded that Yemen’s claims amounted to nothing more than claims for consequential damages resulting from Goodpasture’s alleged breach of the grain sales contracts. Id. at 347, 351-52. In reaching this result, the court reasoned:
In the present case there is nothing special about the contractual relationship between Goodpasture and Yemen that would warrant implying in fact a contract for indemnification. Their grain sale agreements were fairly ordinary commodities contracts. There simply is nothing in them or in the parties’ dealings from which an agreement' 'to indemnify could “fairly be implied”. If an implied contract for indemnification were to be found here, one would have to be found in nearly every commodities sale contract that lacked a clause excluding it, a result that would reverse all standard contract and indemnity law. We therefore conclude there could be no implied contract for indemnity in this case.
Id. at 351 (citations omitted).
[¶ 16] We are persuaded by the rationale of the Goodpasture court. In this case, Superior and Behlen entered into a contract for the sale of bolts. Behlen allegedly breached this sales contract by delivering nonconforming grade two bolts. Superior used these nonconforming bolts to build a grain bin for a third party, which collapsed and resulted in damages. Superior argues that its claim against Behlen is for indemnity, not for breach of a sales contract. However, Superior does not point to any facts which would indicate a special relationship between the parties giving rise to a right of implied indemnity. Nor has Superior shown any unique or special factors-indicating that Superior and Behlen intended Behlen to be ultimately liable.
[¶ 18] Here, Superior had an adequate legal remedy to recover from Behlen the damages it paid to Oklee Elevator as a result of the grain bin collapse. Superior and Behlen entered into a contract for the sale of bolts, which was a transaction for the sale of goods governed by N.D.C.C. ch. 41-02, our enactment of the Uniform Commercial Code sales article. See N.D.C.C. § 41-02-02 (stating that “this chapter applies to transactions in goods”); N.D.C.C. § 41-02-05 (defining “goods”). Chapter 41-02 provides multiple remedies for the buyer in the event of the seller’s breach.
[¶ 19] Under N.D.C.C. § 41-02-93, the buyer may recover damages from the seller for breach of warranty when goods are accepted but later are discovered to be nonconforming.
See Leininger v. Sola,
2. Consequential damages resulting from the seller’s breach include:
a. Any loss resulting from general or particular requirements and needs of which the seller at the time of contracting had reason to know and which could not reasonably be prevented by cover or otherwise; and
b. Injury to person or property proximately resulting from any breach of warranty.
In
Hofmann v. Stoller,
While the distinction between the two is not an obvious one, the Code makes plain that incidental damages are normally incurred when a buyer (or seller) repudiates the contract or wrongfully rejects the goods, causing the other to incur such expenses as transporting, storing, or reselling the goods. On the other hand, consequential damages do not arise within the scope of the immediate buyer-seller transaction, but rather stem from losses incurred by the non-breaching party in its dealings, often with third parties, which were a proximate result of the breach, and which were reasonably foreseeable by the breaching party at the time of contracting.
Thus, the buyer may seek consequential damages from the seller when it incurs liability to a third party as a result of the use or resale of the seller’s product. See 1 James J. White & Robert S. Summers, Uniform Commercial Code § 10-4, at 726 (5th ed.2006).
[If 21] Superior’s claim is for breach of a sales contract, not for indemnity. Therefore, we apply the four-year statute of limitations governing contracts for the sale of goods, not the more general six-year contract statute of limitations. Under N.D.C.C. § 41-02-104, an action for breach of a sales contract must be commenced within four years after the claim for relief has accrued. In the case of a breach of warranty, the claim' accrues when tender of delivery is made, unless the seller makes a warranty explicitly extending to the future performance of the goods. No such explicit warranty was made in this case. See 1 James J. White & Robert S. Summers, Uniform Commercial Code § 11-9, at 765 (5th ed.2006) (stating that “it should be clear that this extension of the normal .warranty period does not occur in the usual case, even though all warranties in a sense apply to the future performance of goods”). Thus, Superior’s claim accrued upon tender of delivery.
[¶ 22] The latest possible date on which Behlen tendered the bolts was September 3, 2001. The four-year statute of limitations ran on September 3, 2005. Superior commenced suit on March 9, 2006, approximately six months after the statute of limitations had run. Therefore, the district court properly concluded that Superior’s action against Behlen is time barred.
IV
[¶ 23] Superior claims that if the four-year statute of limitations applies, the doctrines of equitable estoppel and equitable tolling preclude Behlen’s statute of limitations defense.
A
[¶ 24] The doctrine of equitable estoppel may preclude application of the statute of limitations as a defense by one whose actions misled another, thereby inducing that person not to file a- claim within the statutory period.
Muhammed v. Welch,
[¶ 25] In order to successfully implement the doctrine of equitable estop-pel, the plaintiff must carry the burden of proving three elements: (1) the defendant made statements intending that plaintiff would rely on them; (2) the plaintiff in fact relied on the defendant’s representations, and as a result failed to commence the action within the limitation period; and (3) the defendant’s statements were made pri- or to the expiration of the limitation period.
Hoffner v. Johnson,
[¶ 26] Here, Superior points to the letter from Behlen’s insurance company dated April 30, 2004, in support of its claim for equitable estoppel. Superior argues that it delayed in filing a lawsuit because Behlen strongly implied that settlement would occur after Superior obtained an engineer’s report about the cause of the grain bin collapse. However, the letter from Behlen’s insurer simply noted that there was a difference of opinion about causation and stated that an engineer’s report would be the “best evidence in a case like this.” The letter stated, “It would be appreciated if you would let me know if the bin has been inspected by an engineer, and if so,- then please favor us with a copy of that report.”
[¶ 27] We cannot find any statements in this letter, or any other correspondence between the parties, which would reasonably have led Superior to believe that a settlement would occur after an engineer’s report was obtained. In the letter dated April 30, 2004, Behlen asked for a copy of an engineer’s report if one existed. It did not demand that Superior obtain an engineer’s report, and it did not make any representations that settlement would follow such a report. Furthermore, the report was provided in March 2005, some nearly six months before the statute of limitations had run. We agree with the district court’s conclusion that the correspondence between Superior and Behlen amounted to nothing more than settlement negotiations. Therefore, the district court did not err when it held that Behlen’s statute of limitations defense was not barred by the doctrine of equitable estop-pel.
B
[¶ 28] This Court has never adopted the doctrine of equitable tolling,
see Riemers v. Omdahl,
V
[¶ 29] Superior contends the district court erroneously held it did not have a negligence claim against Behlen for improperly supplying grade two bolts, rather than the grade five bolts requested in Superior’s purchase order.
[¶ 30] In
Dakota Grain Co. v. Ehrmantrout,
[¶ 31] Here, Superior and Behlen entered into a contract for the sale of bolts. Apart from this sales contract, Behlen owed no independent duty to Superior. Therefore, the district court properly held that Superior did not have a negligence claim against Behlen.
VI
[¶ 32] We affirm the summary judgment dismissing Superior’s action.