The City of Portage (City) and its insurer, Employers Insurance of Wausau (Employers Insurance), appeal from an order denying their post-verdict motion to dismiss Sunnyside Feed Company's (Sunnyside) nuisance claim. The City and Employers Insurance contend that the trial court erred in concluding that the nuisance was continuing rather than permanent, and that Sunnyside's claim was time-barred under the six-year statute of limitations. We disagree and conclude that because the nuisance resulted in ongoing harm that could have been abated, it is a continuing nuisance. We therefore affirm that portion of the trial court's decision.
Sunnyside cross-appeals from an order denying its post-verdict motion for an injunction to abate the nuisance and denying its motion for a new trial on damages. We conclude that the trial court did not consider relevant factors when deciding whether to grant the injunction. We reverse and remand with instructions to issue an injunction ordering the nuisance abated. Because we conclude that an injunction should be issued, we need not consider whether the trial court erred by not instructing the jury that they could consider the historic value of the mill when deciding damages. Accordingly, we affirm in part and reverse in part.
*465 Background
The Sunnyside Feed Mill is a historic building located along the Portage Canal. In 1986 and 1987, the City conducted a restoration project along the canal. Contractors hired by the City altered the configuration of the canal bank behind the Sunnyside Feed Mill by removing subsoil and large boulders between the feed mill and the water's edge. These boulders provided support for the back of the feed mill, and their removal allegedly caused a gradual collapse of that portion of the mill, as well as ongoing damage to the building's foundation. The City replaced the boulders with cribs filled with washed gravel. However, the cribs contained voids, permitting sand and soil to migrate from underneath the mill.
In 1989, Sunnyside notified the City of the possibility of a claim regarding the ongoing damage to the mill's structure and foundation. About March 1, 1995, Sunnyside filed a notice of claim with the City. On October 22, 1996, Sunnyside sued, claiming the City was negligent in the manner in which it conducted the restoration project, and that its actions or inactions constituted an ongoing nuisance.
The City and Employers Insurance filed a motion for summary judgment, asserting that both claims were time-barred by an applicable statute of limitations. The trial court granted the motion for summary judgment on the negligence claim but denied it as to the nuisance claim. At trial, the jury found the City created a nuisance and awarded Sunnyside $10,000 in damages. Both sides filed post-verdict motions.
The City and Employers Insurance moved for judgment notwithstanding the verdict, dismissing the action. Sunnyside filed a motion for judgment on the verdict and a motion for injunctive relief ordering the *466 City to abate the nuisance and repair the structural damage to the mill. It also filed a motion to set aside the verdict as to damages, grant a new trial on damages, and for additur pursuant to § 805.15(6), Stats., because its damages were substantially greater than the jury's $10,000 damage award. The trial court denied all post-verdict motions. The City and Employers Insurance appeal, and Sunnyside cross-appeals.
Standard of Review
Both the appeal and the cross-appeal question whether the City's restoration project was a continuing or a permanent nuisance. The jury was asked only whether the City created a nuisance, and it answered "yes." Whether the nuisance was continuing or permanent first arose in the context of the City's motion for summary judgment. If a nuisance is continuing, the nuisance claim is not barred by a statute of limitations. In
Andersen v. Village of Little Chute,
If a nuisance is permanent, a suit must be commenced within the applicable statute of limitations.
Bartleson v. United States,
Whether the limitations period set forth in a statute requires dismissal of an action where the underlying facts are undisputed is a question of law that we review de novo.
See Linstrom v. Christianson,
The second time that the continuing or permanent nuisance issue arose was after the jury had found that the city had created a nuisance and awarded Sunny-side $10,000 in damages. In motions after verdict, Sunnyside asked the trial court for injunctive relief,
i.e.,
abatement of the nuisance. It would be unusual if
*468
we applied a different standard of review to the trial court's post-trial determination as to the nature of the nuisance than we did to the court's pre-trial determination. Still, whether to grant injunctive relief is within the sound discretion of the trial court.
See State v. Seigel,
Discussion
1. Appeal - Statute of Limitations
The City and Employers Insurance contend that the trial court erred in concluding that the nuisance was continuing rather than permanent and, therefore, not time-barred under the applicable statute of limitations. Wisconsin courts have not meaningfully addressed the distinction between permanent and continuing nuisances; we therefore turn to other jurisdictions for guidance.
2
In California, courts focus primarily on the type of harm caused by the nuisance
*469
when determining whether it is continuing or permanent. The decisions in
Baker v. Burbank-Glendale-Pasadena Airport Auth.,
In
Baker,
a group of homeowners living adjacent to an airport sued the airport authority for inverse condemnation and nuisance for the noise, smoke and vibrations caused by the flights over their homes.
See Baker,
In
Arcade Water Dist. v. United States,
The Ninth Circuit concluded that it was immaterial that the laundry facility was no longer operational. See id. at 1268. It concluded that because the harm was ongoing and capable of abatement, the contamination constituted a continuing nuisance. See id. As such, the court held that Arcade's nuisance claim was not time-barred.
Subsequent California cases confirm that the appropriate factors to consider in deciding whether a nuisance is continuing are: (1) whether it constitutes an ongoing or repeated disturbance or harm, and (2) whether it can be discontinued or abated.
See Bar-tleson,
William Sturtevant testified at length as to his opinion concerning the damage done to the mill by the City's canal restoration project. 3 He opined that the City erred in removing the boulders that supported the *471 foundation, and by using washed stone in the construction of the cribs between the mill and the canal. Sturtevant said that washed stone has voids, and the suction from these voids pulls fine particles of subsoil out from under the foundation wall, causing the foundation to settle. He testified that the fine soils underneath the mill continue to move, and the foundation wall continues to settle. Sturtevant also testified that there were a number of suitable engineering solutions to the foundation problem. His testimony as to the physical facts underlying his opinion as to causation is undisputed. We conclude based on this testimony that the harm caused by the City is ongoing and could be abated. We therefore affirm the trial court's decision that the nuisance found by the jury was a continuing nuisance.
2. Cross-Appeal - Injunction
Sunnyside argues that the trial court erroneously exercised its discretion by not granting an injunction ordering the City to abate the nuisance. A decision to grant or deny an injunction is within the trial court's discretion and should only be reversed upon an erroneous exercise of discretion.
See School Dist. of Slinger v. Wisconsin Interscholastic Athletic Ass'n,
There are two considerations when deciding whether to grant an injunction: (1) the movant has no adequate remedy at law; and (2) the movant will suffer irreparable harm if the injunction is not granted.
See Werner v. A.L. Grootemaat & Sons, Inc.,
The trial court was satisfied that there was an adequate remedy at law and denied Sunnyside's motion for injunctive relief. It held that Sunnyside's remedy was limited by the jury's verdict of $10,000, regardless of whether the amount was sufficient to correct the problem. The trial court stated that just because Sunnyside failed to persuade the jury that more damages were appropriate, it did not mean that the availability of money damages was an inadequate remedy.
Sunnyside contends that the trial court erroneously exercised its discretion by failing to consider the historic value of the mill when deciding whether to issue an injunction. Sunnyside points to federal, state and municipal laws that promote the preservation and protection of historic structures and sites. See 16 U.S.C. §§ 470 and 471; § 44.30, Stats.; Portage Ordinance § 13-6-5(b)(l). It argues that because the mill has been recognized as a historic structure, the trial court should ensure its protection. Sunnyside further contends that $10,000 in damages is insufficient to repair and preserve the existing structure from future settling. 4 We agree that the historic value of the mill is a proper consideration.
*473
Furthermore, because this case involves a continuing nuisance, Sunnyside can repetitively sue the City and Employers Insurance to recover its ongoing damages. An injunction will prevent the risk of repetitive and costly litigation by abating the nuisance. In the interest of judicial efficiency, courts should take reasonable steps to limit litigation.
See Barland v. Eau Claire County,
The jury accepted the testimony of William Sturte-vant because it found that the City created a nuisance. Sturtevant testified that the mill will continue to move until it falls into the canal. While we would ordinarily remand for the trial court's further consideration, we *474 conclude that, on the evidence presented, the only reasonable conclusion would be to issue an injunction. We therefore remand, with instructions to do so. We leave to the trial court's discretion questions as to the method and timing of the work necessary to abate the nuisance.
Sunnyside also contends that the trial court erroneously exercised its discretion when it failed to instruct the jury that because of the historic value or the historic character of the mill, the market value of the mill need not be a limit upon the amount of damages assessed. But because we have concluded that an injunction should be issued ordering the City to abate the nuisance, we do not consider the issue of monetary damages.
Conclusion
The nuisance found by the jury was determined by the trial court to be a continuing nuisance. Sunnyside's claim was therefore not time-barred by the six-year statute of limitations. As a result, we affirm the appeal. We conclude, however, that the trial court erroneously exercised its discretion by denying Sunnyside's motion for an injunction. As a result, we reverse and remand with instructions to issue an injunction requiring the City to abate the nuisance. We leave the methods and timing of the abatement to the trial court.
By the Court. — Order affirmed in part; reversed in part and cause remanded with directions.
Notes
Where damages are disputed, and the evidence is conflicting as to whether the nuisance is permanent or continuing, the question should be submitted to the jury.
See Cumberland Torpedo Co. v. Gaines,
Sunnyside relies upon
Verbeck v. Minneapolis, St. P. & S.S.M. Ry Co.,
The City offered the testimony of Glenn Koepp to refute Sturtevant's testimony. Koepp testified that the settlement was "due entirely as a result of placing the footing on unstable organic clay type soils which are inadequate to support the loads that were imposed on them." He further testified that in his opinion, the canal restoration project had no effect on the settlement on the north side of the building. He stated that the rock filled cribs helped stabilize the soil and prevent future settlement. The jury obviously believed Sturtevant.
Sunnyside asserts, based on the undisputed testimony of experts, that the cost of repairing the damage caused by the *473 City is around $300,000. Michael Solterman, a roofing contractor, testified at trial that it would cost $35,000 to repair the roof. David Allen Jakel, a salesman, testified as to the cost of repairing or replacing the spouts and leaking grain bins. He stated that the cost for labor and supplies was as follows: $2,470 for moving the spouts on the leg, $64,750 for liming the bins, and $1,500 for adjusting the distributor in the cupola. Richard Lynn, a commercial builder, testified that the cost of repairing certain structural problems with the mill, including the construction of a new foundation for the north side of the mill, would be between $125,000 and $175,000. The exhibits also included an estimate for $34,000 from Grout-Tech, Inc., to pressure grout the back wall of the structure.