On appeal, Webcor contends the trial court erred in instructing the jury using CACI No. 1009B, which, in Webcor's view, does not accurately state the holding of Hooker v. Department of Transportation (2002)
FACTUAL AND PROCEDURAL BACKGROUND
A. Webcor's Contract with the University of California and Subcontract with ACCO
In 2009, Webcor entered into a contract with the University of California (UC) for the "California Memorial Stadium Seismic Safety Improvements." Under the contract, Webcor was "solely responsible for initiating, maintaining, and supervising all safety precautions and programs
Webcor's Safety Manual was part of the contract documents that ACCO was required to follow. It required ACCO employees to report any unsafe practice or condition to their supervisor immediately, and also report unsafe conditions to Webcor. With regard to floor openings, the Webcor Safety Manual reminded ACCO to check that openings were covered and that covers were secured and identified.
B. Webcor's Expansion Joints and Safety Covers
An expansion joint is a gap left between concrete sections of a structure to allow the sections to move independently in the event of an earthquake. As part of the seismic upgrade of the stadium, Webcor created and constructed 50 expansion joints that were placed throughout the structure.
Before a permanent covering is installed over each expansion joint, there is a gap 12 inches wide and 12 inches deep in the concrete. The gaps must be covered or have guardrails around them. For the Project, Webcor's carpenters designed, constructed, and installed protective plywood covers for all of the expansion joints.
It was undisputed at trial that Webcor was responsible for the Project's general access areas, which were described as areas like "hallways" used by "everyone" including subcontractors for making deliveries and accessing different areas of the stadium. Strouse's accident occurred at an expansion joint in line 53, a general access area near a loading dock used by ACCO and other subcontractors to make deliveries. Because this was a high-traffic area, the safety covers for the expansion joints had to withstand two times the maximum anticipated load, which would require either a metal plate or two layers of three-quarter inch plywood that were secured and labeled "do not remove." Webcor's site safety manager, Joe Villela, instructed Webcor's carpenters to make sure the safety covers were secured and had smooth transitions.
Webcor's carpenter foreman, Victor Paz, testified that the safety covers were constructed with doubled-up three-quarter inch plywood, sized to cover the 12-inch gap. The wood was anchored with 16-penny nails, roto-hammered in place, and secured with pieces of tie wire. Webcor tested the
C. Reports of Unsecured Covers
Prior to Strouse's accident, Webcor knew that the safety covers in the line 53 area had been damaged or had become unsecured due to subcontractors removing them without securing them back in place. ACCO's general foreman Chris Ensel testified that he brought up the condition of the safety covers to Villela and informed him that people were removing safety covers to perform work in the expansion joints. The condition of the safety covers was "brought up more than a couple times" by Ensel and other tradesmen in the weekly foreman meetings when Webcor was asking for input. Ensel felt his concerns were not being adequately addressed, and he was dissatisfied with the response he received from Villela. Eventually, however, Ensel became "accustomed" to the condition and stopped bringing it up.
Ensel did not contact ACCO's safety department about the safety covers as required by ACCO's mitigation escalation path. He was aware that ACCO's subcontract required it to provide its employees with a safe place to work, but he felt this was not a "reachable goal" because Webcor was not adequately supporting ACCO.
D. Webcor's Retained Control of Safety on the Jobsite
Webcor's safety expert J. Robert Harrell testified that Webcor retained overall safety responsibility on the job site. Villela testified that he was responsible for conducting daily inspections of the jobsite to look for safety problems, as required by Webcor's contract with the UC, even on weekends if workers were present (as they were the weekend before Strouse's accident). Up to 12 superintendents and 12 foremen of Webcor were also required to perform daily inspections. Villela was responsible for documenting each of his daily inspections in an inspection report.
The last documented inspections before Strouse's January 9, 2012, accident were conducted on January 3, 4, and 5, 2012. There was no documentation of
Villela further testified it was his job to ensure that safety conditions at the jobsite complied with applicable Cal-OSHA regulations.
E. The Accident
On the morning of January 9, 2012, a crew of seven ACCO employees was unloading materials from an ACCO truck at an access point into the stadium. The ACCO crew made multiple trips across an expansion joint at line 53. The area around line 53 was covered with plywood.
Walking immediately in front of Strouse was Alexander Osborne, a first-year ACCO apprentice. As he walked across the expansion joint, he felt the plywood move a sixteenth to an eighth of an inch. Crossing the expansion joint behind Osborne was Strouse, who was carrying a large section of spiral pipe on his shoulder. As Strouse crossed the expansion joint, the plywood gave way. One of Strouse's legs went down into the joint, causing injuries to his knee, hip, and sacroiliac.
The safety cover involved in Strouse's accident appeared to have been modified from its original condition, as plywood had been pried up so that a cable could be run underneath. Strouse's safety expert, Fulghum, testified that the condition of the area around line 53, as depicted in the photographs, constituted a safety hazard. Even though two layers of plywood were used in some places, they appeared to be "lapped," and there were gaps and holes.
F. The Instant Lawsuit
In 2013, Strouse filed a complaint and first amended complaint against Webcor for general negligence. Webcor answered the first amended complaint and filed a cross-complaint against ACCO, seeking to enforce a contractual defense and indemnity provision against ACCO.
Trial commenced in March 2016. In April 2016, the jury rendered a special verdict finding that Webcor designed the safety cover where Strouse fell; Webcor retained control over the safety cover and safety conditions where Strouse fell; Webcor negligently exercised its retained control over safety conditions; and Webcor's negligence was a "substantial factor" in causing harm to Strouse. Finding that neither ACCO nor Strouse was negligent, the jury apportioned no fault to them and attributed 100 percent of the fault to Webcor. Judgment was entered in favor of Strouse in the amount of $ 2,626,750, and in favor of ACCO on Webcor's cross-complaint. Webcor moved for judgment notwithstanding the verdict (JNOV) and for a new trial. Both motions were denied.
ACCO moved for attorney fees as the prevailing party in Webcor's cross-action. The motion was granted in the amount of $ 298,843.
Webcor appealed the judgment, as well as the post-judgment orders denying its motions for JNOV and a new trial and the order granting ACCO's motion for attorney fees.
A. The Privette Doctrine and Exceptions
Webcor's contentions on appeal implicate the so-called " Privette doctrine" set forth in Privette v. Superior Court (1993)
In Privette , our Supreme Court held that when an employee of an independent contractor is injured in the workplace, he or she may not recover tort damages from the hirer of the independent contractor. The court concluded it would be unfair to permit the injured employee of an independent contractor to obtain full tort damages from the hirer because work-related injuries are compensable under the exclusive remedy of the Workers'
In Toland v. Sunland Housing Group, Inc. (1998)
In Hooker , supra ,
Hooker involved the death of a crane operator employed by a contractor hired by the California Department of Transportation (Caltrans) to construct an overpass. The decedent was killed when, after retracting the crane's outriggers to allow construction vehicles to pass, he attempted to swing the boom without first reextending the outriggers, causing the crane to tip over. (
In a footnote, Hooker explained that affirmative contribution "need not always be in the form of actively directing a contractor or contractor's employee. There will be times when a hirer will be liable for its omissions. For example, if the hirer promises to undertake a particular safety measure, then the hirer's negligent failure to do so should result in liability if such negligence leads to an employee injury." ( Hooker , supra ,
In McKown , the employee of an independent contractor was injured by a defective forklift that belonged to the hirer and which the hirer asked the contractor to use in performing the work. ( McKown , supra ,
In SeaBright Ins. Co. v. US Airways, Inc. (2011)
With these authorities in mind, we now turn to Webcor's claims of instructional error.
Webcor argues the trial court erred by instructing the jury with CACI No. 1009B, which omits any language that a hirer "affirmatively contribute" to the plaintiff's injury, and uses "substantial factor" causation in lieu of "affirmative contribution."
Webcor also contends the trial court erred by instructing the jury on negligence per se based on workplace safety regulations promulgated under Cal-OSHA because: (1) the jury was not first instructed to find affirmative contribution by Webcor; and (2) Webcor had delegated its Cal-OSHA responsibilities to ACCO in the subcontract.
"A party is entitled upon request to correct, nonargumentative instructions on every theory of the case advanced by him which is supported by substantial evidence." ( Soule v. General Motors Corp. (1994)
" 'That is not to say, however, that a failure properly to instruct a jury is necessarily or inherently prejudicial.' " ( Whiteley v. Philip Morris, Inc. (2004)
We address Webcor's claims of instructional error in seriatim.
1. CACI No. 1009B
CACI No. 1009B applies to claims against hirers for negligently retaining control over worksite safety. The instruction given by the trial court stated, in relevant part: "To establish this claim, Mr. Strouse must prove all of the following: [¶] 1. That Webcor Construction controlled the area of the worksite where James Strouse fell; and [¶] 2. That Webcor Construction retained control over safety conditions at the location where James Strouse fell; and [¶] 3. That Webcor Construction negligently exercised its retained control over safety conditions by failing to make sure the expansion joint covers were safe for people to walk over them; and [¶] 4. That James Strouse was harmed; and
The crux of Webcor's instructional error claim as to CACI No. 1009B is that it wrongly equates "substantial factor" causation with "affirmative contribution" even though they are distinct legal concepts.
This same argument was rejected by the Court of Appeal in Regalado v. Callaghan (2016)
Attempting to sidestep this holding, Webcor argues that Regalado "was really a sufficiency of the evidence case" and that the court's discussion of CACI No. 1009B was "dicta." This is incorrect. The portion of Regalado discussed above was not dictum because it was hardly " 'unnecessary to the decision in the case.' " ( People v. Vang (2011)
We acknowledge there are differing viewpoints among the courts that have touched upon this issue. (Compare
"[W]hen deciding whether an error of instructional omission was prejudicial, the court must also evaluate (1) the state of the evidence, (2) the effect of other instructions, (3) the effect of counsel's arguments, and (4) any indications by the jury itself that it was misled." ( Soule , supra , 8 Cal.4th at pp. 580-581,
Here, the state of the evidence strongly supports the inference that the jury found Webcor to have affirmatively contributed to Strouse's injury. Although in reviewing claims of instructional error, we must view the evidence in the light most favorable to the appellant ( Regalado , supra ,
Additionally, the fact that the jury apportioned no fault to ACCO or Strouse and 100 percent fault to Webcor necessarily establishes its determination that Webcor's liability "is not ' "in essence 'vicarious' or 'derivative' in the sense that it derives from the 'act or omission' of the hired contractor." ' " ( Hooker , supra,
We see nothing in counsel's arguments at trial that may have capitalized on the claimed instructional error. Webcor cites portions of the closing argument of Strouse's counsel in which he argued that CACI No. 1009B was "the key instruction" regarding Webcor's liability, and called the lack of inspections in the days before the accident "a big deal in this case." But Strouse's counsel also argued that Webcor negligently exercised its retained control over safety conditions by failing to make sure the safety covers were safe and secure; that the accident took place in a general access area that Webcor controlled; and that Webcor built, maintained, and was the responsible party for the condition of the safety covers. Meanwhile, Webcor's counsel clarified in his closing argument that in order to find Webcor's conduct was a substantial factor in Strouse's injury, the jury had to find that Webcor provided "a substantial contribution to the harm," which was more than simply "preventing [the condition] from existing." Taken together, counsels' arguments properly directed the jury to determine whether Webcor affirmatively contributed to the injury.
Finally, there is no indication in the record of jury confusion. The jury requested no rereading of CACI No. 1009B, submitted no questions concerning the substantial factor standard,
After an examination of the entire cause, we conclude Webcor has not demonstrated a reasonable probability that it would have obtained a more
2.-4.
5. Negligence Per Se
The trial court instructed the jury on negligence per se under CACI No. 418. The instruction first provided the text of Cal-OSHA section 1632(a) and (b) (see ante , fn. 1), and then stated: "If you decide: [¶] 1) That Webcor Construction violated this law, and [¶] 2) That the violation was a substantial factor in bringing about the harm to James Strouse, then you must find that Webcor Construction was negligent. [¶] If you find that Webcor Construction did not violate this law or that the violation was not a substantial factor in bringing about the harm, then you must still decide whether Webcor Construction was negligent in light of the other instructions that are given."
Webcor argues the trial court erred in giving the jury a negligence per se instruction because an alleged violation of a Cal-OSHA regulation cannot be the basis for civil liability against a general contractor where compliance with that regulation has been delegated to the subcontractor. Webcor relies on Ruiz v. Herman Weissker, Inc. (2005)
First, the premise of Webcor's argument is that the negligence per se instruction was necessarily used in this case to establish Webcor's duty of care. But Webcor provides no factual foundation for this claim of error, i.e., it provides no record cite indicating Strouse or ACCO relied on the Cal-OSHA requirements to establish an independent duty of care, as opposed to the relevant standard of care. Under Labor Code section 6304.5, "[s]ections 452 and 669 of the Evidence Code shall apply to this division and to occupational safety and health standards adopted under this division in the same manner as any other statute, ordinance, or regulation."
Second, we are unpersuaded by Webcor's contention, based on SeaBright , that it was error to instruct the jury on
Webcor further argues it was error to give a negligence per se instruction without first instructing the jury on affirmative contribution because, under Millard , supra ,
For these reasons, we conclude the trial court did not err in giving a negligence per se instruction.
DISPOSITION
The judgment is affirmed. Strouse and ACCO shall recover their costs on appeal.
WE CONCUR:
Siggins, P.J.
Petrou, J.
Notes
The applicable Cal-OSHA regulation is found in California Code of Regulations, title 8, section 1632 (hereinafter "section 1632"), part of subchapter 4, entitled "Construction Safety Orders." It requires floor openings at a construction site to be "guarded by ... covers." (Cal. Code Regs., tit. 8, § 1632, subd. (b)(1).) "Covers shall be capable of supporting the greater of 400 pounds or twice the weight of the employees, equipment and materials that may be imposed on any one square foot area of the cover at any time. Covers shall be secured in place to prevent accidental removal and displacement, and shall bear a pressure sensitized, painted, or stenciled sign with legible letters not less than one inch high, stating: 'Opening-Do Not Remove.' Markings of chalk or keel shall not be used." (Id ., subd. (b)(3).)
Under the Workers' Compensation Act, "an employer that provides compensation coverage has no further liability for workplace injuries to an employee. Therefore, if a nonnegligent third party pays damages for an employee's injuries that are attributable in whole or in part to the negligence of the employer, the [Workers' Compensation] Act's limitations on employer liability preclude the third party from obtaining equitable indemnity from the employer." (Privette , supra ,
In its reply brief, Webcor additionally contends that under Trejo v. Johnson (2017)
In Sandoval v. Qualcomm Inc. (2018)
The jury had only two questions. The first was directed to question 7 on the special verdict form regarding the design of the expansion joint cover. The second was regarding damages and whether they could have an itemized list of the past medical expenses that were part of the stipulated amount presented to them.
See footnote *, ante .
"Evidence Code section 452 permits judicial notice of state statutes and regulations. [Citation.] Evidence Code section 669, subdivision (a) codifies the common law doctrine of negligence per se, under which statutes and regulations may be used to establish duties and standards of care in negligence actions: The failure of a person to exercise due care is presumed if: [¶] (1) He violated a statute, ordinance, or regulation of a public entity; [¶] (2) The violation proximately caused death or injury to person or property; [¶] (3) The death or injury resulted from an occurrence of the nature which the statute, ordinance, or regulation was designed to prevent; and [¶] (4) The person suffering the death or the injury to his person or property was one of the class of persons for whose protection the statute, ordinance, or regulation was adopted." (Millard v. Biosources, Inc. (2007)
See footnote *, ante .