It was sought in this suit to enjoin defendants from constructing and maintaining a dam across the mouth of Rock lake, for the purpose of utilizing the lake as a storage reservoir. The court below so decreed to the defendant Irrigation & Power Company, from which this appeal is taken.
Rock lake is a navigable body of water, about nine miles long and from one-hаlf a mile to three miles wide. Its outlet is Rock creek, which flows westerly to a junction with Palouse river. Respondents are the owners of lands about ten miles west of Rock lake, through and across which. Rock creek flows. The appellant company is the owner of lands bordering the mouth of the lake; аlso lands riparian to the Palouse river below its junction with Rock creek, and other lands still farther down in the Washtucna coulee. Respondents’ lands are in four tracts, and were acquired at different times; two tracts by Federal patent in 1901 and 1902, and two by purchase from Federal grantees in 1897 and 1904. Rock crеek is a small stream, but in the late winter and early spring the rains and melting snow cause the waters of the lake to rise, increasing the flow of the creek until it flows through natural channels over respondents’ lands, covering in flood season about one hundred acres, which, by reason of its deposits and watering of thе land at a time when the crops are dormant, is of great benefit to respondents. For the purpose of utilizing these flood waters and controlling the flow over their lands, respondents have constructed small dikes and dams across the overflow channels. They have also a ■small irrigating system to reach lands not covered by the overflow.
The appellant company in 1909 and 1910 constructed a dam three feet high across the mouth of the lake, its purpose being to use the lake as a reservoir for the impounding of its waters. The dam is constructed with gates, and the contemplated purpose is to leave the gates open until the flood waters of the early spring rise above the dam, when the gates will
There can be no doubt but that the scheme of appellant, if permitted to impound the waters of the lake in the spring months, would cause a serious interference with respondents’ use of the waters of Rock creek, diminishing and curtailing its naturаl flow, wholly preventing the annual spring overflow upon respondents’ lands, which is their greatest asset and factor of value, except as appellant might at its option release the waters of the lake through the gates of its dam. Such an alteration in the natural flow of a stream is not permissible. A riрarian owner, such as respondents are here shown to be, has a right to the natural flow of waters in their natural and accustomed channels without diminution or alteration, subject only to the same right and use in every other riparian owner, a right that is as much included in the ownership of the land as the soil itself, and сan no more be interfered with by the acts of others. And while the application of this doctrine has in some of the western states sometimes been denied, on the theory that the rules of the common law respecting riparian owners were inapplicable to conditions and necessities of the people in the particular localities where the cause of action arose, it has, since its first announcement here, invariably been upheld in this state, except where it has been subjected to a priority of appropriation. Crook v. Hewitt,
The contemplated detention of the watеrs' of Rock creek, through their impounding in the lake, practically amounts to a total detention at unknown times, when, with their natural spring flow, they would, he serving their best purpose to respondents. Water may not thus be gathered into reservoirs' for future use, when it may best Suit the convenience and use of' one ripаrian owner, and thus deprive other riparian owners of their use and service of the stream in its natural condition, unless such right is exercised under a valid prior appropriation. Monroe Mill Co. v. Menzel,
Appellant purposes to release these waters in August or September, when they will be used to increase the natural flow of the Palouse river. Rock creek through respondents’ lands can only accommodate about one hundred cubic feet of water, and to permit these waters to then be released and flood the creek above its summer' level would mean an overflow of its waters upon respondеnts’ lands when they were in crop, with its consequent damage. Appellant insists that it is only using waste waters, and that it has the right to use the so-called flood waters, citing Edgar v. Stevenson,
Where, however, as in this case, annual floods have caused streams to overflow from time immemorial, and such overflow has spread over lands, enriching and fertilizing them with its deposits, the California courts have invаriably held that such waters were not -subject to impounding by the upper owner, and that they were not extraordinary and unusual waters, within the meaning of Edgar v. Stevenson and like cases. In Miller & Lux v. Madera Canal & Irr. Co.,
“There is no good reason for saying that the greatly increased flow following the annually recurring fall of rain and mеlting of snow in the region about the head of the stream is any less usual or ordinary than the much diminished flow which comes after the rains and the melted snows have run off.”
Again:
“It cannot be said that a flow of water, occurring as these waters are shown to occur, constitutes an extraordinary and unusual flow. In fact, their occurrence is usual and ordinary. It appears that they occur practically every year and are reasonably expected to do so, and an extraordinary condition of the seasons is presented when they do not occur; they are not waters gathered into the stream as the result of occasional and unusual freshets, but are waters which on account of climatic conditions prevailing in the region where the Fresno river has its source are usually expected to occur, and do occur.”
Gould on Waters, § 211, is cited, where it is said that:
“Ordinary rainfalls are such as are not unprecedented or extraordinary; and hence flood and freshets' which habitually occur and recur again, though at irregular and infrequent intervals, are not extraordinary and unprecedented. It has been well said that ‘freshets are regarded as ordinary which*611 are well known to occur in the stream occasionally through a period of years though at no regular intervals.’ ”
To the same effect are: California Pastoral etc. Co. v. Enterprise Canal & Land Co.,
In this case the respondents do make use of these high waters, and the greatest use and benefit to their land comes from such use. Rock creek commences to rise in cold weather, and continues to rise gradually and very slowly, until the spring rains or a thaw increases its volume of water. If commences to overflow respondents’ lands in January, and continues until late in March or April, when it gradually recedes, until about July it has left the lands. Respondents then commence their irrigation of the lands not overflowed, and irrigate in July, August, and September. So that they make a constant use of thеse waters from January to September. If the high waters of winter are impounded by appellant’s dam, respondents will be deprived of a very material and beneficial use of these waters; in fact, their greatest and most beneficial use. They will be withheld from them in the early spring when required for the irrigation of thеir crops, and released in August and September when any overflow would be detrimental to their crops. This condition of Rock creek is not an extraordinary or unusual condition. It is a natural condition. With the exception of the fall months, the creek is either rising or falling, and we can see no reason why the use of the creek in its rise is not as much a use of its natural and ordinary condition as its use when its waters are receding. That respondents have this right to the overflow seems unquestioned, a right that is as clear as any riparian right can be.
“The right which a party has to the use of water flowing over his own land is undoubtedly identifiеd with the realty, and is a real or corporeal hereditament.” Cary v. Daniels, 5 Met. (Mass.) 236.
“And all surplus water over and above such actual appropriation and use, together with the water in all lakes, rivers, and other sources of water supply, upon the public lands and not navigable shall remain and be held free for the appropriation and use of the public for irrigation, mining, and manufacturing purposes subject to existing right.”
This contention has been suggested by two Oregon cases, Williams v. Altnow,
“In 1892 surveys were made; in 1893 a dam was constructed and twelve miles of ditch dug; in the winter of 1893 part of the dam was taken out; in 1894 the company went into the hands of a receiver. The receivership lasted two years, during which time no extension was made of the work and the only work done was some effort to stоp the decay of property. The extent of this effort'is not shown. In 1897 another dam was built which went out the following winter. In 1898 they irrigated a tract of forty acres; in 1902 they irrigated twenty acres. From 1904 to 1906 no irrigation whatever. In 1897 part of the head works washed out, which were not replaced until 1907. In 1906 defendant Peters purchased the project, which was then unused and out of repair, and six month's later transferred it to defendant company, which began construction, built a dam and head works, and has prosecuted its work with diligence and is now irrigating three hundred acres. This testimony establishes not an appropriation and continuous prosecution of the work of applying the water to a beneficial use, but three several appropriations : First, in 1893 an appropriation which was forfeited by the failure of the company and abandonment of the work; second, an appropriation and slight efforts toward the use of thе water in 1897; third, an appropriation and considerable diligence by this defendant in 1907.”
These facts, justified by the record, amply sustain the court’s holding that there was no valid and existing prior appropriation prior to the assertion of respondents’ rights in 1897, in that it lacks the necessary element of an accompanying reasonable diligence in the prosecution of the work.
“There must be diligence in prosecuting the construction work. This was a requisite from the earliest days for all appropriators claiming the benefit of the doctrine of relation, and remains: to the present day wherever the law of appropriation is in force.” Wiel, Water Rights, § 124.
It is true, as suggested by appellant, that enterprises of this character cannot be completed all at once, and that some element of time must elapse between its inception and its completion. There can, however, be such an exercise of diligent effort to complete the scheme, and such a use of water аs to definitely indicate a purpose to continue its use, and to persevere to the final accomplishment of the project, such as is not shown by this record to have occurred between the appropriations of 1892 and 1893, and the condition of the project when this suit was: instituted. The original аppropriation in 1892 was to take 10,000 cubic feet of water per second. The next was for 5,000 cubic feet per second. And the extent of the use was the irrigation of forty acres in 1898. In 1902 the use had dropped to twenty acres, and from 1904 to 1906 no irrigation at all. Nor was there any attempt to repair the headgate, washed out in 1897, until 1907. We can find no diligence with such a record, and nothing that indicates anything other than an abandonment. If not an abandonment, it was certainly not such a continuous, use as to amount to a bona fide appropriation against the rights of others, diligently and continuously used and asserted.
Concurring with the court below in its finding and conclusions, the judgment is affirmed.