110 Ga. App. 546 | Ga. Ct. App. | 1964
1. The present companion cases are here on separate bills of exceptions, each bill of exceptions being-brought by the single plaintiff in the respective suits against the same defendants assigning error on the sustaining of the defendant’s general demurrers to the respective petitions. A motion is made to dismiss the two bills of exceptions under authority of § 5 of Georgia Laws 1957, pp. 224, 234 (Code Ann. § 6-919), and Scales v. Peevy, 103 Ga. App. 42 (118 SE2d 193), and Life Ins. Co. of Ga. v. Blanton, 109 Ga. App. 116 (135 SE2d 437) construing said Act. This Act relates solely to the requirements necessary for the filing of a single bill of exceptions by two different plaintiffs in error. Here we have no such, situation. The motion to dismiss is denied.
2. “While a county is not liable to suit unless made so by statute, it has been provided by. a statute of this State that a county is primarily liable for all injuries caused by reason of any defective bridges, whether 'erected by contractors or county authorities; . . .” Berrien County v. Vickers, 73 Ga. App. 863 (38 SE2d 619). “When the contract for a public bridge, ferry, or causeway is let, the contractor’s bond shall be conditioned' also to keep it in good repair for at least seven years, and as many inore years as may be covered by the contract: Provided, that such contract may be let under existing laws without requiring the aforesaid condition in the contractors’ bonds, if in the opinion of the commissioners of roads and revenues, or of the ordinary in counties where there are no such commissioners, it would be to the public interest to dispense with said condition in said bond: Provided, however, that in every case the county shall be primarily liable for all injuries- caused by reason of any defective bridges, whether erected by contractors or county authorities. The term ‘bridges’ in this section shall be defined as a structure erected to afford unrestricted vehicular traffic’ over an obstruction in the public highways of the State, including rivers, streams, ponds, lakes, bays, ravines, gullies, railroads, public highways and canals; the term bridge as defined in this section shall include the approaches to the structure previously defined within 50 feet of either end of said struc
3. “It is the duty of the proper county. authorities to construct and maintain bridges, across streams in a workmanlike and proper manner, so that any person may use them with safety, in ordinaiy travel, but this'duty is not one of extraordinary care and diligence, npr does its exercise extend to extraordinary occasions, beyond the ken of general experience. The law does not make the county authorities insurers of the safety of any of those who use bridges.” Stamps v. Newton County, 8 Ga. App. 229 (5) (68 SE 947). Lincoln County v. Gazzaway, 43 Ga. App. 358, 359 (158 SE 647); Cox v. Ware County, 52 Ga. App. 45, 46 (182 SE 408); Grady County v. Banker, 81 Ga. App. 701 (6) (59 SE2d 732).
4. “In a suit against a county for damage alleged to have been caused by a defective bridge, the plaintiff cannot recover unless the proper county authorities had knowledge of the defective condition, or unless the defect had existed for such a length of time that knowledge thereof on the part of the county authorities would be presumed (Stamps v. Newton County, 8 Ga. App. 230 (3b), 68 SE 947); and it is a jury question as to what length of time a defect in a bridge must exist before a county is charged with knowledge of negligence. City of Rome v. Brooks, 7 Ga. App. 244 (66 SE 627); Enright v. Atlanta, 78 Ga. 289.” Nunez v. Emanuel County, 22 Ga. App. 219 (95 SE 718).
5. “A defect in a bridge, which serves as the basis for liability by a county for injuries received by reason thereof, includes any condition of the bridge which renders the bridge unsafe for travelers passing over the bridge..’; Havird v. Richmond County, 47 Ga. App. 580 (3) (171 SE 220).
6. While a county may be under no duty to place signs warning of the defective condition of a bridge upon its highway, and a failure to so do might not be accounted negligence, Wilkes County v. Tankersley, 29 Ga. App. 624 (3) (116 SE 212), Newberry v. Hall County, 52 Ga. App. 472 (6) (183
7. General allegations of negligence are sufficient to withstand a general demurrer. Pullman Palace Car Co. v. Martin, 92 Ga. 161 (18 SE 364).
8. “A suit may be maintained against a county and a verdict and judgment obtained against it for damages resulting from a defect in a bridge, although it may appear that jurisdiction over the highway on which the bridge was located had been assumed by the Highway Department under terms of law, and that the department, and not the county, was guilty of the negligence in the maintenance and construction of the bridge or its approaches which caused the injury; for, in contemplation of the law, the negligence charged against the Highway Department is the negligence of the county.” Ber
9. It follows, therefore, that the trial court erred in sustaining general demurrers to the petitions against a county and a contractor alleging that the proper authorities of the county in conjunction with the State Highway Department of Georgia entered into a contract with the contractor for the building of a new bridge over a stream and for the construction of a temporaiy bridge to be used while the new 'bridge was being built, and that a temporary wooden bridge was constructed and open for traffic, although some work was still being done thereon, sometime prior to December 26, 1962, when plaintiffs were injured as a result of their automobile skidding on the bridge; that the temporary bridge was constructed with heavy wooden planks placed on the top of pilings and that the planking used on the floor of the bridge was of such quality that when the lumber became either wet or damp it became exceedingly slippery so that it was not safe for vehicular traffic; that the defendant contractor was put on notice prior to December 26, 1962, of the slippery condition of the planking; that during the interim between the time the temporary bridge was opened, which was on or about December 19, 1962, and December 26, 1962, several automobiles were damaged as the result of the slippery condition of the bridge surface; that the defendants knew, or should have known, of the dangerous and defective condition of the bridge when it became moist and each of the defendants was negligent in not placing signs along the approaches showing the dangerous and slippery condition of the bridge; that on December 24, 1962, two days before plaintiffs’ injuries, an automobile traveling over the temporary bridge turned over on its top, skidded along the surface of the bridge spilling oil from its crank case and the already slippery condition of the bridge was worsened by the oil which had spilled, portions of which were still on the bridge which had not been cleaned by defendants, and that the defendants were negligent as follows: (a) In not finishing off the bridge so as to prevent the
Judgments reversed.